ML20197F371

From kanterella
Jump to navigation Jump to search
Notice of Deviation from Insp on 971005-1115.Deviation Noted:Unit 2 Was Restarted on 940428 Following Spring Refueling Outage Repairs/Replacement Work Performed Under Design Change Request 96-006
ML20197F371
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/15/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20197F340 List:
References
50-366-97-10, NUDOCS 9712300202
Download: ML20197F371 (2)


See also: IR 07100005/2011015

Text

_ _ _ _ _ _ _ _ _ ______ _ -______ _ _ __ __ __ - _ _ _ - _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

~.

4

l

NDTICE Of DEVIATIDN  !

Southern Nuclear Operating Company. Inc. Docket No. 50 366

Hatch Unit 2 License No. NPF-5

During the NRC inspection conducted on October 5.1997 through November 15.

1997, a deviation was identified from commitments you made as part of

knendment 132 to the Unit 2 Technical Specification. In accordance with the

" General Statement of Policy and Procedure for the NRC Enforcement Actions."

NUREG - 1600. the deviation is listed below:

In the application for Technical Specification Amendment 132 for Unit 2

dated October 1. 1993, revised January 6. 1994, and supplemented February

3. 1994, a commitment was made to treat an alternate leakage path from t

the main steam isolation valves to the main condenser through a main

steam isolation valve drain line and valve 2B21F021 as American Society

of Mechanical Engineers (ASME)Section XI Class 2 for repairs / replacement

under section XI. The commitment was to be implemented prior to resi. art

from the Spring 1994 Unit 2 refueling outage.

Contrary to the above. Unit 2 was restarted on April 28. 1994. following

the Spring refueling outage with re) airs / replacement work perforrred under

Design Change Request 96 606, for tle replacement of valve 2B21F021 and

approximately four inches of piping in an alternate leakage path from the

main steam isolation valves to the main condenser, which were not +reated

as ASME Section XI Class 2.

Please provide to the U.S. Nuclear Regulatory Commission. ATTN: Document

Control Desk. Washington. DC 20555, with a copy to the Regional Administrator.

Region II, and a copy to the NRC Resident inspector at the Hatch facility, in

writing within 30 days of the date of this Notice. (1) the reason for the

deviation, or, if contested. the basis for disputing the deviation. (2) the

corrective steps that have been taken and the results achieved. (3) the

corrective steps that will be taken to avoid further deviations, and (4) the

date when your corrective actions will be completed. Where good cause is

shown, consideration will be given to extending the response time.

Dated at Atlanta. Georgia.

this 15th day of December 1997

9712300202 971215

PDR ADocK 05000321

G pop

Enclosure 2

L

4

.

. ,

2 Notice of Violation 2-  !

!

that have been taken and the results achieved. (3) the corrective steps that I

will be taken to avoid further violations, ard (4) the Jate when full  !

com)liance will be achieved. Your response may reference or include previous t

docr.eted correspondence, if the corres ondence adequately addresses the

required response, i f an adequate rep y is not received within the tine - ,

specified .in this Notice, an order or egand for Information may be issued as ,

to why the license should not be modified, sus > ended, or revoked, or why such I

'

other action as may be proper should not be tacen. Where good cause is shown.

-

consideration will be given to extending the response time,  ;

,

t

-

Because your res)onse will be placed in the NRC Public Document Room (PDR), to ,

l the extent possi)le, it should not include any personal privacy, 3roprietary, .

or safeguards information so that it can be placed in the PDR witlout  :

redaction. However, if you find it necessary to include sucn information, you t
- should clearly indicate the specific information that you desire not to be

placed in the PDR, and provide the legal basis to support your request fo, t

i withholding the information from the public. 1

!

,

.

Dated at Atlanta, Georgia 1

+

t

this 15th day of December 1937

2

,

i

!

P

e

i.

f

?

i

7

l'

Enclosure 1

+

L

. :

-

_-

r__--_= __; + -- _ _-

r

..+....-.,..,,-e,er4--,.,-,,,%-_., eye 4 .-,,.i..u-,-,yp p...,-g.-m.p.,p.-, ,p% . -vy,,,,#,., , g, ,,,e,,,m9.,y.,