ML101110008
| ML101110008 | |
| Person / Time | |
|---|---|
| Site: | Indian Point, Pilgrim, Vermont Yankee, FitzPatrick |
| Issue date: | 04/21/2010 |
| From: | James Trapp Plant Support Branch 1 |
| To: | Balduzzi M Entergy Nuclear Northeast |
| Shared Package | |
| ML100820161 | List: |
| References | |
| EA-09-060 | |
| Download: ML101110008 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406*1415 Apr; 1 21, 2010 EA-09-060 Mr. Michael Balduzzi Senior Vice President, Regional Operations Entergy Nuclear Northeast 440 Hamilton Avenue White Plains, New York 10601
SUBJECT:
SUMMARY
OF THE APRIL 13, 2010, PUBLIC MEETING TO DISCUSS THE RESULTS OF ENTERGY NUCLEAR PLANT SAFETY CULTURE WORKPLACE SURVEY
Dear Mr. Balduzzi:
On April 13, 2010, the Nuclear Regulatory Commission (NRC) Ileld a Public Meeting at the Region I Office, located at 475 Allendale Road, King of Prussia.. Pennsylvania. The purpose of the meeting was for Entergy Nuclear Operations, Inc., to discuss the results of the Entergy safety culture workplace survey conducted in 2009 as specified in the NRC issued Confirmatory Order dated November 10, 2009.
Entergy provided an overview of the results of the 2009 Entergy safety culture workplace survey (Entergy slides can be viewed in the NRC ADAMS system ML100990031). Additionally, Entergy provided an overview of specific action plan focus ares,s that were developed for implementation at James A. FitzPatrick Nuclear Power Plant, Indian Point Energy Center, Pilgrim Nuclear Power Station, and Vermont Yankee Nuclear Power Station in response to the survey results.
Prior to the conclusion of the meeting, the NRC addressed public attendee questions.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, the attendance listing, and the Entergy presentation will be available electronically for
M. Balduzzi 2
public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).
Sincerely, James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.
50-247, 50-271, 50-286,50-293, 50-333 License Nos. DPR-26, DPR-28, DPR-64, DPR-35, DPR-59
Attachment:
Meeting Attendees cc: Distribution via ListServ
M. Balduzzi 2
public inspection in the NRC Public Document Room or from tile Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).
Sincerely, IRA!
James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.
50-247, 50-271, 50-286, 50-293, 50-333 License Nos. DPR-26, DPR-28, DPR-64, DPR-35, DPR-59 Attachments: Meeting Attendees cc: Distribution via ListServ SUNSI Review Complete:
DCJ (Reviewer's Initials)
ADAMS ACC #ML1011110008 DOCUMENT NAME: G:\\DRS\\Plant Support Branch 1\\DJohnson\\Entergy 4-13 Meeting Summary. doc After declaring this document "An Official Agency Record" it will be relea:sed to the Public.
To rece Ive a copy of this document, Ind'Icate In t he box: "C"- CoPY WI*thout attachmentJencIosure "E" = CoPY with attachmentIenclosure "N" " N0 copy OFFICE RIIDRS I
RI/DRP I
RIIDRP II RI/OE I
RI/DRS I
NAME DJohnson/DCJ MGray/MG DJacksonlTCS 'for MMcLaughlin/MM JTrapp/JMT DATE 04/19110 04/19/10 04/20/10 04/19/10 04/20/10 I
OFFICE I
I I
I I
NAME DATE OFFICIAL RECORD COPY
3 M. Balduzzi DISTRIBUTION:
S. Collins, RA (R10RAMAIL RESOURCE)
M. Dapas, DRA (R10RAMAIL RESOURCE)
D. Lew, DRP (R1 DRPMAIL RESOURCE)
J. Clifford, DRP (R1DRPMAIL RESOURCE)
D. Roberts, DRS (R1DRSMaii Resource)
P. Wilson, DRS (R1DRSMaii Resource)
L. Trocine. RI OEDO M. Gray, DRP B. Bickett, DRP S. McCarver, DRP M. Osbom. DRP E. Keighley, DRP B. Haagensen, Acting SRI A. Ayegbusi, DRP, RI D. Hochmuth, DRP D. Bearde, DRS RidsNrrPMlndianPoint Resource RidsNrrDorlLpl1-t Resource D. Jackson, DRP T. Setzer, DRP J. Heinly, DRP B. Sienel, DRP D. Spindler, DRP, SRI H. Jones, DRP, RI A. Rancourt, DRP, OA RidsNrrPMVermontYankee Resource RidsNrrDorlLl1-1 Resource P. Cataldo, SRI M. Halter, RI RidsNrrPMlndianPoint Resource RidsNrrDoriLp11-1 Resource M. Schneider, DRP, SRI B. Smith, DRP, RI A. Ford, DRP, Resident OA RidsNrrPMPilgrim Resource RidsNrrDorlLPL1-1 Resource G. Hunegs, DRP, SRI S. Rutenkroger,. DRP, RI K. Kolek, Resident OA RidsNrrPMFitzPatrick Resource RidsNrrDorlLpl1-1 Resource K. Farrar, ORA D. Holody, ORA M. McLaughlin, ORA J. Trapp, DRS D. Johnson, DRS OEMaii OEWeb
MEETING PRINCIPAL ATTENDEES April 13, 2010 Entergy Michael Balduzzi, Senior Vice President. Regional Operations John McCann, Vice President. Nuclear Safety, Emergency Planning. and Licensing Timothy Mitchell, Vice President, Engineering and Technical SI9rvices Joseph Pollock, Site Vice President, Indian Point Energy Centm Nuclear Regulatory Commission M. Dapas, Deputy Regional Administrator, RI D. Lew, Director, Division of Reactor Projects, RI D. Roberts. Director, Division of Reactor Safety, RI M. Gray, Chief, Branch 2, Division of Reactor Projects, RI D. Jackson, Chief, Branch 5, Division of Reactor Projects, RI J. Trapp, Chief, Plant Support Branch 1, Division of Reactor Sclfety, RI K. Farrar, Regional Counsel, RI M. McLaughlin, Senior Enforcement Specialist. RI