Entergy Nuclear Operations, Inc.

vow-rEnteW Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Stephen J. Bethay rDetor. NLjc;Ia r S,;.f v A-SSLu;trirC0 October 21, 2010 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket 50-293 License No. DPR-35 Pilgrim Nuclear Power Station License Renewal Application Annual Update Supplement (TAC MC9669)

REFERENCES:

1. Entergy Letter to U.S. NRC, License Renewal Application, dated January 25, 2006
2. NRC Letter, "Summary of Telephone Conference Call Held on May 25, 2010, between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning the Annual Update Associated with the Pilgrim Nuclear Power Station License Renewal Application", dated October 15, 2010
3. Entergy Letter, 2.09.074, to U.S. NRC, Pilgrim Power Station License Renewal Application Annual Update, dated December 28, 2009 LETTER' NUMBER: 2.10.046

Dear Sir or Madam:

By Reference 1, Entergy Nuclear Operations, Inc. (Entergy) submitted the License Renewal Application (LRA) for Pilgrim Nuclear Power Station (PNPS).

Pursuant to 10 CFR 54.21(b), Entergy submitted the 2009 Pilgrim License Renewal Application (LRA) Annual Update by Entergy Letter 2.09.074, dated December 28, 2009 (Reference 3).

Upon review of the 2009 LRA Annual Update, the NRC staff had questions concerning the following issues:

0 Metamic 0 Emergency diesel generator air start system S Recirculation pump cover thermal barrier Entergy and NRC staff held several telephone conference calls, including Reference 2, concerning the above issues. Attachment 1 of this letter provides information clarifying each of the above issues.

5 Aup* 4-T

Entergy Nuclear Operations, Inc Letter Number 2.10.046 Pilgrim Nuclear Power Station Page 2 Entergy is required by 10 CFR 54.21(b) to report changes to the current licensing basis (CLB) that materially affect the content of the PNPS LRA, including the Safety Analysis Report (SAR) supplement. In accordance with this requirement, Entergy has provided the requested supplement to the annual update.

This letter contains no commitments.

If you have any questions or require additional information, please contact Mr. Joseph R. Lynch, Licensing Manager, at (508) 830-8403.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on the - of October, 2010 Sincerely, Stephen J. Bethay : Entergy Response to Additional Information Related Pilgrim License Renewal Changes (8 pages)

Entergy Nuclear Operations, Inc Letter Number 2.10.046 Pilgrim Nuclear Power Station Page 3 cc:

Ms. Lisa Regner Mr. Matthew Brock, Esq.

Project Manager Commonwealth of Massachusetts Office of Nuclear Reactor Regulation Assistant Attorney General U.S. Nuclear Regulatory Commission Environmental Protection Division Washington, DC 20555-0001 One Ashburton Place Boston, MA 02108 Susan L. Uttal, Esq. Diane Curran, Esq.

Office of the General Counsel Harmon, Curran, and Eisenberg, L.L.P.

U.S. Nuclear Regulatory Commission 1726 M Street N.W., Suite 600 Mail Stop 0-15 D21 Washington, DC 20036 Washington, DC 20555-0001 Mr. Robert Walker, Acting Director Mr. Richard Guzman Massachusetts Department of Public Health Office of Nuclear Reactor Regulation Radiation Control Program U.S. Nuclear Regulatory Commission Schrafft Center, Suite 1M2A Washington, DC 20555-0001 529 Main Street Charlestown, MA 02129 Sheila Slocum Hollis, Esq. Mr. John Giarrusso Jr.

Duane Morris LLP Nuclear Preparedness Manager, 1667 K Street N.W., Suite 700 Mass. Emergency Management Agency Washington, DC 20006 400 Worcester Road Framingham, MA 01702 Mr. Michael F. Weber, Director Mr. Eric J. Leeds, Director Office of Nuclear Material and Safeguards Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-00001 Washington, DC 20555-00001 NRC Resident Inspector William Dean Pilgrim Nuclear Power Station Regional Administrator US NRC Region 1 475 Allendale Road King of Prussia, PA 19406

Entergy Response to Additional Information Related to Pilgrim License Renewal Annual Update Changes Attachment 1 To Entergy Letter No. 2.10.046 (8 pages)

Entergy Response to Additional Information Related to Pilgrim License Renewal Annual Update Changes

1. Metamic Issue:

In the Pilgrim License Renewal Application annual update dated December 28, 2009 (Letter No. 2.09.074), it is stated that Metamic is now in use for the Spent Fuel Pool (SFP) racks. Metamic is relied upon for criticality protection.

The 2009 FSAR update recognizes changes to include the use of Metamic in the SFP.

The cover letter states that "there were no new 10 CFR 50.59 evaluations during the period July 1, 2007 through June 30, 2009."

Discussion:

In the 50.59 screening analysis for Engineering Change (EC) # 4353-Spent Fuel Pool Capacity Expansion, Pilgrim evaluated whether Metamic can be used in the spent fuel pool racks. The key points are:

  • Boral is no longer commercially available so a substitute equivalent, Metamic, was to be used.
  • Reviewed TS 4.3 and found no changes necessary.
  • Reviewed FSAR sections 10.3 and 10.4 and found that updates were required for sections 10.3.4.1, 10.3.6, and 10.3.8, Figures 10.3-4, 10.3-5, and 10.3-7.
  • License Amendment dated June 22, 1994 approved Pilgrim to install additional racks into the SFP.
  • Metamic and Boral are equivalent.
  • Metamic has been approved for use as a neutron absorber-by USNRC SER 2003 (ANO).
  • Metamic was evaluated to ensure the critical parameters of the approved design are met:
1. Same size and weight
2. B-10 areal loading comparable
3. No structural effects NRC has identified that section 3.3.2.2.6 of NUREG-1801 regarding the potential loss of material and loss of neutron-absorption capability requires clarification to include different fuel rack materials. Pilgrim reviewed LR-ISG-2009-1 and determined the following:

0 The SFP Boraflex material is managed under the criteria identified in section X1.M22 of the GALL.

  • Metamic and Boral materials are managed under criteria of Xl.M40 as recommended in LR-ISG- 2009-01.

A comparison of the GALL and ISG criteria for Pilgrim compliance follows.

2

Entergy Response to Additional Information Related to Pilgrim License Renewal Annual Update Changes Xl .M22 (Boraflex)

ISG Criteria Pilgrim Compliance

" Frequency of Badger testing: < 5years Badger tests were performed in 2006 and are scheduled for 2011 based on 2006 results and Racklife Program.

  • Blackness Test Performed in 1996 and 1998 and superseded by Badger Testing in 2006.

" Trend SFP Silica levels and evaluate Silica levels are trended monthly and presently using the Racklife Program; monthly, evaluated once per cycle using the Racklife quarterly, or annually Program. Program being revised for annual evaluation, before the period of extended operation.

" Measure Boron Areal Density using in- Performed in-situ Badger test in 2006 situ Badger Test ISG-2009-01-Xl.M40 (Material other than Boraflex)

ISG Criteria Pilgrim Compliance

  • Monitor loss of material and Pilgrim uses Coupon Program Surveillance for its degradation of neutron absorption Boral and Metamic Rack material.

capability via Badger Testing, or Coupon Program Surveillance Boral Coupons were retrieved and tested, based on the manufacturer's recommended surveillance schedule in 2006 and 2009. A Metamic SFP Rack and Coupon-Tree was installed in accordance with EC#4353 in 2009. Based on manufacturer and NRC guidelines, the first Metamic coupon is scheduled for retrieval and testing in 2011.

Pilgrim will manage the effects of aging of its SFP Racks in accordance with the clarification contained within LR-ISG-2009-01, Interim Staff guidance regarding the AMR of SFP materials. Boraflex material will be managed according to tenets of X1.M22 GALL. Boral and Metamic will be managed according to tenets of ISG-2009-01 -Xl .M40.

2. Emergency Diesel Generator Air Start System Issue Pilgrim's LRA Drawing M219 showed a component identified as a "Motor Oil Fogger" in the piping from the Emergency Diesel Generator (EDG) air receiver tanks to one of the two sets of air start motors on the "A" EDG. The drawing showed "Motor Oil Foggers" in the piping on both sets of the air start motors for "B" EDG. The "Fogger Housing" described a unique component type whose integrity would be necessary to assure accomplishment of EDG intended function. PNPS License Renewal Annual Update Letter # 2.09.074 discussed the deletion of the "Fogger Housing" resulting in the following questions.

0 How "Fogger Housing" is no longer required to support EDG intended function?

0 How the pressure boundary function is being achieved?

3

Entergy Response to Additional Information Related to Pilgrim License Renewal Annual Update Changes Summary:

" The new EDG air start motors do not require lubricated air, so the motor oil foggers with their "Fogger Housings" are no longer required.

  • When the foggers were removed they were replaced with air piping components maintaining the pressure boundary.

Discussion:

The Motor Oil Fogger and its housing are no longer needed to support the EDG intended function because the recently installed turbine type air motor does not require lubricated air. The original vane type motors utilize sliding vanes that rub against the motor housing walls and because of this internal friction vane type motors require oil foggers to provide constantly lubricated air.

The turbine type air motor uses blades to convert pneumatic power to mechanical power; the internal parts do not rub against the walls. The turbine type motor has permanently lubricated bearings and does not require an oil fogger as part of its air supply system.

Vane type Air Motor Turbine type air motor with gear reducer

/ \

The vane type air start motors were replaced with turbine type air start motors using the Pilgrim Design Change Process (PDC 00-12, PDC 03-59, and EC0000012969); a PDC is a Plant Design Change, which is now called an EC, or an Engineering Change. The modifications were done over a period of years, during periods when the individual EDGs were out of service for extended PMs. This was intentionally scheduled to minimize the EDG System unavailability. This staged approach was the reason that LRA drawing M219 reflected "Fogger Housings" on some, but not all air lines to the air start motors.

The design changes installed the turbine type air motors on the EDGs, and removed the oil fogger, housing, and the inlet/outlet piping connections to the air starting system. The air pressure regulators, solenoid valves, and manual operating valves were replaced at the same time with higher air flow capacity units which maintain the pressure boundary.

This reduced the differential pressure losses through the components, thereby providing increased oil pressure at the air motor: Post work tests were conducted to validate, and confirm that the air system performance met FSAR requirements. At this time, all vane type air motors have been replaced with turbine type air motors, and there are no "Motor oil Foggers" or "Fogger Housings" on the EDG air start systems.

4

Entergy Response to Additional Information Related to Pilgrim License Renewal Annual Update Changes A safety screen was performed as part of the Process Applicability Determination (10CFR50.59 review process) for each PDC. It includes a basis that should allow the reviewer to reasonably reach same conclusion; that the air start system modification does not change the FSAR requirements in any way, and serves to improve the system reliability to achieve those requirements.

A comparison of the P&ID drawings M219 revisions demonstrates that the air system boundary was maintained and controlled as each set of vane type air motors were replaced with turbine type air motors. The following sections from P&ID drawing M219 shows the progression from a single turbine style air motor (and 3 vane type motors with oil foggers) as shown in the LRA drawing (Rev 19), to the current configuration with 4 turbine style air motors (Rev 23), and no motor oil foggers.

5

Entergy Response to Additional Information Related to Pilgrim License Renewal Annual Update Changes

3. Recirculation Pump Cover Thermal Barrier Issue PNPS License Renewal Annual Update Letter # 2.09.074 modified LRA Table 2.3.1-3 and removed the "pump cover thermal barrier (RR)" on page 2.3-11, without explaining the change.

6

Entergy Response to Additional Information Related to Pilgrim License Renewal Annual Update Changes Summary:

Pilgrim replaced the Reactor Recirculation Pump internals and covers during Refueling Outage (RFO) 16 (April 2007), for P201-B; and RFO 17 (April 2009), for P201-A. The new Flowserve 4 th generation pump internals and cover design change was implemented using ER#03118234. The design eliminated the "pump cover thermal barrier", which is a cooling water passage through the cover. The cooling water passage was a pressure boundary for RBCCW, and as part of the cover, a pressure boundary for reactor recirculation flow.

The new 4 th generation Reactor Recirculation Pumps at Pilgrim no longer include a "1pump cover thermal barrier", so this item was removed from Table 2.3.1-3 in the 2009 LRA Annual Update. The "Pump casing and cover" remain in the table, with the intended function of pressure boundary.

The modified table 2.3.1-3 from the 2009 update is shown below:

7. LRA Table 2.3.1-3, Reactor Coolant Pressure Boundary Components Subject to Aging Management Review, is revised as follows.

Page 2.3-11 I Component Type Intended Function Pumoov~.U#R~os~e~fR} Pr~ess~ eeund" Discussion:

ER# 03118234 Nuclear Change Narrativo Page 10 of 24 3.0 Evaluation/Design SumMntry 3,1 Evaluation Resolution" This major rebuild/upgrade of the Reactor Recirculation Pumps (P-201lAB) includes only design changes that are for the purpose of upgrading the long-term reliability of the cquipment by eliminating existing potential problems. The "Fourth Generation" pump design from the OEM (Flowserve, formerly Byron Jackson) was created primarily to eliminate concerns with thermal fatigue cracking of the pump shafts and covers that was noted industry-wide for this type of Reactor Recirculation or Reactor Coolant Pump.

The mechanical seal cooler has been completely reconfigured from the previous shell and tube type heat exchanger to a more robust tube-less cooler housing. The previous pump cover cooling has been completely eliminated resulting in only two connections of RBCCW cooling water to the pump versus the previous four connections. The mechanical connection of the impeller to the pump shaft has bccn replaced with an all-welded design. The pump cover gasket has been improved and the coverjoint closure will be done with a stud-bolt and nut configuration versus the existing cap screws.

7

Entergy Response to Additional Information Related to Pilgrim License Renewal Annual Update Changes Table 2.3.1-3 on page 2.3-11 of the LRA submittal is titled "Reactor Coolant Pressure boundary Components subject to Aging Management Review". The 1 1th and 12 th items on the list are:

Component Type Intended Function Pump casing and cover (RR) Pressure boundary Pump cover thermal barrier (RR) Pressure Boundary The new 4 th generation Reactor Recirculation Pumps at Pilgrim no longer include a "pump cover thermal barrier", so this item was removed from Table 2.3.1-3 during the 2009 LRA Annual Update. The "Pump casing and cover" remain on the list.

8