April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements
ML18107A497
Person / Time
Site: Palisades, Indian Point, Grand Gulf, Pilgrim, Arkansas Nuclear, River Bend, Vermont Yankee, Waterford, Big Rock Point, FitzPatrick  Entergy icon.png
Issue date: 04/27/2018
From: Jennivine Rankin
Plant Licensing Branch III
To:
Rankin J, NRC/NRR/DORL/LPLIII, 415-1530
References
EPID L-2018-LRM-0022
Download: ML18107A497 (4)


Text

LICENSEES:

FACILITIES:

SUBJECT:

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 27, 2018 Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant

SUMMARY

OF APRIL 10, 2017, PUBLIC MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC. REGARDING UPCOMING LICENSE AMENDMENT REQUEST TO ADD SETPOINT VERIFICATION REQUIREMENT TO TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT (EPID: L-2018-LRM-0022)

On April 10, 2018, a Category 1 public teleconference meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Entergy Nuclear Operations, Inc. (the licensee). The purpose of the meeting was to discuss an upcoming license amendment request (LAR) to add a setpoint verification requirement to technical specification (TS) surveillance requirement (SR) 3.3.5.2a.

The licensee's presentation is available at ADAMS Accession No. ML18107A334.

The licensee stated that the existing TS SR is non-conservative and that the proposed LAR would resolve the issue. Specifically, the current TS SR include verifications of voltage setpoint and built-in time delay of the second-level undervoltage (degraded) relay that starts the associated emergency diesel generator, but does not include verification of the setpoint for the separate time delay relay that prevents inadvertent shedding of bus loads. The licensee discussed the function and settings of the separate time delay relay which would be included in the proposed revised TS SR to show the setpoints. The licensee stated that the proposed LAR would include a summary of calculations that would support the new time delay settings.

The NRG staff asked clarification questions regarding the amount of detail to be provided in the calculations. The licensee stated the summary of calculations would include the voltage variations on the safety-related 2400 volt buses and how the voltages during sequencing of safety-related loads would recover above the degraded voltage relay setpoint, and the details of relay accuracy/tolerances, etc. In addition, the NRC staff noted that any differences in the calculated setpoints and the proposed TS SR setpoints should be discussed in the proposed LAR.

The licensee expects to submit the LAR by the end of April 2018.

No regulatory decisions or commitments were made during the meeting. There were not any members of the public participating in the teleconference meeting and no public meeting feedback forms were received.

A list of meeting attendees is enclosed.

Please direct any inquiries to me at 301-415-1530, or Jennivine.Rankin@nrc.gov.

Docket No. 50-255

Enclosure:

List of Attendees cc: Listserv ivine K.

ankin, ProJec anager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

LIST OF ATTENDEES APRIL 10, 2018, PUBLIC TELECONFERENCE MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC.

PALISADES NUCLEAR PLANT NAME ORGANIZATION Jennie Rankin NRC/NRR/DORL Vijay Goel NRC/NRR/DE Gursharan Singh NRC/NRR/DE

.Matthew Hamm NRC/NRR/DSS Viktoria Mitlyng NRG/Region Ill April Nguyen NRG/Region Ill Jeff Erickson Entergy/Palisades Jim Miksa Entergy/Palisades Kirk Cramer Entergy/Palisades Tom Swiecicki Entergy/Palisades Rich Moceri Entergy/Palisades Enclosure

Package ML18107A575 Meeting Notice ML18080A026 Handouts ML18107A334 Summary ML18107A497 OFFICE NRR/D0RL/LPL3/PM NAME JRankin DATE 4/23/18 RidsNrrPMPalisades Resource RidsRgn3MailCenter Resource TWertz, NRR GSingh, NRR VGoel, NRR MHamm, NRR N RR/D0RL/LPL3/LA NRR/D0RL/LPL3 NRR/D0RL/LPL3/PM SRohrer DWrona JRankin 4/23/18 4/27/18 4/27/18