IR 05000321/1999009 | 7 October 1999 | Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823- 27.One Violation Being Treated as Ncv.Major Areas Inspected: Maint & Engineering | Safe Shutdown Power Uprate |
IR 05000321/1999005 | 16 September 1999 | Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | High Radiation Area Locked High Radiation Area |
IR 05000321/1999004 | 4 August 1999 | Insp Repts 50-321/99-04 & 50-366/99-04 on 990530-0710.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Power change |
IR 05000321/1999010 | 20 July 1999 | Insp Repts 50-321/99-10 & 50-366/99-10 on 990616-25.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Problem Identification & Resolution & Corrective Actions | Half scram Temporary Modification Condition Adverse to Quality |
IR 05000321/1999003 | 25 June 1999 | Insp Repts 50-321/99-03 & 50-366/99-03 on 990418-0529.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support | Temporary Modification Power Uprate |
PNO-II-99-025, on 990615,CR Operators Manually Shutdown Unit 2 Reactor from 41% Power,Due to Decreasing Condenser Vacuum. Cause of Decreasing Vacuum Has Not Been Determined.All Rods Installed as Required & All Safety Sys Functioned Properly | 17 June 1999 | PNO-II-99-025:on 990615,CR Operators Manually Shutdown Unit 2 Reactor from 41% Power,Due to Decreasing Condenser Vacuum. Cause of Decreasing Vacuum Has Not Been Determined.All Rods Installed as Required & All Safety Sys Functioned Properly | |
PNO-II-99-016, on 990505,Hatch Unit 2 Had Main Generator Trip Form 98% Power,Due to Electrical Fault.Licensee Continuing Investigation Has Been Hampered Due to Inclement Local Weather Conditions.Plant Being Depressurized | 7 May 1999 | PNO-II-99-016:on 990505,Hatch Unit 2 Had Main Generator Trip Form 98% Power,Due to Electrical Fault.Licensee Continuing Investigation Has Been Hampered Due to Inclement Local Weather Conditions.Plant Being Depressurized | |
IR 05000321/1999002 | 6 May 1999 | Insp Repts 50-321/99-02 & 50-366/99-02 on 990307-0417.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | High Radiation Area Weld Overlay Nondestructive Examination Temporary Modification Foreign Material Exclusion Scram Discharge Volume |
IR 05000321/1999001 | 2 April 1999 | Insp Repts 50-321/99-01 & 50-366/99-01 on 990124-0306.Non- Cited Violations Identified.Major Areas Inspected:Maint, Operations & Plant Support | Fire Barrier Fire Protection Program |
IR 05000321/1998009 | 24 February 1999 | Insp Repts 50-321/98-09 & 50-366/98-09 on 981213-990123.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Covers Insp in Health Physics & Independent Spent Fuel Storage | Operability Assessment |
IR 05000321/1998007 | 29 December 1998 | Insp Repts 50-321/98-07 & 50-366/98-07 on 981101-1212.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support | Power Uprate |
IR 05000321/1998006 | 24 November 1998 | Insp Repts 50-321/98-06 & 50-366/98-06 on 980920-1031. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support | Offsite Dose Calculation Manual |
IR 05000321/1998005 | 15 October 1998 | Insp Repts 50-321/98-05 & 50-366/98-05 on 980802-0919.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Insp Also Included Insps by Regional Maint & Emergency Preparedness | High Radiation Area Grab sample Fire Barrier Maintenance Rule Program |
PNO-II-98-040, on 980917,licensee Declared Notification of Unusual Event Based on Transport of Two Injured & Potentially Contaminated Individuals to Local Hospital.Two Individuals Found Not to Have Sustained Serious Injury | 18 September 1998 | PNO-II-98-040:on 980917,licensee Declared Notification of Unusual Event Based on Transport of Two Injured & Potentially Contaminated Individuals to Local Hospital.Two Individuals Found Not to Have Sustained Serious Injury | |
IR 05000321/1998004 | 21 August 1998 | Insp Repts 50-321/98-04 & 50-366/98-04 on 980621-0801.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Includes Results of Insp by Regional Engineering & Safeguard | Safety Limit Minimum Critical Power Ratio High Radiation Area Temporary Modification Job Performance Measure Foreign Material Exclusion Safeguards Contingency Plan Scaffolding |
IR 05000321/1998003 | 14 July 1998 | Insp Repts 50-321/98-03 & 50-366/98-03 on 980503-0620.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support,Including Fire Hazards Analysis Requirements | High winds High Radiation Area Fire Barrier Contraband Locked High Radiation Area Containment Hardened Vent Overtravel Hardened vent Liquid penetrant Fire Watch |
IR 05000321/1998002 | 1 June 1998 | Insp Repts 50-321/98-02 & 50-366/98-02 on 980322-0502.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | Hot Short High Radiation Area Stroke time Temporary Modification Emergency Lighting Locked High Radiation Area |
ML20217N131 | 21 April 1998 | Insp Repts 50-321/98-01 & 50-366/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support | Safe Shutdown High Radiation Area Grab sample Fire Barrier Contraband Temporary Modification VT-2 Emergency Lighting Locked High Radiation Area Maintenance Rule Program Fire Protection Program Fire Watch Power change |
ML20217N110 | 21 April 1998 | Notice of Violation from Insp on 980208-0321.Violation Noted:Maint Personnel Did Not Follow Procedures & Conducted Work That Was Not Specified on Maint Work Order Which Was Outside Approved Personnel Protection Clearance Boundary | High Radiation Area Grab sample VT-2 |
ML20216E793 | 10 March 1998 | Notice of Violation from Insp on 971228-980207.Violation Noted:As of 980207,measures Not Correctly Implemented in That Proposed Vendor Manual Change for Sys Not Submitted to Reflect Lower Set Point Requirement for PCV 2T48-F466 | |
ML20216E798 | 10 March 1998 | Insp Repts 50-321/97-12 & 50-366/97-12 on 971228-980207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | Hot Short Reactor Vessel Water Level Grab sample Offsite Dose Calculation Manual Contraband Exemption Request |
ML20199F506 | 23 January 1998 | Notice of Violation from Insp on 971116-1227.Violation Noted:On 971118,4 H Reporting Requirement Was Not Met. Several Workers Involved in Unit 2 Outage Activities Signed Into RCA on Improper RWPs Between 970317-0411 | |
ML20199F541 | 23 January 1998 | Insp Repts 50-321/97-11 & 50-366/97-11 on 971116-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support | Fitness for Duty Offsite Dose Calculation Manual Fire Barrier Locked High Radiation Area Missed surveillance Pressure Boundary Leakage Backfit |
ML20197F357 | 15 December 1997 | Notice of Violation from Insp on 971005-1115.Violation Noted:Licensee Failed to Label Properly Eight Spent Vacuum Filters Having Max Contact Dose Rates Ranging from 4.7 to 7.5 Rem Per Hour Which Were Suspended from Unit 1 Catwalk | |
ML20197F393 | 15 December 1997 | Insp Repts 50-321/97-10 & 50-366/97-10 on 971005-1115. Violations & Deviations Noted.Major Areas Inspected:Maint, Engineering,Plant Support & Operations Re Health Physics Concern | Packing leak Fire Barrier Contraband Hydrostatic Nondestructive Examination Locked High Radiation Area Foreign Material Exclusion Liquid penetrant Fire Protection Program Fire Watch Hourly Fire Watch Scaffolding Power Uprate |
ML20197F371 | 15 December 1997 | Notice of Deviation from Insp on 971005-1115.Deviation Noted:Unit 2 Was Restarted on 940428 Following Spring Refueling Outage Repairs/Replacement Work Performed Under Design Change Request 96-006 | |
ML20199G938 | 1 December 1997 | Notice of Violation from Insp on 970406-0517.Violation Noted:On 970320,L Tillman Engaged in Deliberate Misconduct Causing Licensee to Be in Violation of TS 5.4,by Failing to Rept That Work Was Mistakenly Performed on Valve 2E51-F102 | Safe Shutdown Fire Barrier Stroke time Commercial Grade Dedication Contraband Probabilistic Risk Assessment VT-2 Missed surveillance Systematic Assessment of Licensee Performance Liquid penetrant Fire Protection Program Fire Watch Hourly Fire Watch Backfit |
PNO-II-97-060, on 971120,plant Operators Manually Scrammed Reactor from 70% Power Due to Damage to Condensate Sys. Flexible Bellows on 2A Condensate Booster Pump Was Overpressurized.Licensee Initiate Controlled Shutdown | 21 November 1997 | PNO-II-97-060:on 971120,plant Operators Manually Scrammed Reactor from 70% Power Due to Damage to Condensate Sys. Flexible Bellows on 2A Condensate Booster Pump Was Overpressurized.Licensee Initiate Controlled Shutdown | |
ML20199B812 | 3 November 1997 | Notice of Violation from Insp on 970817-1004.Violation Noted:Written Procedures Were Not Implemented on 970815 & Maintenance Work Was Completed Using Maintenance Work Order W/Inadequate Instructions | |
ML20199B822 | 3 November 1997 | Insp Repts 50-321/97-09 & 50-366/97-09 on 970817-1004. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support | Half scram Contraband Temporary Modification Locked High Radiation Area Foreign Material Exclusion Coast down |
IR 05000321/1997008 | 3 October 1997 | Insp Repts 50-321/97-08 & 50-366/97-08 on 970818-22.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant | Fuel cladding |
IR 05000321/1997007 | 11 September 1997 | Insp Repts 50-321/97-07 & 50-366/97-07 on 970629-0816.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support | High Radiation Area Half scram Temporary Modification Locked High Radiation Area Fuel cladding Pressure Boundary Leakage |
ML20196J743 | 25 July 1997 | Insp Repts 50-321/97-05 & 50-366/97-05 on 970518-0628. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support | Hot Short Reactor Vessel Water Level Offsite Dose Calculation Manual Contraband Emergency Lighting Annual Radioactive Effluent Release Report Maintenance Rule Program Fire Protection Program Fire Watch |
ML20196J705 | 25 July 1997 | Notice of Violation from Insp on 970518-0628.Violation Noted:On 970609,steps 8.4.5 & 8.5.2 of Administration Control Procedure 30AC-OPS-001-OS,rev 15 Were Not Correctly Implemented | Fire Protection Program |
ML20149H665 | 17 July 1997 | Insp Repts 50-321/97-06 & 50-366/97-06 on 970609-13. Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Including Problem Resolution,Operating Experience Feedback Programs & self-assessment Activities | |
ML20149H658 | 17 July 1997 | Notice of Violation from Insp on 970609-13.Violation Noted: Improperly Stored Matl,Which Had Potential to Impact Performance of Safety Related Equipment in Control Room, Was Identified | |
ML20141F884 | 17 June 1997 | Insp Repts 50-321/97-03 & 50-366/97-03 on 970406-0517. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | Safe Shutdown Fire Barrier Stroke time Commercial Grade Dedication Contraband Probabilistic Risk Assessment VT-2 Locked High Radiation Area Missed surveillance Systematic Assessment of Licensee Performance Fire Protection Program Fire Watch Hourly Fire Watch Backfit |
ML20141F864 | 17 June 1997 | Notice of Violation from Insp on 970406-0517.Violation Noted:Listed Examples of Inadequate Testing Procedures Were Identified | |
ML20140C230 | 30 May 1997 | Notice of Violation from Insp on 970428-0502.Violation Noted:Policies & Procedures Were Not Adequately Implemented in Employee Assistance Program Info & Released W/O Written Permission from Employee | Fitness for Duty |
ML20140C244 | 30 May 1997 | Insp Repts 50-321/97-04 & 50-366/97-04 on 970428-0502. Violations Noted.Major Areas Inspected:Fitness for Duty, Access Authorization & Physical Security Program for Power Reactors | Fitness for Duty |
ML20148B819 | 5 May 1997 | Notice of Violation from Insp on 970223-0405.Violation Noted:Sections 8.12,8.13,4.2.2,4.7.7 & 8.8.3 of Procedure 30AC-OPS-001-OS Were Not Correctly Implemented | Fire Barrier |
IR 05000321/1997002 | 5 May 1997 | Insp Repts 50-321/97-02 & 50-366/97-02 on 970223-0405. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support | High Radiation Area Half scram Fire Barrier Past operability Nondestructive Examination Locked High Radiation Area Foreign Material Exclusion Maintenance Rule Program Liquid penetrant Continuous fire watch Fire Watch Scaffolding |
IR 05000321/1997300 | 4 April 1997 | NRC Operator Licensing Exam Repts 50-321/97-300 & 50-366/97-300 on 970314-20.Exam Results:All Candidates Passed Exam | Safe Shutdown Half scram Squib Job Performance Measure Overtravel |
IR 05000321/1997099 | 4 April 1997 | SALP Repts 50-321/97-99 & 50-366/97-99 for 950528-970222 | Temporary Modification Foreign Material Exclusion Systematic Assessment of Licensee Performance Fire Protection Program Fire Watch |
ML20137F630 | 24 March 1997 | Notice of Violation from Insp on 970119-0222.Violation Noted:Design Control Requirements Not Translated Into Specifications | Safe Shutdown Fire Barrier Fire Protection Program Hourly Fire Watch |
ML20137F645 | 24 March 1997 | Insp Repts 50-321/97-01 & 50-366/97-01 on 970119-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | Safe Shutdown Fire Barrier Contraband Temporary Modification Emergency Lighting Locked High Radiation Area Exemption Request Pressure Boundary Leakage Pressure boundary leak Fire Protection Program Fire Watch Hourly Fire Watch Power change |
PNO-II-97-017, on 970312,licensee Reported Employee Collapses Onsite.First Aid Administered Until Ambulance Arrived. Employee Transported to Appling County General Hosp in Baxley,Ga & Pronounced Dead.Autopsy Will Be Performed | 13 March 1997 | PNO-II-97-017:on 970312,licensee Reported Employee Collapses Onsite.First Aid Administered Until Ambulance Arrived. Employee Transported to Appling County General Hosp in Baxley,Ga & Pronounced Dead.Autopsy Will Be Performed | |
ML20134L077 | 13 February 1997 | Notice of Violation from Insp on 961208-970118.Violation Noted:Written Procedures Were Not Implemented & Listed Examples of Failure to Implement Procedures for Radiation Control Activities Were Identified | Stroke time |
PNO-II-97-006A, on 970129,plant Shutdown Due to Primary Pressure Boundary Leakage Update.Licensee Continuing to Cold Shutdown Conditions to Perform Addl Corrective Maint Activities.Resident Inspectors Monitoring Repair Actions | 30 January 1997 | PNO-II-97-006A:on 970129,plant Shutdown Due to Primary Pressure Boundary Leakage Update.Licensee Continuing to Cold Shutdown Conditions to Perform Addl Corrective Maint Activities.Resident Inspectors Monitoring Repair Actions | Pressure Boundary Leakage |
PNO-II-97-006, on 970129,Unit 1 Declared Notice of Unusual Event for Reactor Coolant Pressure Boundary Leakage,As Defined in TS 3.4.4.Resident Inspectors on Site Monitoring Licensee Actions.State of Ga Notified | 29 January 1997 | PNO-II-97-006:on 970129,Unit 1 Declared Notice of Unusual Event for Reactor Coolant Pressure Boundary Leakage,As Defined in TS 3.4.4.Resident Inspectors on Site Monitoring Licensee Actions.State of Ga Notified | Pressure Boundary Leakage |