Category:INSPECTION REPORT
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items IR 05000424/19930031993-03-17017 March 1993 Insp Repts 50-424/93-03 & 50-425/93-03.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Refueling Activities IR 05000424/19920311993-01-26026 January 1993 Insp Repts 50-424/92-31 & 50-425/92-31 on 921129-930102. Noncited Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint,Review of SNM Accountability Program & Review of LERs & Followup IR 05000424/19920281993-01-0505 January 1993 Insp Repts 50-424/92-28 & 50-425/92-28 on 921130-1204. Violations Noted.Major Areas Inspected:Rp Program Activities Associated W/Llrw Processing,Temporary Storage & Transportation,Liquid & Gaseous Effluent Monitor 1999-08-16
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items IR 05000424/19930031993-03-17017 March 1993 Insp Repts 50-424/93-03 & 50-425/93-03.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Refueling Activities IR 05000424/19920311993-01-26026 January 1993 Insp Repts 50-424/92-31 & 50-425/92-31 on 921129-930102. Noncited Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint,Review of SNM Accountability Program & Review of LERs & Followup IR 05000424/19920281993-01-0505 January 1993 Insp Repts 50-424/92-28 & 50-425/92-28 on 921130-1204. Violations Noted.Major Areas Inspected:Rp Program Activities Associated W/Llrw Processing,Temporary Storage & Transportation,Liquid & Gaseous Effluent Monitor 1999-08-16
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items IR 05000424/19930031993-03-17017 March 1993 Insp Repts 50-424/93-03 & 50-425/93-03.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Refueling Activities IR 05000424/19920311993-01-26026 January 1993 Insp Repts 50-424/92-31 & 50-425/92-31 on 921129-930102. Noncited Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint,Review of SNM Accountability Program & Review of LERs & Followup IR 05000424/19920281993-01-0505 January 1993 Insp Repts 50-424/92-28 & 50-425/92-28 on 921130-1204. Violations Noted.Major Areas Inspected:Rp Program Activities Associated W/Llrw Processing,Temporary Storage & Transportation,Liquid & Gaseous Effluent Monitor 1999-08-16
[Table view] Category:UTILITY
MONTHYEARML20058E8901990-10-25025 October 1990 Insp Repts 50-424/90-27 & 50-425/90-27 on 901016-17. Violations Confirmed.Major Areas Inspected:Physical Protection of Safeguards Info in Response to licensee- Identified & Reported Safeguards Event IR 05000424/19900201990-10-25025 October 1990 Insp Repts 50-424/90-20 & 50-425/90-20 on 900825-0928. Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Refueling Operations,Review of LERs & Followup on Previous Insp Findings IR 05000424/19900261990-10-17017 October 1990 Insp Repts 50-424/90-26 & 50-425/90-26 on 901009-12. Noncited Violation Noted.Major Areas Inspected:Inservice Insp (ISI) & ISI Implementing Procedures IR 05000424/19900171990-09-18018 September 1990 Insp Repts 50-424/90-17 & 50-425/90-17 on 900630-0824.No Specific Strengths or Weaknesses Identified.Major Areas Inspected:Plant Operations,Radiological Controls,Maint, Surveillance,Security & Quality Programs IR 05000424/19900151990-08-29029 August 1990 Insp Repts 50-424/90-15 & 50-425/90-15 on 900727-0803. Violations Noted.Major Areas Inspected:Observation & Evaluation of Annual Emergency Response Exercise IR 05000424/19900161990-07-26026 July 1990 Insp Repts 50-424/90-16 & 50-425/90-16 on 900709-13.No Violations Noted.Major Areas Inspected:Radiolgical Emergency Response Plan & Implementing Procedures,Emergency Facilities,Equipment,Instrumentation & Supplies IR 05000424/19900131990-07-18018 July 1990 Insp Repts 50-424/90-13 & 50-425/90-13 on 900519-0629. Violations Noted But Not Cited.Major Areas Inspected:Plant Operations,Radiological Controls,Maint,Surveillance,Quality Programs,Security & Administrative Controls IR 05000424/19900141990-07-0202 July 1990 Insp Repts 50-424/90-14 & 50-425/90-14 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected: Radiological Effluents,Environ Monitoring,Plant Chemistry & post-accident Sampling Sys ML20058G4491990-06-13013 June 1990 Insp Repts 50-424/90-10 & 50-425/90-10 on 900331-0518. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security,Quality Programs & Administrative Controls Affecting Quality IR 05000424/19890231989-09-12012 September 1989 Partially Withheld Insp Repts 50-424/89-23 & 50-425/89-27 on 890731-0803 (Ref 10CFR2.790(d) & 73.21).Violation Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Procedures,Protected & Vital Area Barriers & Testing IR 05000424/19890211989-08-0404 August 1989 Insp Repts 50-424/89-21 & 50-425/89-25 on 890725-27.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Exercise,Including Selected Portions of Staffing & Response of Emergency Organization Personnel in Simulator ML20248C8591989-07-31031 July 1989 Insp Repts 50-424/89-19 & 50-425/89-23 on 890609-0707.Four Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security & Quality Programs & Administrative Controls Affecting Quality IR 05000424/19890201989-07-21021 July 1989 Insp Repts 50-424/89-20 & 50-425/89-24 on 890626-30. Violation Noted.Major Areas Inspected:Design,Design Changes & Plant Mod IR 05000424/19890181989-07-12012 July 1989 Insp Repts 50-424/89-18 & 50-425/89-21 on 890612-16.No Cited Violations Noted.Major Areas Inspected:Emergency Preparedness Program to Determine If Program Maintained in State of Operational Readiness IR 05000424/19890151989-06-30030 June 1989 Insp Repts 50-424/89-15 & 50-425/89-17 on 890522-26.No Violations Noted.Major Areas Inspected:Occupational Exposure,Shipping & Transportation & Radiation Protection Startup.Weakness Noted in Quality of Audit Program IR 05000425/19890221989-06-25025 June 1989 Insp Rept 50-425/89-22 on 890612-16.No Violations Noted. Major Areas Inspected:Review of Completed Startup Tests & Closeout of Startup Test Insp Program IR 05000424/19890161989-06-21021 June 1989 Insp Repts 50-424/89-16 & 50-425/89-18 on 890506-0608. Violations Noted.Major Areas Inspected:Plant Operations, Startup (Unit 2),radiological Controls,Maint,Surveillance, Security & Quality Programs & Administrative Controls ML20245F4231989-06-15015 June 1989 Insp Repts 50-424/89-14 & 50-425/89-15 on 890318-0505. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls/Chemistry,Maint,Surveillance & Security & Administrative Controls Affecting Quality ML20245D8671989-06-14014 June 1989 Insp Rept 50-425/89-20 on 890516-20.No Violations or Deviations Noted.Major Areas Inspected:Response to Loss of Transient on 890514,review of Completed Startup Tests & Witnessing of 100% Loss of Load Test ML20245H8361989-06-0909 June 1989 Partially Withheld Insp Repts 50-424/89-17 & 50-425/89-19 on 890515-19 (Ref 10CFR2.790(d) & 73.21).Violations Noted Re Access Controls.Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Vital Area Access Controls IR 05000425/19890161989-05-0404 May 1989 Insp Rept 50-425/89-16 on 890327-31 & 0410-13.No Violations or Deviations Noted.Major Areas Addressed:Review of Completed,Precritical Tests,Witnessing of Initial Criticality & of Shutdown from Outside Control Test Room IR 05000424/19890131989-04-24024 April 1989 Insp Rept 50-424/89-13 on 880808-0912.Violations Noted.Major Areas Inspected:Review of 11 Inspector Followup Items & Program Weaknesses Identified in Operational Performance Assessment IR 05000424/19890121989-04-19019 April 1989 Insp Repts 50-424/89-12 & 50-425/89-14 on 890313-17.No Violations or Deviations Noted.Major Areas Inspected:Snubber Surveillance Program,Unit 2 Containment Structural Integrity Test Program & Piping Vibration Testing Program IR 05000424/19890101989-04-11011 April 1989 Insp Repts 50-424/89-10 & 50-425/89-12 on 890218-0317. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security & QA Programs & Administrative Controls Affecting Quality IR 05000424/19890111989-04-10010 April 1989 Insp Rept 50-424/89-11 & 50-425/89-13 on 890307-10 & 29-31. No Violations or Deviations Noted.Major Areas Inspected: Proposed Startup Tests for Unit 2 & Followup of Previous Violation on Unit 1 IR 05000424/19890081989-04-0707 April 1989 Insp Repts 50-424/89-08 & 50-425/89-11 on 890204-10.No Violations Noted.Major Areas Inspected:Nrc Bulletin Followup,Diesel Generator Fuel Oil,Containment Isolation Sys Testing & Followup Actions on Previous Insp Findings IR 05000424/19890071989-03-14014 March 1989 Insp Repts 50-424/89-07 & 50-425/89-10 on 890121-0217. Licensee Identified Violations Noted.Major Areas Inspected: Plant Operations,Radiological Controls,Maint,Surveillance, Security & Initial Fuel Load IR 05000424/19890091989-03-10010 March 1989 Partially Withheld Insp Rept 50-424/89-09 on 890202-03 (Ref 10CFR2.790(d) & 73.21).Violations Noted:Badges of Terminated Employees Not Removed from Badge Issue Area.Major Areas Inspected:Badge Access Areas IR 05000321/19880371989-03-0909 March 1989 Partially Withheld Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Operational Activities & Safeguards Matl Handling IR 05000424/19890021989-03-0202 March 1989 Insp Repts 50-424/89-02 & 50-425/89-02 on 890208-14.No Violations or Deviations Noted.Major Areas Inspected: Witnessing Initial Fuel Load of Unit 2 & Review of Proposed Startup Tests for Unit 2 IR 05000425/19890081989-02-28028 February 1989 Insp Rept 50-425/89-08 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected:Preoperational Testing,Preoperational Test Results Evaluation & Followup on NRC Bulletins 88-004 & 81-02 ML20247C0031989-02-23023 February 1989 Insp Repts 50-424/89-03 & 50-425/89-03 on 890109-13. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Licensee Identified 10CFR50.55 Items & NRC Bulletin 80-08 (Unit 2) IR 05000425/19890091989-02-21021 February 1989 Insp Rept 50-425/89-09 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected:Qa Coverage for Startup Testing & Licensee Action on Previously Identified Items IR 05000424/19890051989-02-21021 February 1989 Insp Repts 50-424/89-05 & 50-425/89-06 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected: Confirmatory Radiological Measurements for Units & Preoperational Sys Tests for Unit 2 IR 05000425/19880781989-02-16016 February 1989 Insp Rept 50-425/88-78 on 881219-22.No Violations Noted. Major Areas Inspected:Preservice Insp Program & Procedure Review,Housekeeping,Matls Identification & Control & Action on Previous Insp Findings IR 05000425/19890041989-02-15015 February 1989 Insp Rept 50-425/89-04 on 880109-12.No Violations or Deviations Noted.Major Areas Inspected:Fire Prevention & Protection & Review of Previously Identified NRC Open Items ML20235L1921989-02-10010 February 1989 Insp Repts 50-424/88-61 & 50-425/88-79 on 881217-890120. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Fire Protection, Security,Preoperation Testing & Quality Programs ML20235L6991989-02-0707 February 1989 Insp Repts 50-424/89-01 & 50-425/89-01 on 890117-19.No Violations or Deviations Noted.Major Areas Inspected:Util Response to Improvement & Incomplete Items Identified in Unit 2 Emergency Preparedness Implementation Appraisal IR 05000424/19880551989-02-0202 February 1989 Insp Repts 50-424/88-55 & 50-425/88-71 on 881212-16 & 890103-06.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Radwaste Treatment Sys & Effluent Monitoring Sampling Sys & Environ Radiological Monitoring IR 05000425/19880651988-11-30030 November 1988 Insp Rept 50-425/88-65 on 881024-28.No Violations or Deviations Noted.Major Areas Inspected:Containment Local Leak Rate Preoperational Test Program Review & Reactor Protection Sys Preoperational Test Procedure Review IR 05000424/19880441988-11-28028 November 1988 Insp Rept 50-424/88-44 on 881001-28.Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls, Maint,Surveillance,Fire Protection,Security,Outage,Quality Programs & Administrative Controls Affecting Quality ML20196E0821988-11-25025 November 1988 Insp Repts 50-424/88-46 & 50-425/88-61 on 881017-21.No Violations Noted.Major Areas Inspected:Radiological Effluents & Plant Chemistry IR 05000425/19880671988-11-23023 November 1988 Insp Rept 50-425/88-67 on 881031-1103.No Violations or Deviations Noted.Major Areas Inspected:Closeout of Readiness Review Modules 6,12,17/19 & 20 Findings IR 05000424/19880491988-11-22022 November 1988 Insp Repts 50-424/88-49 & 50-425/88-59 on 881017-20.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Licensee Actions Re Implementation of Plant Safe Shutdown Guidance Provided in SRP 9.5-1 IR 05000425/19880571988-11-17017 November 1988 Insp Rept 50-425/88-57 on 881003-07 & 11-14.No Violations or Deviations Noted.Major Areas Inspected:Preoperational & Hot Functional Test Witnessing,Preoperational Test Procedure Review & Licensee Action on Previous Insp Findings IR 05000424/19880381988-11-16016 November 1988 Insp Repts 50-424/88-38 & 50-425/88-42 on 880815-19. Violations Noted.Major Areas Inspected:Site & Corporate Emergency Preparedness Programs & Identification of Programmatic Differences &/Or Changes Specific to Unit 2 IR 05000425/19880581988-11-16016 November 1988 Partially Withheld Insp Rept 50-425/88-58 on 881024-27 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Physical Security Plan & Implementing Procedures, Security Organization,Testing & Maint & Physical Barriers IR 05000424/19880451988-11-15015 November 1988 Insp Rept 50-424/88-45 on 881017-21.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp, Including Review of Inservice Insp Program,Plan for Outage & Review of NDE Procedures IR 05000425/19880561988-11-15015 November 1988 Insp Rept 50-425/88-56 on 880913-1031.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection, Piping Sys & supports,safety-related Components,Auxiliary Sys,Electrical Equipment,Raceways & Instrumentation IR 05000425/19880491988-10-13013 October 1988 Insp Rept 50-425/88-49 on 880822-0901.Violations Noted.Major Areas inspected:1 of 11 Readiness Review Modules as Part of Pilot Readiness Review Program Per Recommendations in NUREG-1055 1990-09-18
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20207L8511999-03-0808 March 1999 Notice of Violation from Insp on 990125-27.Violation Noted: on Numerous Occasions from Mar 1997 to Oct 1998,select Response Force Officers Were Posted in Locations That Would Not Permit Them to Interpose Themselves Between Intruder IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors ML20155A7621998-10-15015 October 1998 Notice of Violation from Insp on 980816-0926.Violation Noted:On 980824,licensee Failed to Adequately Establish Sufficient Procedural Control for Demolition of Concrete Missile Barrier IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20154C5131998-09-10010 September 1998 Notice of Violation from Insp on 980628-0815.Violation Noted:Corrective Actions Taken in Response to Violations Associated with Entry Into TS LCO for Maint & Surveillances Activities Were Inadequate to Preclude Repetition IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20236T5871998-07-23023 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:On 980419,Unit 2 Entered Mode 2 W/O Meeting LCO of TS 3.3.2,which Requires Two Trains of Turbine Trip Function to Be Operable Prior to Entering Mode 2 IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19983021998-07-21021 July 1998 NRC Operator Licensing Exam Repts 50-424/98-302 & 50-425/98-302 for Tests Administered on 980721 ML20236H3971998-06-15015 June 1998 Notice of Violations from Insp on 980419-0516.Violations Noted:On 980415,upon Identification That 1 of 3 Letdown Orifice Isolation Valves Would Not Open,Unit 2 Uss Proceeded to Allow Operation of Unit in Water Solid Conditions ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-032, on 980609,electrical Fault on 2C Condensate Pump Motor Caused Loss of 1NAB 13.8KV Bus.Fault Also Caused Main Generator Trip,Turbine Trip & Reactor Trip.Reactor Coolant Pump 2 & 4 Lost Power Because of Bus Loss1998-06-10010 June 1998 PNO-II-98-032:on 980609,electrical Fault on 2C Condensate Pump Motor Caused Loss of 1NAB 13.8KV Bus.Fault Also Caused Main Generator Trip,Turbine Trip & Reactor Trip.Reactor Coolant Pump 2 & 4 Lost Power Because of Bus Loss ML20247K7531998-05-15015 May 1998 Notice of Violation from Insp on 980308-0418.Violation Noted:On 980401,Procedure PT-V-605,was Not Properly Implemented,In That,Liquid Penetrant pre-exam Cleaning for Safety Injection Sys Weld 21204-122-6 Was Inadequate IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19983011998-05-0707 May 1998 NRC Operator Licensing Exam Repts 50-424/98-301 & 50-425/98-301 on 980413-15.Exams Results:All Candidates Passed Tests Except for One SRO ML20216J6611998-04-0202 April 1998 Notice of Violation from Insp on 980125-0307.Violation Noted:On 980219,Unit 2 Shift Supervisor Authorized Maint on Control Room Emergency Filtration Sys Train B W/O Recognizing Work Would Render Train Inoperable IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-II-98-017, on 980320,female Contract Worker Found Unconscious at Bottom of man-lift Station in Turbine Bldg. Plant First Aid Team Responded & Ambulance Was Called. Injured Person Transported to Hosp & Pronounced Dead1998-03-20020 March 1998 PNO-II-98-017:on 980320,female Contract Worker Found Unconscious at Bottom of man-lift Station in Turbine Bldg. Plant First Aid Team Responded & Ambulance Was Called. Injured Person Transported to Hosp & Pronounced Dead IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M3681998-01-12012 January 1998 Notice of Deviation from Insp on 971102-1213.Deviation Noted:Since Initial Startup of Both Units 1 & 2,licensee Failed to Perform 18-month Surveillance Testing on Reactor Coolant Pump 125V Direct Current non-1E Control Breakers ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint ML20198M3401998-01-12012 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:Since Initial Startup of Both Units 1 & 2,procedures 14420-1/2 & 14421-1/2 Inadequate ML20202E1971997-11-26026 November 1997 Notice of Violation from Insp on 970921-1101.Violation Noted:On 971003,10 Unit Heater Breakers on MCC 1NBG Were Found Open & Not Tagged IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20212F3471997-10-20020 October 1997 Notice of Violation from Insp on 970803-0920.Violations noted:54 Fire Extinguishers W/Insp Sticker ,were Issued Between 970730 & 0815 & Did Not Meet Insp Criteria of Procedure 92020-C ML20211F2501997-09-15015 September 1997 SALP Repts 50-424/97-99 & 50-425/97-99 for Vogtle Electric Generating Plant for 960128-970802 ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210S0551997-08-28028 August 1997 Notice of Violation from Insp on 970706-0802.Violation Noted:On 970708,during Maint on Shaft Seal in Unit 1 Personnel Airlock,Licensee Failed to Document Entry Into Appropriate Action Condition for TS LCO 3.6.2 ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20210N6521997-08-14014 August 1997 Notice of Deviation from Insp on 970623-27.Deviation Noted: Incidents or Events Associated W/Ufsar Section 17.2.1.1.1.F & H Were Not Reviewed on 961218 & 970430 Srb Meetings ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198F8551997-08-0404 August 1997 Notice of Violation from Insp on 970601-0705.Violation Noted:Six Individuals Reported for Duty to ERFs & Failed to Complete sign-in Sheets on 970527,during Performance of Recall Emergency Drill ML20141F6971997-06-24024 June 1997 Notice of Violation from Insp on 970427-0531.Violation Noted:Time Between Performances of Procedure 29100-C,for Visual Insp of Fire Extinguishers & Fire Hose Stations, Exceeded 31 Days ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20140B3951997-05-21021 May 1997 Notice of Violation from Insp on 970316-0426.Violation Noted:Between 970329 & 0404,numerous Examples of Unattended & Unevaluated Debris Have Been Identified & Eight EPIP Revs Had Not Been Distributed ML20138J4161997-04-25025 April 1997 Notice of Violation from Insp on 970210-0307.Violation Noted:Licensee Offered for Transportation by exclusive-use, Closed Transport Vehicle,Package Which Arrived Having Max Surface Radiation Levels Exceeding 10 Msv/Hr ML20137X3751997-04-14014 April 1997 Notice of Violation from Insp on 970202-0315.Violation Noted:Positions of Valves 2-1302-U4-180 - 185 Not Verified Every 31 Days as Required ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support 1999-08-16
[Table view] |
Inspection Report - Vogtle - 1988005 |
---|
|
|
Text
4
-
UNITEo STATES
- /p27800g'. .. NUCLEAR REGULATORY COMMIS$10N !
O ' REGION 11 ;
h* 101 MARIETTA STREET. '
"# ATLANTA. GEORGI A 30323
~
s .... /
+
t
-
,
L
Report No.: 50-425/88-05 Licensee: Georgia Power Company P. O. Box 4545 Atlanta, GA 30302 Docket No.: 50-425 License No.: CPPR-109
'
Facility Name: Vogtle 2
,
Inspection Conducted: , January 11-14, 1988 inspectors: Y M. D. Hunt '
fAnth - hU
'
c0 ~/$ '0}
Date Signed
>
C h P. J. Fillion it;// py '/f'L
'
$~'l~TT '
Accompanying Personnel: M. N. Miller .
'
Approved by:C2 '#7"/ /L' ; # '/ - P3'
T. E., Conlon, Section Chief Date Signed ;
Engineering Branch Division of Reactor Safety
,
SUMMARY ;
Scope: This routine, unannounced inspection was in the areas of Electrical Components and Systems Work Observation and record; Electrical Cable work l observation and records; and Instrument Components and Systems Work Observation. One unresolved item was identifie ;
!
Results: No violations or deviations were identifie i i
i l
l
'gg21 Q$$k s f l V '
. .
,
,
L
'
,
a
, REPORT DETAILS -
, Persons Contacted Licensee Employees
- J. Adams, Lead Instrumentation Engineer, Mechanical Discipline Supervisor i W. Baimbridge, Cable Installation Engineering Supervisor 1 0. Borowski, Quality Control Supervisor i E. Duke, Assistance Discipline Manager-Electrical !
- D. M. Fiquett, Manager Field Construction Unit 2
'
- J. J. Gilmartion, Mechanical Discipline Staff Engineering Supervisor . !
- L. B. Glenn, Manager Quality Control ,
, *E. D. Groover, Quality Assurance Site Manager-Construction -
- A. W. Harreslon, Manager Electrical Discipline
- C. W. Hayes, Quality Assurance Manager, Site !
- R. E. Hollands, Electrical Construction Supervisor i M. P111are111, Field Engineer Electrical Discipline ;
- C, W. Rau, Manager Mechanical Discipline i
<
- P. O. Rice, Vice President and Project Director t
<
'
Other licensee employees contacted included construction craftsmen,
,
i engineers, technicians, office personne ,
Other Organizations
, *B. Edward, Resident Construction Manager, Pullman Power Products !
-
- J. E. Miller, Manager Quality Assurance, Pullman Power Products '
- J. Hill, Training Instructor, Cleveland Electric '
f NRC Resident Inspectors t
- R. J. Schepens, Senior Resident Inspector
l * Attended exit interview f Exit Interview i
, The inspection scope and findings were summarized on January 14, 1988, i
<
with those persons indicated in Paragraph 1 above. The inspectors described the areas inspected and discussed in detail the inspection !
finding No dissenting comments were received from the licensee. The !
following new item was identified during this inspection:
'
, URI- 50-425/88-05-01, By pass of QC hold point during High Potential j Test, i
i !
'
!
'
4 l r
.. . - . -. . ..
. i
.
,
2 ,
a-f 3. Licensee Action on Previous Enforcement Matters .
This subject was not addressed in the inspectio l 4. Unresolved Items :
I Unresolved items are matters about which more information is required to I determine whether they are acceptable or may involve violations or !
deviations. One unresolved item identified during this inspection -is ,
i discussed in Paragraph t
.,
5. Electrical Components and Systems, ' Work Observation (51053) and Record ;
Review (51055) ;
The inspectors selected various installed electrical components for f examination of the completed work, . work in progress and the QC records I associated with receiving inspection activities, storage, handling and .
installation of the selected components. The components inspected were '
energized and had been~ released to the testing group for functional !
testin The records for each component are contained in "Turn Over -
Packages". These packages consist of receipt inspection records and !
associated certifications, installation records, and acceptance testin .
where applicable. All components examined were identified by name plates
'
permanently affixed, and were covered to provide protection from surrounding construction activitie The equipment selected for i examination is identified belo '
ID N Name i
2-2403-PS-DG1 D/G Generator "A" Control Panel i 2-2403-PS-DG3 D/G Generator "B" Control Panel 2-1806-B3-BYA Train "A" Battery f 2-1806-B3-CBA Train "B" Battery Charger i 2-1806-03-DA1 Train "A" 125 VDC Distribution Panel !
2-1806-Q3-0B2 Train "B" 125 VDC Distribution Panel l 2-1804-53-A02 Train "A" 4160 V Switchgear 2-1805-53-805 Train "A" 480 V Switchgear !
2-1805-53-ABA Train "A" 480 V Motor Control Center l 2-1805-53-BBB Train "B" 480 V Motor Control Center l 2-1805-53-BB0 Train "B" 480 V Motor Control Center l 2-1816-U3-005 Isolation Device Panel Train A j 2-1821-U3-001 Safety Feature Sequence Panel "A" 2-1821-U3-002 Safety Feature Sequence Panel "B" 1
)
l i . _ . _ _ _ - ,
,
.
. :
!
,
. !
'
.
!
i The receipt, storage and installation of this equipment was performed and documented in accordance with the applicable specifications and procedures (
listed below:
l i
Construction Specifications
[
X3AR01-E2 Station Service Equipment
,
.
l X3AR01-E12 -Installation Procedures for Electrical Equipment '
j GPC Field Procedures I
>
CM-T-03 Inspection of Items in Storage ;
i Ch T-04 Maintenance of Items in Storage l
'
i ED-T-04 Installation of Major Electrical Equipment l
GD-T-11 Rigging, Hoisting, and Transporting of l Permanent Plant Equipment !
j GO-T-25 Change to Supplier Equipment at Jobsite GO-T-28 Component Removal
]
l Within the areas examined, no violations or deviation were identifie ! Electrical Cables-Work Observation (51063) and Record Review (51065)
i j The inspectus selected installed electrical power, control and !
1 instrumentation cables for examination. The routing of various cables was l
!' reviewed and verified to the cable tray routing listed on the "pull card". '
l In certain instances the routing was only verified to the point where the
<
cable exited conduit and entered a cable tray containing many similar
{ cables.
)
I In addition, the cable bend radius was examir:ed in various areas, cable j identification was verified, termination materials examined, and i segregation of power, control and instrumentation cables were verified, i The method of record preparation to insure traceability back to the
! manufacturers documentation was examined during this inspectio The
,
activities for the cable installation, termination and documentation are i
controlled by the requirements of procedure EO-T-07. Cable Installation j
and ED-T-08. Cable Termination.
a i
$ -
r
!
- . . _ - . , _ _ . - _ _ . _ _ ,_ , _ . ._ _ . ~ . _ _ _ . _ . _ .,_- _
.- _ - _
. . . -
,4 .
.
..
>
i
. The following cables were examined and compliance to various procedures l requirements verified.
2 i
, 2SA0396EA 2ABD09LA !
- 2BA0313EA 2BBD09LA !
'
!
2AA0213EA 2BBD29LC l a
t
'
2BB1609HA 2BBD29LB'
j 2BB1609HB '2BBD29LA (
',
The licensee's program for conducting huh ,aot; ilal [overvoitige] tests f on cables in the 4160 V safety-related distribution system was reviewed by ;
the NRC inspectors. The high potential test consist of applying a DC i overvoltage to each conductor in the cables for a specified tim i i In Section 17.1 of the FSAR the licensee stated that the QA program, for I i construction is designed to conform to Regulatory Guide (RG) 1.30 "Quality 1 Assurance Requirements for the Installation Inspection, and Testing of l Instrumentation and Electric Equipment." RG 1.30 which endorses ANSI . :
- N45.2.4-1972 (same title as RG 1.30 also designated IEEE Std. 336-1971), ,
.
'
calls for the conducting of overpotential test, RG 1.30 does not !
specifically call for inspectors to witness the overpotential tes !
Therefore, the licensee must decide whether or not those persons ;
i conducting the overpotential test have sufficient independence from those i
! responsible for installing the cables to conform to the requirements of [
.
GpCs Quality Asse ance Program in order to determine whether or not inspectors are required to monitor the test.
]
I Details for carrying out the high potential test are specified in several !
l industry standards. However, the licensee did not commit to using any !
} particular standar Procedure 25733-C "High Potential Testing Cable" Rev. 4 specifies, for the 4160 Volt system cables, that 36KV DC be applied -
to each conductor for five consecutive minutes. The procedure also states l
<
that, if the leakage current increases with time, extend the test period :
to 15 minutes. The tests were conducted after the cables were installed !
I and before they were energize !
+
The scope of the inspection was to review the applicable procedures and to i j review three data sheets for tests completed on cables selected at random,- I
!
!
Plant Vogtle Field Procedure. ED-T-07 "Cable 1 Insta11stion", Rev.12, t covers the performance of high potential test on cables. Had the test i been carried out by the Electrical Field Office, which is ?esponsible for !
,
construction ED-T-07 would have been used. However, the conducting of i J
the high potential test was delegated to the Start-up group (Site l l
'
!
! i
. t
_ .- _
1 - ..-
..
t 5 .
-
4 ,
Operations). The Start-up group used their own procedure, 25733-C, High
,
potential Testing Cable" to carry out the test. Procedure E0-T-07 calls,
for the Electrical Quality Control (QC) Inspection Supervisor to be notified prior to start of testing for Class IE cables. The procedure
, specifies the notification as a "Q.C. HOLD POINT". Procedure 25733-C
,
!
specifies, if work is safety-related, notify Q.C. prior to start of wor ,
Review of test sheets for safety-related cables 2BA0313EA, 2BA0306E and .
2AA0213EA indicated that the test was completed using the specified !
voltage, time duration and acceptance criteria of 100 micro-Amperes ,
leakage current. However, review of the data sheets for the three selected cables revealed that Quality Control did not sign-off the hold points as required by the procedure. In addition, the persons completing the data sheets checked-off non-safety-related when in f act the cables :
were safety-related [two cables, one had no check].
l The licensee investigated this matter after the NRC inspectors brought it to the attention of GpC management. As a result of this investigation, it l was revealed that an engineer from the Nuclear Operations group noted on l November 24, 1987, that Procedure 25733-C was not being followed with i respect to the notification of The engineer informed his supervisor :
-
of the failure to follow procedure. However, apparently the matter was l not investigated, since an Operations Deficiency Report was not written at :
that time. The NRC was further informed that QC was . involved in a test ,
i conducted on November 30, 1987, and all subsequent high potential tes '
i" As a result of this inspection finding, an Operations Deficiency Report '
has been generated after the inspection. According to licensee personnel, '
l the "QC HOLD POINT" was by passed during the testing of 37 cable '
) Since several questions raised by the NRC Inspectors required some '
research by the licensee, all the facts surrounding this matter could not
- be determined during the time period of the inspection. Questions asked of ,
, the licensee include the following: !
1 How many cables (total) require the high potential t:st? l
" How many high potential test were carried out according to all provisions of the procedure, including the notification of QC7 ,
4 .
- How did it happen that in at least two cases non-safety related was i d
checked off when in fact the cable was safety-related? In how many
- instances did this occur?
J Was the test carried out according to the recommendations of an industry standard?
j In summary, the licensee chose to make notification of QC prior to l conducting each high potential test a "QC HOLD POINT." One may conclude
'
this was important to his Quality Assurance program. Since the hold point ,
was by-passed in 37 cases, NR0 requirements in the area of procedures apparently were violated. However, all circumstances surrounding this
,
'
,
e i
__ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ .
_ _ _ _ _ _ . - _ _ _ _ _ _ _
.
'
.
t
'
'
.
,
I matter were not known at the time this report was issued. Therefore, the potential violation could not be characterized. Pending the acquisition of information described in this section, this matter. is identified as Unresolved Item 425/88-05-01, By pass of QC Hold Point during
, High-Potential Tes The following Control cable terminations were examined for compliance to [
- drawing 2X3D-CG F04A. Additionally proper lug size, cable tags and wire _ !
i markers were verified for these cables.- '
4 2BYF1075A 2BA03195P t
'
i 2BCBHG03BSB 2BCBAM10CSD
'
j 2BCBAM10CSC 2BA03195B !
!;
" !
2BCBHG03BSC 2BCBHG03135Z !
i !
,
2BA03195K 22ZV184SA
l
'
2BD1106LA
, i The inspectors examined the completed work of six safety-related instrument cable terminations. The terminations are cable splices requiring a termination splice kit. The cable pull card, the termination card, the termination inspection record, and the connection drawings for :
.
each cable was reviewe The inspectors verified for each cable ;
i termination the followin ,
At each termination the cables were properly identified as required !
i by procedure E0-T-08. Cable Terminatio i Each cable splice box was correctly identified by number and channel
'
identification color as specified on the Termination.
,
l
Each termination is properly located using the required termination splice ki *
'
i
) Each termination was inspected and documented by QC, I ,
! The following instrument cable terminations were inspecte ;
i l
j Instrument Cable Termination Box Channel Color j PT-455 l 21 CQ PSIAXT 2 ARJ B00 51 Brown .
! PT-456 22 CQ PS2AXT 2 BRJ B00 52 Green !
! PT-457 23 CQ PS3AXT 2 CRJ B00 53 Blue i PT-458 24 CQ PS4AXT 2 DRJ B00 54 Yellow i LT-460 22 CQ PS2AXW 2 BRJ B00 57 Green i LT-461 23 CQ PS3ZL 2 CRJ B00 58 Blue
Within the areas examined, no violations or deviation were identifie i
.
,
,. ,
.
.
'
l* I 7. Instrument-ComponentsAndSystems-WorkObservation(52053) ;
The inspectors performed walkdowns in the containment building to observe work in progress and completed work. The work in progress examined was the seismic tubing installation for main steam Loop 2 flow transmitters FT-522 and FT-523. The craft performing the work were using the latest approved drawings, documentation and Pullman Power - Products (PPP) -
t Procedure IX-40, "Instrumentation, Installation, Inspection and Testing".
l The instrument foreman and the QC inspectors monitoring the work were !
! interviewed and both were knowledgeable of the required documentation and construction Procedure PPP IX-4 ,
! The inspectors observed various portions of partially completed and ,
completed work for instruments associated with the pressurizer, the ,
,
reactor coolant loops and steam generator The work was examined to determined if :
l The location, configuration and installation is in accordance to the latest approved design and construction specification and drawing The specified instruments and items have been use ;
. ;
The components, have been correctly and permanently identified and ;
the channel identification color codes are as specifie l f
Cleanliness requirements have been maintained, j
Status of completion and readiness for pre-operational testing is l indicated (Released for Test-tagged) and records maintaine !
,
As-built drawings have been or are in the process of being completed, l
The following instrument Transmitters examined were:
l Level Flow Pressure LT-459 FT-424 PT-455 LT-460 FT-425 PT-456 LT-461 FT-426 PT-457 LT-527 FT-444 PT-458 LT-528 FT-445 LT-529 FT-446 LT-552 Within the areas examined, no violation deviations were identifie _ _ . -_ .. ..-. - .---, . - - - . . - , - _ _ _ .-