Insp Rept 50-425/88-05 on 880111-14.No Violations or Deviations Noted.Major Areas Inspected:Electrical Components & Sys Work Observation & Record & Electrical Cable Work & Observation Record.Unresolved Item Identified
ML20149G904
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/04/1988
From: Conlon T, Fillion P, Hunt M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20149G903 List:
References
50-425-88-05, 50-425-88-5, NUDOCS 8802190008
Download: ML20149G904 (8)


Text

4

-

UNITEo STATES

  • /p27800g'. .. NUCLEAR REGULATORY COMMIS$10N  !

O ' REGION 11  ;

h* 101 MARIETTA STREET. '

"# ATLANTA. GEORGI A 30323

~

s .... /

+

t

-

,

L

Report No.: 50-425/88-05 Licensee: Georgia Power Company P. O. Box 4545 Atlanta, GA 30302 Docket No.: 50-425 License No.: CPPR-109

'

Facility Name: Vogtle 2

,

Inspection Conducted: , January 11-14, 1988 inspectors: Y M. D. Hunt '

fAnth - hU

'

c0 ~/$ '0}

Date Signed

>

C h P. J. Fillion it;// py '/f'L

'

$~'l~TT '

Accompanying Personnel: M. N. Miller .

'

Approved by:C2 '#7"/ /L'  ; # '/ - P3'

T. E., Conlon, Section Chief Date Signed ;

Engineering Branch Division of Reactor Safety

,

SUMMARY  ;

Scope: This routine, unannounced inspection was in the areas of Electrical Components and Systems Work Observation and record; Electrical Cable work l observation and records; and Instrument Components and Systems Work Observation. One unresolved item was identifie ;

!

Results: No violations or deviations were identifie i i

i l

l

'gg21 Q$$k s f l V '

. .

,

,

L

'

,

a

, REPORT DETAILS -

, Persons Contacted Licensee Employees

  • J. Adams, Lead Instrumentation Engineer, Mechanical Discipline Supervisor i W. Baimbridge, Cable Installation Engineering Supervisor 1 0. Borowski, Quality Control Supervisor i E. Duke, Assistance Discipline Manager-Electrical  !
  • D. M. Fiquett, Manager Field Construction Unit 2

'

  • J. J. Gilmartion, Mechanical Discipline Staff Engineering Supervisor . !
  • L. B. Glenn, Manager Quality Control ,

, *E. D. Groover, Quality Assurance Site Manager-Construction -

  • A. W. Harreslon, Manager Electrical Discipline
  • C. W. Hayes, Quality Assurance Manager, Site  !
  • R. E. Hollands, Electrical Construction Supervisor i M. P111are111, Field Engineer Electrical Discipline  ;
  • C, W. Rau, Manager Mechanical Discipline i

<

  • P. O. Rice, Vice President and Project Director t

<

'

Other licensee employees contacted included construction craftsmen,

,

i engineers, technicians, office personne ,

Other Organizations

, *B. Edward, Resident Construction Manager, Pullman Power Products !

-

  • J. E. Miller, Manager Quality Assurance, Pullman Power Products '
  • J. Hill, Training Instructor, Cleveland Electric '

f NRC Resident Inspectors t

  • R. J. Schepens, Senior Resident Inspector

l * Attended exit interview f Exit Interview i

, The inspection scope and findings were summarized on January 14, 1988, i

<

with those persons indicated in Paragraph 1 above. The inspectors described the areas inspected and discussed in detail the inspection !

finding No dissenting comments were received from the licensee. The !

following new item was identified during this inspection:

'

, URI- 50-425/88-05-01, By pass of QC hold point during High Potential j Test, i

i  !

'

!

'

4 l r

.. . - . -. . ..

. i

.

,

2 ,

a-f 3. Licensee Action on Previous Enforcement Matters .

This subject was not addressed in the inspectio l 4. Unresolved Items  :

I Unresolved items are matters about which more information is required to I determine whether they are acceptable or may involve violations or !

deviations. One unresolved item identified during this inspection -is ,

i discussed in Paragraph t

.,

5. Electrical Components and Systems, ' Work Observation (51053) and Record ;

Review (51055)  ;

The inspectors selected various installed electrical components for f examination of the completed work, . work in progress and the QC records I associated with receiving inspection activities, storage, handling and .

installation of the selected components. The components inspected were '

energized and had been~ released to the testing group for functional !

testin The records for each component are contained in "Turn Over -

Packages". These packages consist of receipt inspection records and !

associated certifications, installation records, and acceptance testin .

where applicable. All components examined were identified by name plates

'

permanently affixed, and were covered to provide protection from surrounding construction activitie The equipment selected for i examination is identified belo '

ID N Name i

2-2403-PS-DG1 D/G Generator "A" Control Panel i 2-2403-PS-DG3 D/G Generator "B" Control Panel 2-1806-B3-BYA Train "A" Battery f 2-1806-B3-CBA Train "B" Battery Charger i 2-1806-03-DA1 Train "A" 125 VDC Distribution Panel !

2-1806-Q3-0B2 Train "B" 125 VDC Distribution Panel l 2-1804-53-A02 Train "A" 4160 V Switchgear 2-1805-53-805 Train "A" 480 V Switchgear !

2-1805-53-ABA Train "A" 480 V Motor Control Center l 2-1805-53-BBB Train "B" 480 V Motor Control Center l 2-1805-53-BB0 Train "B" 480 V Motor Control Center l 2-1816-U3-005 Isolation Device Panel Train A j 2-1821-U3-001 Safety Feature Sequence Panel "A" 2-1821-U3-002 Safety Feature Sequence Panel "B" 1

)

l i . _ . _ _ _ - ,

,

.

.  :

!

,

.  !

'

.

!

i The receipt, storage and installation of this equipment was performed and documented in accordance with the applicable specifications and procedures (

listed below:

l i

Construction Specifications

[

X3AR01-E2 Station Service Equipment

,

.

l X3AR01-E12 -Installation Procedures for Electrical Equipment '

j GPC Field Procedures I

>

CM-T-03 Inspection of Items in Storage  ;

i Ch T-04 Maintenance of Items in Storage l

'

i ED-T-04 Installation of Major Electrical Equipment l

GD-T-11 Rigging, Hoisting, and Transporting of l Permanent Plant Equipment  !

j GO-T-25 Change to Supplier Equipment at Jobsite GO-T-28 Component Removal

]

l Within the areas examined, no violations or deviation were identifie ! Electrical Cables-Work Observation (51063) and Record Review (51065)

i j The inspectus selected installed electrical power, control and !

1 instrumentation cables for examination. The routing of various cables was l

!' reviewed and verified to the cable tray routing listed on the "pull card". '

l In certain instances the routing was only verified to the point where the

<

cable exited conduit and entered a cable tray containing many similar

{ cables.

)

I In addition, the cable bend radius was examir:ed in various areas, cable j identification was verified, termination materials examined, and i segregation of power, control and instrumentation cables were verified, i The method of record preparation to insure traceability back to the

! manufacturers documentation was examined during this inspectio The

,

activities for the cable installation, termination and documentation are i

controlled by the requirements of procedure EO-T-07. Cable Installation j

and ED-T-08. Cable Termination.

a i

$ -

r

!

- . . _ - . , _ _ . - _ _ . _ _ ,_ , _ . ._ _ . ~ . _ _ _ . _ . _ .,_- _

.- _ - _

. . . -

,4 .

.

..

>

i

. The following cables were examined and compliance to various procedures l requirements verified.

2 i

, 2SA0396EA 2ABD09LA  !

2BA0313EA 2BBD09LA  !

'

!

2AA0213EA 2BBD29LC l a

t

'

2BB1609HA 2BBD29LB'

j 2BB1609HB '2BBD29LA (

',

The licensee's program for conducting huh ,aot; ilal [overvoitige] tests f on cables in the 4160 V safety-related distribution system was reviewed by ;

the NRC inspectors. The high potential test consist of applying a DC i overvoltage to each conductor in the cables for a specified tim i i In Section 17.1 of the FSAR the licensee stated that the QA program, for I i construction is designed to conform to Regulatory Guide (RG) 1.30 "Quality 1 Assurance Requirements for the Installation Inspection, and Testing of l Instrumentation and Electric Equipment." RG 1.30 which endorses ANSI . :

N45.2.4-1972 (same title as RG 1.30 also designated IEEE Std. 336-1971), ,

.

'

calls for the conducting of overpotential test, RG 1.30 does not !

specifically call for inspectors to witness the overpotential tes !

Therefore, the licensee must decide whether or not those persons ;

i conducting the overpotential test have sufficient independence from those i

! responsible for installing the cables to conform to the requirements of [

.

GpCs Quality Asse ance Program in order to determine whether or not inspectors are required to monitor the test.

]

I Details for carrying out the high potential test are specified in several !

l industry standards. However, the licensee did not commit to using any !

} particular standar Procedure 25733-C "High Potential Testing Cable" Rev. 4 specifies, for the 4160 Volt system cables, that 36KV DC be applied -

to each conductor for five consecutive minutes. The procedure also states l

<

that, if the leakage current increases with time, extend the test period :

to 15 minutes. The tests were conducted after the cables were installed !

I and before they were energize !

+

The scope of the inspection was to review the applicable procedures and to i j review three data sheets for tests completed on cables selected at random,- I

!

!

Plant Vogtle Field Procedure. ED-T-07 "Cable 1 Insta11stion", Rev.12, t covers the performance of high potential test on cables. Had the test i been carried out by the Electrical Field Office, which is ?esponsible for !

,

construction ED-T-07 would have been used. However, the conducting of i J

the high potential test was delegated to the Start-up group (Site l l

'

!

! i

. t

_ .- _

1 - ..-

..

t 5 .

-

4 ,

Operations). The Start-up group used their own procedure, 25733-C, High

,

potential Testing Cable" to carry out the test. Procedure E0-T-07 calls,

for the Electrical Quality Control (QC) Inspection Supervisor to be notified prior to start of testing for Class IE cables. The procedure

, specifies the notification as a "Q.C. HOLD POINT". Procedure 25733-C

,

!

specifies, if work is safety-related, notify Q.C. prior to start of wor ,

Review of test sheets for safety-related cables 2BA0313EA, 2BA0306E and .

2AA0213EA indicated that the test was completed using the specified  !

voltage, time duration and acceptance criteria of 100 micro-Amperes ,

leakage current. However, review of the data sheets for the three selected cables revealed that Quality Control did not sign-off the hold points as required by the procedure. In addition, the persons completing the data sheets checked-off non-safety-related when in f act the cables  :

were safety-related [two cables, one had no check].

l The licensee investigated this matter after the NRC inspectors brought it to the attention of GpC management. As a result of this investigation, it l was revealed that an engineer from the Nuclear Operations group noted on l November 24, 1987, that Procedure 25733-C was not being followed with i respect to the notification of The engineer informed his supervisor :

-

of the failure to follow procedure. However, apparently the matter was l not investigated, since an Operations Deficiency Report was not written at  :

that time. The NRC was further informed that QC was . involved in a test ,

i conducted on November 30, 1987, and all subsequent high potential tes '

i" As a result of this inspection finding, an Operations Deficiency Report '

has been generated after the inspection. According to licensee personnel, '

l the "QC HOLD POINT" was by passed during the testing of 37 cable '

) Since several questions raised by the NRC Inspectors required some '

research by the licensee, all the facts surrounding this matter could not

be determined during the time period of the inspection. Questions asked of ,

, the licensee include the following:  !

1 How many cables (total) require the high potential t:st? l

" How many high potential test were carried out according to all provisions of the procedure, including the notification of QC7 ,

4 .

How did it happen that in at least two cases non-safety related was i d

checked off when in fact the cable was safety-related? In how many

instances did this occur?

J Was the test carried out according to the recommendations of an industry standard?

j In summary, the licensee chose to make notification of QC prior to l conducting each high potential test a "QC HOLD POINT." One may conclude

'

this was important to his Quality Assurance program. Since the hold point ,

was by-passed in 37 cases, NR0 requirements in the area of procedures apparently were violated. However, all circumstances surrounding this

,

'

,

e i

__ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ .

_ _ _ _ _ _ . - _ _ _ _ _ _ _

.

'

.

t

'

'

.

,

I matter were not known at the time this report was issued. Therefore, the potential violation could not be characterized. Pending the acquisition of information described in this section, this matter. is identified as Unresolved Item 425/88-05-01, By pass of QC Hold Point during

, High-Potential Tes The following Control cable terminations were examined for compliance to [

drawing 2X3D-CG F04A. Additionally proper lug size, cable tags and wire _  !

i markers were verified for these cables.- '

4 2BYF1075A 2BA03195P t

'

i 2BCBHG03BSB 2BCBAM10CSD

'

j 2BCBAM10CSC 2BA03195B  !

!;

"  !

2BCBHG03BSC 2BCBHG03135Z  !

i  !

,

2BA03195K 22ZV184SA

l

'

2BD1106LA

, i The inspectors examined the completed work of six safety-related instrument cable terminations. The terminations are cable splices requiring a termination splice kit. The cable pull card, the termination card, the termination inspection record, and the connection drawings for  :

.

each cable was reviewe The inspectors verified for each cable  ;

i termination the followin ,

At each termination the cables were properly identified as required  !

i by procedure E0-T-08. Cable Terminatio i Each cable splice box was correctly identified by number and channel

'

identification color as specified on the Termination.

,

l

Each termination is properly located using the required termination splice ki *

'

i

) Each termination was inspected and documented by QC, I ,

! The following instrument cable terminations were inspecte ;

i l

j Instrument Cable Termination Box Channel Color j PT-455 l 21 CQ PSIAXT 2 ARJ B00 51 Brown .

! PT-456 22 CQ PS2AXT 2 BRJ B00 52 Green  !

! PT-457 23 CQ PS3AXT 2 CRJ B00 53 Blue i PT-458 24 CQ PS4AXT 2 DRJ B00 54 Yellow i LT-460 22 CQ PS2AXW 2 BRJ B00 57 Green i LT-461 23 CQ PS3ZL 2 CRJ B00 58 Blue

Within the areas examined, no violations or deviation were identifie i

.

,

,. ,

.

.

'

l* I 7. Instrument-ComponentsAndSystems-WorkObservation(52053)  ;

The inspectors performed walkdowns in the containment building to observe work in progress and completed work. The work in progress examined was the seismic tubing installation for main steam Loop 2 flow transmitters FT-522 and FT-523. The craft performing the work were using the latest approved drawings, documentation and Pullman Power - Products (PPP) -

t Procedure IX-40, "Instrumentation, Installation, Inspection and Testing".

l The instrument foreman and the QC inspectors monitoring the work were  !

! interviewed and both were knowledgeable of the required documentation and construction Procedure PPP IX-4 ,

! The inspectors observed various portions of partially completed and ,

completed work for instruments associated with the pressurizer, the ,

,

reactor coolant loops and steam generator The work was examined to determined if  :

l The location, configuration and installation is in accordance to the latest approved design and construction specification and drawing The specified instruments and items have been use ;

. ;

The components, have been correctly and permanently identified and  ;

the channel identification color codes are as specifie l f

Cleanliness requirements have been maintained, j

Status of completion and readiness for pre-operational testing is l indicated (Released for Test-tagged) and records maintaine !

,

As-built drawings have been or are in the process of being completed, l

The following instrument Transmitters examined were:

l Level Flow Pressure LT-459 FT-424 PT-455 LT-460 FT-425 PT-456 LT-461 FT-426 PT-457 LT-527 FT-444 PT-458 LT-528 FT-445 LT-529 FT-446 LT-552 Within the areas examined, no violation deviations were identifie _ _ . -_ .. ..-. - .---, . - - - . . - , - _ _ _ .-