| number = ML20094J140
| number = ML20094J140
| issue date = 07/23/1984
| issue date = 07/23/1984
| title = Suppls Response to NRC 840606 Ltr Re Noncompliance Noted in IE Insp Repts 50-454/84-27 & 50-455/84-19.Changes to Pages 5 & 6 of 840710 Ltr Re Deficient Hangers Listed
| title = Suppls Response to NRC Re Noncompliance Noted in IE Insp Repts 50-454/84-27 & 50-455/84-19.Changes to Pages 5 & 6 of Re Deficient Hangers Listed
| author name = Farrar D
| author name = Farrar D
| author affiliation = COMMONWEALTH EDISON CO.
| author affiliation = COMMONWEALTH EDISON CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = 8999N, NUDOCS 8408140241
| document report number = 8999N, NUDOCS 8408140241
| title reference date = 06-06-1984
| package number = ML20094J103
| package number = ML20094J103
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 25: Line 26:


==Subject:==
==Subject:==
Byron Generating Station Units 1 and 2 I&E Inspection Report Nos. 50-454/84-27 and 50-455/84-19 References (a):                June 6, 1984 letter from R. L. Spessard to Cordell Reed.
Byron Generating Station Units 1 and 2 I&E Inspection Report Nos. 50-454/84-27 and 50-455/84-19 References (a):                {{letter dated|date=June 6, 1984|text=June 6, 1984 letter}} from R. L. Spessard to Cordell Reed.
(b):        July 10, 1984 letter from D. Farrar to J. Keppler.
(b):        {{letter dated|date=July 10, 1984|text=July 10, 1984 letter}} from D. Farrar to J. Keppler.


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==

Latest revision as of 19:02, 24 September 2022

Suppls Response to NRC Re Noncompliance Noted in IE Insp Repts 50-454/84-27 & 50-455/84-19.Changes to Pages 5 & 6 of Re Deficient Hangers Listed
ML20094J140
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/23/1984
From: Farrar D
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20094J103 List:
References
8999N, NUDOCS 8408140241
Download: ML20094J140 (2)


Text

r~

r(nua r -

.. / N Commonwealth Edison

, .) One First N1tional Plaza. C_hicago Ilhnois a

\ ,} Address Chicago, Reply to. Post Office Box lilinois 60690 7M July 23, 1984 Mr. James G. Keppler, Regional Administrator United States' Nuclear Regulatory Commission 799 Roosevelt' Road

. Glen Ellyn, Illinois 60137

Subject:

Byron Generating Station Units 1 and 2 I&E Inspection Report Nos. 50-454/84-27 and 50-455/84-19 References (a): June 6, 1984 letter from R. L. Spessard to Cordell Reed.

(b): July 10, 1984 letter from D. Farrar to J. Keppler.

Dear Mr. Keppler:

This letter provides revised information regarding one of the items of noncompliance identified in I&E Inspection Report Nos.

50-454/84-27 and 50-455/84-19.- During the week of July 19, 1984, the data which provided the basis for our reponse to violation 2 (50-454/84-07-01; 50-455/84-19-01) was reviewed by a Region III

. Inspector. As a result of this re-review the categorization of certain inspection results has been changed.

The information provided on pages 5 and 6 of Attachment A to reference (b) should be revised as shown below. The changes are underlined.

2. 38 deficiencies were reported for wrong connection detail, wrong weld length, elevation, auxiliary steel plate size, or missing bolts. After review, it was found that 43 deficiencies on 40 hangers were actually recorded. These AT deficiencies fall into the following classes:

a) 9 occur because the drawing revision had not changed a detail which had been previously approved by a Field Change Request or Engineering Change Notice, or were because of drafting errors resulting in inconsistent dimensions; g) 10 were due to member size and in some cases appear to be errors By the first inspector; JUL 24 DM 8408140241 840809 PDR ADOCK 05000454 G PDR _

f FF James G. Keppler July 23, 1984 After review, the data on the use of Memorandum 295 indicates that 12 actual deficiencies existed: 1 was a result of damage, 1 was a risult of missing bolts, and 10 were a result of member size. The 4 weld quality deficiencies hav's not been included in the population assessed te exist as a result of Memorandum 295, due to fact that 295 required that weld inspections with acceptable results were a requisite. With regard to the 12 deficiencies, we do not find that these constilute a failure to assure that nonconforming cable tray hangers were identified and corrected. Rather than failing to assure that nonconforming hangers were identified and corrected, there may have been an error of judgment in using accepted weld traveler records as an alternative means of accepting hanger connection details which were not visible due to fireproofing.

Please address any questions you may have regarding this matter to this office.

Very ruly yours, (Lm D. L. Farrar Director of Nuclear Licensing 1m Attachments 8999N