{{#Wiki_filter:November 7, 2006LICENSEE:Entergy Nuclear Operations, Inc.
{{#Wiki_filter:November 7, 2006 LICENSEE:       Entergy Nuclear Operations, Inc.
FACILITY:Pilgrim Nuclear Power Station
FACILITY:       Pilgrim Nuclear Power Station


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF CONFERENCE CALL ON SEPTEMBER 25, 2006, WITHENTERGY NUCLEAR OPERATIONS, INC., TO DISCUSS INFORMATION NOTED BY THE NRC'S PILGRIM AUDIT TEAM AND TO CLARIFY INFORMATION SENT TO THE U.S. NUCLEAR REGULATORY COMMISSION IN RESPONSE TO REQUESTS FOR ADDITIONAL INFORMATION REGARDING THE PILGRIM LICENSE RENEWAL APPLICATION (TAC NO. MC9669)The U.S. Nuclear Regulatory Commission (NRC) staff conducted a conference call with EntergyNuclear Operations, Inc. (Entergy or the applicant) regarding the Pilgrim License Renewal Application (LRA) to discuss information noted by the NRC's Pilgrim Audit Team and to clarify information sent to the NRC in response to requests for additional information (RAI). The conference call was conducted on Monday, September 25, 2006, between 12:30 p.m. and 1:30 p.m. at 11555 Rockville Pike, Rockville, MD 20852. The list of participants is shown in the enclosure. The following is a summary of the call:The Project Manager for the LRA provided an introduction and said that there were two remaining issues from the staff's previous Generic Aging Lessons Learned audit conducted at the applicant site during May - July, 2006 and that three RAI responses received by the NRC were not considered complete by the staff. These audit related issues were: (i) Inclusion of Relief Requests in Appendix B of the LRA, and (ii) Inclusion of BWRVIP-139 - Vessel &
OF CONFERENCE CALL ON SEPTEMBER 25, 2006, WITH ENTERGY NUCLEAR OPERATIONS, INC., TO DISCUSS INFORMATION NOTED BY THE NRCS PILGRIM AUDIT TEAM AND TO CLARIFY INFORMATION SENT TO THE U.S. NUCLEAR REGULATORY COMMISSION IN RESPONSE TO REQUESTS FOR ADDITIONAL INFORMATION REGARDING THE PILGRIM LICENSE RENEWAL APPLICATION (TAC NO. MC9669)
Internals Project, Steam Dryer Inspection and Flaw Evaluation Guidelines in the LRA List of Commitments. The three RAI issues were: (i) RAI 2.3.3.3 provide correct drawing identification, (ii) RAI 2.3.3.4 provide a drawing that adequately identifies crankcase exhausters, and (iii) RAI 2.3.3.4 provide clarification to Table 2.3.3-4 turbo charger identification. It was decided during the call that a RAI would not be required to resolve these issues. The applicant had an opportunity to comment on the phone call summary./RA/Perry Buckberg, Project ManagerLicense Renewal Branch A Division of License Renewal Office of Nuclear Reactor RegulationDocket No. 50-293
The U.S. Nuclear Regulatory Commission (NRC) staff conducted a conference call with Entergy Nuclear Operations, Inc. (Entergy or the applicant) regarding the Pilgrim License Renewal Application (LRA) to discuss information noted by the NRCs Pilgrim Audit Team and to clarify information sent to the NRC in response to requests for additional information (RAI). The conference call was conducted on Monday, September 25, 2006, between 12:30 p.m. and 1:30 p.m. at 11555 Rockville Pike, Rockville, MD 20852. The list of participants is shown in the enclosure. The following is a summary of the call:
The Project Manager for the LRA provided an introduction and said that there were two remaining issues from the staffs previous Generic Aging Lessons Learned audit conducted at the applicant site during May - July, 2006 and that three RAI responses received by the NRC were not considered complete by the staff. These audit related issues were: (i) Inclusion of Relief Requests in Appendix B of the LRA, and (ii) Inclusion of BWRVIP-139 - Vessel &
Internals Project, Steam Dryer Inspection and Flaw Evaluation Guidelines in the LRA List of Commitments. The three RAI issues were: (i) RAI 2.3.3.3 provide correct drawing identification, (ii) RAI 2.3.3.4 provide a drawing that adequately identifies crankcase exhausters, and (iii) RAI 2.3.3.4 provide clarification to Table 2.3.3-4 turbo charger identification. It was decided during the call that a RAI would not be required to resolve these issues.
The applicant had an opportunity to comment on the phone call summary.
                                                                /RA/
Perry Buckberg, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293


==Enclosure:==
==Enclosure:==
List of Participantscc w/encl:  See next page


ML062760508OFFICEPM:RLRA:DLRLA:DLRPM:RLRC:DLRBC:RLRA:DLRNAMEPBuckbergS. FigueroaJDavisLLund DATE10/19/0610/18/0610/19/0611/7/06 Conference Call Summary dated November 7, 2006
List of Participants cc w/encl: See next page
 
ML062760508 OFFICE      PM:RLRA:DLR          LA:DLR          PM:RLRC:DLR        BC:RLRA:DLR NAME        PBuckberg            S. Figueroa    JDavis              LLund DATE        10/19/06            10/18/06        10/19/06            11/7/06
 
Conference Call Summary dated November 7, 2006


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF CONFERENCE CALL ON SEPTEMBER 25, 2006 WITHENTERGY NUCLEAR OPERATIONS, INC., TO DISCUSS INFORMATION NOTED BY THE NRC'S PILGRIM AUDIT TEAM AND TO CLARIFY INFORMATION SENT TO THE NRC IN RESPONSE TO REQUESTS FOR ADDITIONAL INFORMATION REGARDING THE PILGRIM LICENSE RENEWAL APPLICATION (TAC NO. MC9669)HARD COPYDLR R/FE-MAIL: JFairRWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)
OF CONFERENCE CALL ON SEPTEMBER 25, 2006 WITH ENTERGY NUCLEAR OPERATIONS, INC., TO DISCUSS INFORMATION NOTED BY THE NRCS PILGRIM AUDIT TEAM AND TO CLARIFY INFORMATION SENT TO THE NRC IN RESPONSE TO REQUESTS FOR ADDITIONAL INFORMATION REGARDING THE PILGRIM LICENSE RENEWAL APPLICATION (TAC NO. MC9669)
SDuraiswamy YL (Renee) Li RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva
HARD COPY DLR R/F E-MAIL:
JFair RWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)
SDuraiswamy YL (Renee) Li RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff
----------
RSubbaratnam SHoffman SUttal JShea JDavis CAnderson, Region 1 WRaymond, Region 1 NSheehan, Region 1


RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff
Pilgrim Nuclear Power Station cc:
----------
Regional Administrator, Region I    Secretary of Public Safety U. S. Nuclear Regulatory Commission  Executive Office of Public Safety 475 Allendale Road                  One Ashburton Place King of Prussia, PA 19406-1415      Boston, MA 02108 Senior Resident Inspector            Director, Massachusetts Emergency U. S. Nuclear Regulatory Commission  Management Agency Pilgrim Nuclear Power Station        Attn: James Muckerheide Post Office Box 867                  400 Worcester Road Plymouth, MA 02360                  Framingham, MA 01702-5399 Chairman, Board of Selectmen        Mr. William D. Meinert 11 Lincoln Street                    Nuclear Engineer Plymouth, MA 02360                  Massachusetts Municipal Wholesale Electric Company Chairman                            P.O. Box 426 Nuclear Matters Committee            Ludlow, MA 01056-0426 Town Hall 11 Lincoln Street                    Mr. Michael A. Balduzzi Plymouth, MA 02360                  Site Vice President Entergy Nuclear Operations, Inc.
RSubbaratnam SHoffman SUttal JShea JDavis CAnderson, Region 1 WRaymond, Region 1 NSheehan, Region 1 Pilgrim Nuclear Power Station cc:Regional Administrator, Region IU. S. Nuclear Regulatory Commission
Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall                            600 Rocky Hill Road 878 Tremont Street                  Plymouth, MA 02360-5508 Duxbury, MA 02332 Mr. Stephen J. Bethay Office of the Commissioner          Director, Nuclear Safety Assurance Massachusetts Department of          Entergy Nuclear Operations, Inc.
Environmental Protection            Pilgrim Nuclear Power Station One Winter Street                    600 Rocky Hill Road Boston, MA 02108                    Plymouth, MA 02360-5508 Office of the Attorney General      Mr. Bryan S. Ford One Ashburton Place                  Manager, Licensing 20th Floor                          Entergy Nuclear Operations, Inc.
Boston, MA 02108                    Pilgrim Nuclear Power Station 600 Rocky Hill Road MA Department of Public Health      Plymouth, MA 02360-5508 Radiation Control Program Schrafft Center, Suite 1M2A          Mr. Gary J. Taylor 529 Main Street                      Chief Executive Officer Charlestown, MA 02129                Entergy Operations 1340 Echelon Parkway Jackson, MS 39213


475 Allendale Road King of Prussia, PA  19406-1415Senior Resident InspectorU. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA  02360Chairman, Board of Selectmen11 Lincoln Street Plymouth, MA  02360ChairmanNuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA  02360Chairman, Duxbury Board of SelectmenTown Hall 878 Tremont Street Duxbury, MA  02332Office of the CommissionerMassachusetts Department of Environmental Protection One Winter Street Boston, MA  02108Office of the Attorney GeneralOne Ashburton Place 20th Floor Boston, MA  02108MA Department of Public HealthRadiation Control Program Schrafft Center, Suite 1M2A 529 Main Street Charlestown, MA  02129Secretary of Public SafetyExecutive Office of Public Safety One Ashburton Place Boston, MA  02108 Director, Massachusetts Emergency  Management Agency Attn:  James Muckerheide 400 Worcester Road Framingham, MA  01702-5399Mr. William D. MeinertNuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA  01056-0426Mr. Michael A. BalduzziSite Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station           cc:
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA  02360-5508Mr. Stephen J. BethayDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
Mr. John T. Herron                          Ms. Stacey Lousteau Sr. VP and Chief Operating Officer         Treasury Department Entergy Nuclear Operations, Inc.            Entergy Services, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA  02360-5508Mr. Bryan S. FordManager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue                        639 Loyola Avenue White Plains, NY 10601                      New Orleans, LA 70113 Mr. Oscar Limpias                          Mr. James Sniezek Vice President, Engineering                 5486 Nithsdale Drive Entergy Nuclear Operations, Inc.           Salisbury, MD 21801 440 Hamilton Avenue White Plains, NY 10601                      Mr. Travis C. McCullough Assistant General Counsel Mr. Christopher Schwarz                    Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA  02360-5508Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS  39213 Pilgrim Nuclear Power Station cc:
Vice President, Operations Support         440 Hamilton Avenue Entergy Nuclear Operations, Inc.           White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601                     Mr. James Ross Nuclear Energy Institute Mr. John F. McCann                          1776 I Street, NW, Suite 400 Director, Nuclear Safety Assurance         Washington, DC 20006-3708 Entergy Nuclear Operations, Inc.
Mr. John T. HerronSr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue                         Plymouth Public Library White Plains, NY 10601                      Attn: Dinah OBrien 132 South Street Ms. Charlene D. Faison                      Plymouth, MA 02360 Manager, Licensing Entergy Nuclear Operations, Inc.           Duxbury Free Library 440 Hamilton Avenue                         ATTN: Ms. Elaine Winquist White Plains, NY 10601                      77 Alden Street Duxbury, MA 02332 Mr. Michael D. Lyster 5931 Barclay Lane                           Kingston Public Library Naples, FL 34110-7306                      ATTN: Reference Librarian 6 Green Street Mr. Michael J. Colomb                      Kingston, MA 02364 Director of Oversight Entergy Nuclear Operations, Inc.           Ms. Mary Lampert 440 Hamilton Avenue                         Duxbury Nuclear Advisory, Chair White Plains, NY 10601                      Pilgrim Watch, Director 148 Washington Street Duxbury, MA 02332 LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALL TO DISCUSS THE PILGRIM NUCLEAR POWER STATION
440 Hamilton Avenue White Plains, NY 10601Mr. Oscar LimpiasVice President, Engineering Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. Christopher SchwarzVice President, Operations Support Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCannDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Ms. Charlene D. FaisonManager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. Michael D. Lyster5931 Barclay Lane Naples, FL 34110-7306Mr. Michael J. ColombDirector of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY  10601Ms. Stacey LousteauTreasury Department Entergy Services, Inc.
639 Loyola Avenue New Orleans, LA  70113Mr. James Sniezek5486 Nithsdale Drive Salisbury, MD  21801Mr. Travis C. McCulloughAssistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. James RossNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC  20006-3708Plymouth Public LibraryAttn: Dinah O'Brien 132 South Street Plymouth, MA  02360Duxbury Free LibraryATTN:  Ms. Elaine Winquist 77 Alden Street Duxbury, MA 02332


Kingston Public Library ATTN: Reference Librarian 6 Green Street Kingston, MA  02364Ms. Mary LampertDuxbury Nuclear Advisory, Chair Pilgrim Watch, Director 148 Washington Street Duxbury, MA  02332LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALL TO DISCUSS THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATIONSeptember 25, 2006PARTICIPANTSAFFILIATIONPerry BuckbergU.S. Nuclear Regulatory Commission (NRC)Ram SubbaratnamNRC James DavisNRC Peter WenNRC Angelo StubbsNRC Kenneth ChangNRC Robert HsuNRC Ganesh CheruvenkiNRC Simon SchengNRC Doug EllisEntergy Nuclear Operations, Inc. (Entergy)
LICENSE RENEWAL APPLICATION September 25, 2006 PARTICIPANTS            AFFILIATION Perry Buckberg          U.S. Nuclear Regulatory Commission (NRC)
Fred MogoleskoEntergy Ray PaceEntergy Rich PardeeEntergy Andy Taylor Entergy Lori Potts Entergy Steve PopeInformation System Laboratories (ISL)
Ram Subbaratnam        NRC James Davis            NRC Peter Wen              NRC Angelo Stubbs          NRC Kenneth Chang          NRC Robert Hsu              NRC Ganesh Cheruvenki      NRC Simon Scheng            NRC Doug Ellis              Entergy Nuclear Operations, Inc. (Entergy)
Kim GreenISL Cliff MarksISLENCLOSURE}}
Fred Mogolesko          Entergy Ray Pace                Entergy Rich Pardee            Entergy Andy Taylor             Entergy Lori Potts             Entergy Steve Pope              Information System Laboratories (ISL)
Kim Green              ISL Cliff Marks            ISL ENCLOSURE}}

Revision as of 14:34, 23 November 2019

2006/11/07-Summary of Conference Call on September 25, 2006, with Entergy Nuclear Operations, Inc
ML062760508
Person / Time
Site: Pilgrim
Issue date: 11/07/2006
From: Perry Buckberg
NRC/NRR/ADRO/DLR/RLRA
To:
Buckberg, P., PM, RLRA, 415-1383
References
%dam200612, TAC MC9669
Download: ML062760508 (6)


Text

November 7, 2006 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Pilgrim Nuclear Power Station

SUBJECT:

SUMMARY

OF CONFERENCE CALL ON SEPTEMBER 25, 2006, WITH ENTERGY NUCLEAR OPERATIONS, INC., TO DISCUSS INFORMATION NOTED BY THE NRCS PILGRIM AUDIT TEAM AND TO CLARIFY INFORMATION SENT TO THE U.S. NUCLEAR REGULATORY COMMISSION IN RESPONSE TO REQUESTS FOR ADDITIONAL INFORMATION REGARDING THE PILGRIM LICENSE RENEWAL APPLICATION (TAC NO. MC9669)

The U.S. Nuclear Regulatory Commission (NRC) staff conducted a conference call with Entergy Nuclear Operations, Inc. (Entergy or the applicant) regarding the Pilgrim License Renewal Application (LRA) to discuss information noted by the NRCs Pilgrim Audit Team and to clarify information sent to the NRC in response to requests for additional information (RAI). The conference call was conducted on Monday, September 25, 2006, between 12:30 p.m. and 1:30 p.m. at 11555 Rockville Pike, Rockville, MD 20852. The list of participants is shown in the enclosure. The following is a summary of the call:

The Project Manager for the LRA provided an introduction and said that there were two remaining issues from the staffs previous Generic Aging Lessons Learned audit conducted at the applicant site during May - July, 2006 and that three RAI responses received by the NRC were not considered complete by the staff. These audit related issues were: (i) Inclusion of Relief Requests in Appendix B of the LRA, and (ii) Inclusion of BWRVIP-139 - Vessel &

Internals Project, Steam Dryer Inspection and Flaw Evaluation Guidelines in the LRA List of Commitments. The three RAI issues were: (i) RAI 2.3.3.3 provide correct drawing identification, (ii) RAI 2.3.3.4 provide a drawing that adequately identifies crankcase exhausters, and (iii) RAI 2.3.3.4 provide clarification to Table 2.3.3-4 turbo charger identification. It was decided during the call that a RAI would not be required to resolve these issues.

The applicant had an opportunity to comment on the phone call summary.

/RA/

Perry Buckberg, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

List of Participants cc w/encl: See next page

ML062760508 OFFICE PM:RLRA:DLR LA:DLR PM:RLRC:DLR BC:RLRA:DLR NAME PBuckberg S. Figueroa JDavis LLund DATE 10/19/06 10/18/06 10/19/06 11/7/06

Conference Call Summary dated November 7, 2006

SUBJECT:

SUMMARY

OF CONFERENCE CALL ON SEPTEMBER 25, 2006 WITH ENTERGY NUCLEAR OPERATIONS, INC., TO DISCUSS INFORMATION NOTED BY THE NRCS PILGRIM AUDIT TEAM AND TO CLARIFY INFORMATION SENT TO THE NRC IN RESPONSE TO REQUESTS FOR ADDITIONAL INFORMATION REGARDING THE PILGRIM LICENSE RENEWAL APPLICATION (TAC NO. MC9669)

HARD COPY DLR R/F E-MAIL:

JFair RWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)

SDuraiswamy YL (Renee) Li RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff


RSubbaratnam SHoffman SUttal JShea JDavis CAnderson, Region 1 WRaymond, Region 1 NSheehan, Region 1

Pilgrim Nuclear Power Station cc:

Regional Administrator, Region I Secretary of Public Safety U. S. Nuclear Regulatory Commission Executive Office of Public Safety 475 Allendale Road One Ashburton Place King of Prussia, PA 19406-1415 Boston, MA 02108 Senior Resident Inspector Director, Massachusetts Emergency U. S. Nuclear Regulatory Commission Management Agency Pilgrim Nuclear Power Station Attn: James Muckerheide Post Office Box 867 400 Worcester Road Plymouth, MA 02360 Framingham, MA 01702-5399 Chairman, Board of Selectmen Mr. William D. Meinert 11 Lincoln Street Nuclear Engineer Plymouth, MA 02360 Massachusetts Municipal Wholesale Electric Company Chairman P.O. Box 426 Nuclear Matters Committee Ludlow, MA 01056-0426 Town Hall 11 Lincoln Street Mr. Michael A. Balduzzi Plymouth, MA 02360 Site Vice President Entergy Nuclear Operations, Inc.

Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall 600 Rocky Hill Road 878 Tremont Street Plymouth, MA 02360-5508 Duxbury, MA 02332 Mr. Stephen J. Bethay Office of the Commissioner Director, Nuclear Safety Assurance Massachusetts Department of Entergy Nuclear Operations, Inc.

Environmental Protection Pilgrim Nuclear Power Station One Winter Street 600 Rocky Hill Road Boston, MA 02108 Plymouth, MA 02360-5508 Office of the Attorney General Mr. Bryan S. Ford One Ashburton Place Manager, Licensing 20th Floor Entergy Nuclear Operations, Inc.

Boston, MA 02108 Pilgrim Nuclear Power Station 600 Rocky Hill Road MA Department of Public Health Plymouth, MA 02360-5508 Radiation Control Program Schrafft Center, Suite 1M2A Mr. Gary J. Taylor 529 Main Street Chief Executive Officer Charlestown, MA 02129 Entergy Operations 1340 Echelon Parkway Jackson, MS 39213

Pilgrim Nuclear Power Station cc:

Mr. John T. Herron Ms. Stacey Lousteau Sr. VP and Chief Operating Officer Treasury Department Entergy Nuclear Operations, Inc. Entergy Services, Inc.

440 Hamilton Avenue 639 Loyola Avenue White Plains, NY 10601 New Orleans, LA 70113 Mr. Oscar Limpias Mr. James Sniezek Vice President, Engineering 5486 Nithsdale Drive Entergy Nuclear Operations, Inc. Salisbury, MD 21801 440 Hamilton Avenue White Plains, NY 10601 Mr. Travis C. McCullough Assistant General Counsel Mr. Christopher Schwarz Entergy Nuclear Operations, Inc.

Vice President, Operations Support 440 Hamilton Avenue Entergy Nuclear Operations, Inc. White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601 Mr. James Ross Nuclear Energy Institute Mr. John F. McCann 1776 I Street, NW, Suite 400 Director, Nuclear Safety Assurance Washington, DC 20006-3708 Entergy Nuclear Operations, Inc.

440 Hamilton Avenue Plymouth Public Library White Plains, NY 10601 Attn: Dinah OBrien 132 South Street Ms. Charlene D. Faison Plymouth, MA 02360 Manager, Licensing Entergy Nuclear Operations, Inc. Duxbury Free Library 440 Hamilton Avenue ATTN: Ms. Elaine Winquist White Plains, NY 10601 77 Alden Street Duxbury, MA 02332 Mr. Michael D. Lyster 5931 Barclay Lane Kingston Public Library Naples, FL 34110-7306 ATTN: Reference Librarian 6 Green Street Mr. Michael J. Colomb Kingston, MA 02364 Director of Oversight Entergy Nuclear Operations, Inc. Ms. Mary Lampert 440 Hamilton Avenue Duxbury Nuclear Advisory, Chair White Plains, NY 10601 Pilgrim Watch, Director 148 Washington Street Duxbury, MA 02332 LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALL TO DISCUSS THE PILGRIM NUCLEAR POWER STATION

LICENSE RENEWAL APPLICATION September 25, 2006 PARTICIPANTS AFFILIATION Perry Buckberg U.S. Nuclear Regulatory Commission (NRC)

Ram Subbaratnam NRC James Davis NRC Peter Wen NRC Angelo Stubbs NRC Kenneth Chang NRC Robert Hsu NRC Ganesh Cheruvenki NRC Simon Scheng NRC Doug Ellis Entergy Nuclear Operations, Inc. (Entergy)

Fred Mogolesko Entergy Ray Pace Entergy Rich Pardee Entergy Andy Taylor Entergy Lori Potts Entergy Steve Pope Information System Laboratories (ISL)

Kim Green ISL Cliff Marks ISL ENCLOSURE