MONTHYEARML21257A3822021-09-15015 September 2021 Summary of Clarification Cal with Holtec Decommissioning International, Llc. Regarding Second Follow-On Emergency Preparedness Request for Additional Information ML21238A2752021-08-26026 August 2021 Clarification Call Regarding RAI License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Plan ML21075A3152021-03-17017 March 2021 March 11,2021 Pilgrim Request for Additional Information Response Clarifiction Meeting - Proposed Physical Security Plan ML21035A2312021-02-18018 February 2021 Physical Security Plan - RAI Clarification Meeting ML21035A1712021-02-18018 February 2021 Physical Security Plan - ISFSI Only Meeting Summary ML20045D1082020-02-19019 February 2020 January 31, 2020 Meeting Summary Pre-Amendment Meeting Proposed Changes to Pilgrim ISFSI Physical Security Plan ML19274B6662019-11-13013 November 2019 Summary of Public Meeting Near the Pilgrim Nuclear Power Station Regarding the Establishment and Operation of Community Advisory Boards ML19121A2172019-04-30030 April 2019 Annual Assessment Meeting for Pilgrim Nuclear Power Station - Meeting Summary ML19017A1732019-01-30030 January 2019 Summary of 1/15/2019 Public Meeting Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report, Which Includes the Site-Specific Decommissioning Cost Estimate ML18275A3952018-10-12012 October 2018 9/25/2018 Summary of Pre-submittal Meeting with Entergy Nuclear and Holtec International to Discuss Potential License Transfer Application for Pilgrim Nuclear Power Plant ML18130A1592018-05-0909 May 2018 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML17173A7672017-07-28028 July 2017 Summary of 6/20/2017 Meeting with Entergy to Discuss Plan for Decommissioning Licensing Actions of Palisades, Pilgrim, Indian Point, Units 2 and 3, and Vermont Yankee ML17101A3992017-04-13013 April 2017 Statement of Congressman Keating - NRC Annual Assessment Meeting for PNPS - March 21, 2017 ML17103A4132017-04-13013 April 2017 3/21/2017 - Annual Assessment/95003 Inspection Exit Summary Meeting for Pilgrim Nuclear Power Station ML17059C9192017-02-28028 February 2017 1/31/2017 - Summary of Category 3 Public Meeting - Preliminary Findings and Status of 95003 Inspection at Pilgrim ML16116A0052016-04-22022 April 2016 4/13/2016 - Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station ML15306A0122015-11-0505 November 2015 Summary of October 20, 2015, Teleconference with Entergy Nuclear Operations to Discuss Proposed Changes to Emergency Response Organization Training for Pilgrim Nuclear Power Station ML15092A7932015-04-0202 April 2015 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 3/18/15 ML14136A3502014-05-14014 May 2014 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 5/1/2014 (W/Nrc Presentation Slides) ML14086A2912014-04-22022 April 2014 Summary of Telephone Conference Regarding the Verbal Authorization of Relief Request PRR-25, Revision 1 ML13109A4362013-04-19019 April 2013 4/2/2013 - Pilgrim - Annual Assessment Meeting Summary ML12101A3742012-04-10010 April 2012 Summary of Meeting with Pilgrim Nuclear Power Station 2011 Annual Assessment ML11292A1612011-10-20020 October 2011 Summary of Meeting with Beyond Nuclear Regarding Their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors ML1118105332011-06-30030 June 2011 Summary of Annual Assessment Public Meeting with Entergy Nuclear Operation, Inc ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML11166A1342011-06-22022 June 2011 Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs) ML1110401712011-04-27027 April 2011 04/5/2011 Summary of Preapplication Meeting with Entergy Operations, Inc. to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1108206892011-04-19019 April 2011 February 24, 2011, Summary of Telephone Conference Call Held Between NRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1109700342011-04-19019 April 2011 Summary of Tele Conf Call Held on 4/6/11, Between the USNRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1108202082011-04-11011 April 2011 Summary of Telephone Conference Call Held on March 23, 2011, Between the USNRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1100404192011-02-15015 February 2011 Summary of Telephone Conference Call Held on December 6, 2010, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operating, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application (Tac No. MC9669) ML1034105062011-01-0707 January 2011 December 1, 2010, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1025900772010-10-15015 October 2010 Summary of Telephone Conference Call Held on 6/2/10 Btw the USNRC and Entergy Nuclear Operations, Inc. Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1025900862010-10-15015 October 2010 5/25/10 Summary of Telephone Conference Call Held Between USNRC and Entergy Nuclear Operations, Inc. Concerning the Annual Update Associated with the Pilgrim Nuclear Power Station License Renewal Application ML1012603632010-05-0606 May 2010 Summary of Annual Assessment Open House Public Meeting Discussed Nrc'S Assessment of Safety Performance of Pilgrim for Cy 2009 ML1011100082010-04-21021 April 2010 Summary of Public Meeting to Discuss the Results of Entergy Nuclear Plant Safety Culture Workplace Survey ML0909702992009-04-13013 April 2009 Annual Assessment Meeting Summary, Slides, Sign-in Sheet, Misc Documents, for 3/26/09 Meeting ML0809202432008-04-0101 April 2008 Summary of March 28, 2008, Annual Assessment Meeting with Entergy Nuclear Operations, Inc ML0724302642007-09-0707 September 2007 08/30/2007 Summary of Telephone Conference Call Between the U.S. NRC and Entergy Nuclear Operations, Inc., to Discuss and Clarify Commitment No. 47 Pertaining to the Pilgrim Nuclear Power Station License Renewal Application ML0713701422007-05-18018 May 2007 Summary of Annual Assessment Meeting with Entergy Nuclear Operations, Inc., Regarding the Nrc'S Assessment of the Safety Performance of Pilgrim Nuclear for the Calendar Year 2006 ML0710300932007-05-0101 May 2007 03/14-15/2007 Summary of Conference Calls with Entergy Nuclear Operations Inc., Pilgrim License Renewal Application, Pilgrim Request for Additional Information B.1.16.1, and Neutron Fluence ML0710300532007-04-27027 April 2007 Summary of Conference Calls on April 2, 2007, with Entergy Nuclear Operations, Inc., Regarding the Pilgrim License Renewal Application ML0710300482007-03-19019 March 2007 E-mail: (PD) Meeting Summary - March 14 & 15 2007 - from Perry Buckberg to Doug Ellis 3/19/07 7:05am ML0706005672007-03-15015 March 2007 Summary of the License Renewal Telephone Conference Call and Meeting Held Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute License Renewal Task Force ML0710302212007-03-0707 March 2007 E-MAIL: (PD) Updated - Week of 2/26 Conference Call Record from Perry Buckberg to Doug Ellis 3/7/07 6:36am ML0705402052007-03-0101 March 2007 01/24/2007 Summary of Meeting with Pilgrim on the Draft Supplemental Environmental Impact Statement Regarding Pilgrim License Renewal Review ML0635400102007-01-18018 January 2007 12/18/2006 Summary of Conference Call with Entergy Nucelar Operations, Inc., Regarding the Pilgrim License Renewal Application ML0634800532006-12-29029 December 2006 2006/12/29-Summary of Conference Call on December 12, 2006, with Entergy Nuclear Operations, Inc., Regarding Pilgrim Nuclear Power Station License Renewal 2021-09-15
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 13, 2017 MEETING
SUMMARY
MN No.17-002 LICENSEE: ENTERGY NUCLEAR OPERATIONS, INC.
FACILITY: PILGRIM NUCLEAR POWER STATION
SUBJECT:
SUMMARY
OF PUBLIC MEETING On March 21, 2017, at 6:00 p.m., an annual assessment meeting and exit meeting for the supplemental inspection performed at Pilgrim Nuclear Power Station (Pilgrim), in accordance with Inspection Procedure 95003, was conducted at Plymouth Memorial Hall in Plymouth, Massachusetts, between the U.S. Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc. (Entergy). The NRC presented and discussed its assessment of the safety performance of Pilgrim for calendar year 2016, and NRC staff discussed their conclusions from the 95003 inspection performed as a result of the station entering into the Repetitive Degraded Cornerstone Column (Column 4) of the NRCs Reactor Oversight Process (ROP) Action Matrix.
The NRC presentation for the annual assessment meeting discussed the results of NRC's assessment of safety performance at Pilgrim for the period of January 1 through December 31, 2016, as documented in our letter dated March 1, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17059B917). Additional information relative to the NRCs Annual Assessment Process and the safety performance of Pilgrim can be found on the NRCs website at: https://www.nrc.gov/reactors/operating/oversight/actionmatrix-summary.html During the 95003 inspection exit portion of the meeting, NRC staff presented their assessment of the Pilgrim recovery plan for Column 4 performance. The NRC staff also posed questions to Entergy management regarding the actions they are taking to address these conclusions. As part of this meeting, Entergy presented its perspective regarding the plant's performance.
Copies of the slides presented by both the NRC and Entergy are included as enclosures to this meeting summary.
Further information regarding the additional NRC oversight at Pilgrim due to their Column 4 performance can be found on the NRCs website at: https://www.nrc.gov/info-finder/reactors/pilg/special-oversight.html Members of the public, local and State officials, and staffers representing local area congressional offices attended the meeting. At the end of the meeting between the NRC and Entergy, public attendees were offered the opportunity to ask questions of NRC officials or make statements. Several local and State representatives provided statements regarding the information presented at the meeting. Additionally, several prepared statements from U.S.
congressional offices were read by staffers at the meeting; copies of these prepared statements
2 are included as enclosures to this summary. Questions raised by members of the public were addressed by the NRC.
A transcript of this public meeting has been included as an enclosure to this meeting summary.
Feedback forms submitted by members of the public following the meeting will be evaluated.
The public meeting notice can be found in in ADAMS with Accession Number ML17069A094.
ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
______/RA/________________
Arthur L. Burritt, Chief Reactor Projects Branch 5 Division of Reactor Projects
Enclosures:
- 1. NRC Slides (ML17086A380)
- 2. Entergy Slides (ML17086A388)
- 3. Speaker Sign-Up Sheets (ML17101A412)
- 4. Meeting Transcript (ML17101A463)
- 5. Prepared statement from Congressman Keating (ML17101A399)
- 6. Prepared statement from Senator Warren (ML17100A848)
- 7. Prepared statement from Senator Markey (ML17093A599)
3
SUBJECT:
SUMMARY
OF PUBLIC MEETING DATED APRIL 13, 2017 DISTRIBUTION: (via email)
ABurritt, DRP DJackson, DRS CBickett, DRS LCline, DRP SHaney, DRP JVazquez, DRP PSmith, DRP ECarfang, DRP, SRI BPinson, DRP, RI RidsNRRPMPilgrim Resource DOCUMENT NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2016 EOC\PG 2017 AAM\Meeting Summary\PG 2017 AAM and 95003 Exit Meeting Summary.docx ADAMS Accession Number: ML17103A413 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME JVazquez/ABurritt for ABurritt DATE 4/13/17 4/13/17 OFFICIAL RECORD COPY