IR 05000321/1993025
| ML20058C838 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 11/10/1993 |
| From: | Mcguire D, Tillman A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20058C767 | List: |
| References | |
| 50-321-93-25, 50-366-93-25, NUDOCS 9312020591 | |
| Download: ML20058C838 (1) | |
Text
.
UNITED STATES
[g arog4e NUCLEAR REGULATORY COMMISSION
. jo 3
' p *e REGloN 11
.
S 101 MARtETTA STREET, N.W., SUITE 2930-p ATLANTA, GEORGIA 30323-0199
,,,
\\...../
Report Nos.
50-321/93-25 and 50-366/93-25
'
'
Licensee: Georgia Power Company P. O. Box 1295 Birmingham, AL 35201 Docket Nos.
50-321 and 50-366 License Nos. DPR-57 and NPF-5 Facility Name: Hatch I and 2 Inspection Co cte : October 18-21
'
Inspector-
/6 h'Y
/dCr(.J
//hofD c
'
A. (1TTmahNh,Teguards Inspector Date Signed Approved by: b,
// // O.
D. McGuire,' Chief Dhte Signed Safeguards Section
.
Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope:
This routine, announced inspection was conducted in the areas of Physical
'
Security Program for Power Reactors, specifically:
Physical Barriers -
Protected and Vital Areas; Access Control - Personnel, Packages and Vehicles; Assessment; Compensatory Measures; Alarm Stations, Communications and Material Control and Accountability.
Results:
In the areas inspected, violations or deviations were not identified.
l Inspection results confirmed that the security force continues to perform i
professionally and is capable of providing an acceptable level of protection
'
for vital resources and safety related equipment. Security force management and personnel performance were particularity notable.
The upgraded security system functioned well and improvement in the accountability of special nuclear material was noted.
i a,.*
l312O2059; 9333,g D
ADOCK 05000322 wume trasmeno nenaw
~
CEON-O PDR SAFEGUARDS INFORVIATION
.~n
--
+
- - - -
-.
.