IR 05000321/1986006

From kanterella
Revision as of 01:39, 21 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Partially Withheld Insp Repts 50-321/86-06 & 50-366/86-06 on 860224-28 & 0318-19 (Ref 10CFR2.790(d) & 73.21).Violations Noted:Inadequate Compensatory Measures Following Alarm Failure After Computer Malfunctions
ML20198K659
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/07/1986
From: Masnyk O, Mcguire D, Thompson D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20198K649 List:
References
50-321-86-06, 50-321-86-6, 50-366-86-06, 50-366-86-6, NUDOCS 8606040098
Download: ML20198K659 (1)


Text

, p Keco SAFEGUARDS INFORMATION UNITED STATES

, o NUCLEAR REGULATORY COMMISSION

  • '

= ,

pf REGloN li f, f 101 MARIETTA STREET. N *' t ATLANTA, GEORGIA 30323

\.v / * ..* MAY 281986 Report Nos. 50-321/86-06 and 50-366/86-06 Licensee: Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302 Docket Nos. 50-321 and 50-366 License Nos. DPR-57 and NPF-5 Facility Name: Hatch Inspection Dates: February 24-28 and March 18-19, 1986 Inspectors: b bMl / h O. M. Hasnyk, Physical Gecurity Specialist

,

Dat'a ' Signed ' Q A$ so H. Thomp on, P5ysical Security Specialist h

'6at( Signed Approved by: A _ S 7 [2 D. R. McGuire, Chief, Physical Security Section ' 'Date Signed Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope: This routine, unannounced inspection entailed 62 inspector-hours on site (five hours on backshift) by two inspectors, accompanied by D. R. McGuire, Chief, Physical Security Section Chief, inspecting: Security Plan and Implementing Procedures; Management Effectiveness; Security Organization; Records and Reports; Physical Barriers - Protected Area; Lighting; Compensatory Measures; Assessment Aids; Access Control - Personnel; Access Control - Packages; Access Control - Vehicles; Detection Aids -

Protected Area; Alarm Stations; Communications; and Personnal Training and Qualificatio Results: The licensee was found to be in compliance with regulatory requirements with the following exceptions:

86-06-01 Failure to maintain adequate documentatio Inadequate compensatory measure at temporary protected area gg barrie meica E8' 86-06-04 Inadequate security system compute N mo 86-06-05 Inadequate compensatory measures following loss of alarm capability mg in both central and secondary alarm stations.

l $8 g 86-06-06 Failure to report security events.

i O l g, 86-06-07 Failure to perform functional test following security computer g system failur tectosuns: cc:rt Ai,y urEcunos inrowanou SAFEGUARDS INFORMAy.> - upoxar n u n onrnis PAGE15 DECONTROLLED.