Category:Meeting Summary
MONTHYEARML21257A3822021-09-15015 September 2021 Summary of Clarification Cal with Holtec Decommissioning International, Llc. Regarding Second Follow-On Emergency Preparedness Request for Additional Information ML21238A2752021-08-26026 August 2021 Clarification Call Regarding RAI License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Plan ML21075A3152021-03-17017 March 2021 March 11,2021 Pilgrim Request for Additional Information Response Clarifiction Meeting - Proposed Physical Security Plan ML21035A2312021-02-18018 February 2021 Physical Security Plan - RAI Clarification Meeting ML21035A1712021-02-18018 February 2021 Physical Security Plan - ISFSI Only Meeting Summary ML20045D1082020-02-19019 February 2020 January 31, 2020 Meeting Summary Pre-Amendment Meeting Proposed Changes to Pilgrim ISFSI Physical Security Plan ML19274B6662019-11-13013 November 2019 Summary of Public Meeting Near the Pilgrim Nuclear Power Station Regarding the Establishment and Operation of Community Advisory Boards ML19121A2172019-04-30030 April 2019 Annual Assessment Meeting for Pilgrim Nuclear Power Station - Meeting Summary ML19017A1732019-01-30030 January 2019 Summary of 1/15/2019 Public Meeting Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report, Which Includes the Site-Specific Decommissioning Cost Estimate ML18275A3952018-10-12012 October 2018 9/25/2018 Summary of Pre-submittal Meeting with Entergy Nuclear and Holtec International to Discuss Potential License Transfer Application for Pilgrim Nuclear Power Plant ML18130A1592018-05-0909 May 2018 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML17173A7672017-07-28028 July 2017 Summary of 6/20/2017 Meeting with Entergy to Discuss Plan for Decommissioning Licensing Actions of Palisades, Pilgrim, Indian Point, Units 2 and 3, and Vermont Yankee ML17101A3992017-04-13013 April 2017 Statement of Congressman Keating - NRC Annual Assessment Meeting for PNPS - March 21, 2017 ML17103A4132017-04-13013 April 2017 3/21/2017 - Annual Assessment/95003 Inspection Exit Summary Meeting for Pilgrim Nuclear Power Station ML17059C9192017-02-28028 February 2017 1/31/2017 - Summary of Category 3 Public Meeting - Preliminary Findings and Status of 95003 Inspection at Pilgrim ML16116A0052016-04-22022 April 2016 4/13/2016 - Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station ML15306A0122015-11-0505 November 2015 Summary of October 20, 2015, Teleconference with Entergy Nuclear Operations to Discuss Proposed Changes to Emergency Response Organization Training for Pilgrim Nuclear Power Station ML15092A7932015-04-0202 April 2015 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 3/18/15 ML14136A3502014-05-14014 May 2014 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 5/1/2014 (W/Nrc Presentation Slides) ML14086A2912014-04-22022 April 2014 Summary of Telephone Conference Regarding the Verbal Authorization of Relief Request PRR-25, Revision 1 ML13109A4362013-04-19019 April 2013 4/2/2013 - Pilgrim - Annual Assessment Meeting Summary ML12101A3742012-04-10010 April 2012 Summary of Meeting with Pilgrim Nuclear Power Station 2011 Annual Assessment ML11292A1612011-10-20020 October 2011 Summary of Meeting with Beyond Nuclear Regarding Their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors ML1118105332011-06-30030 June 2011 Summary of Annual Assessment Public Meeting with Entergy Nuclear Operation, Inc ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML11166A1342011-06-22022 June 2011 Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs) ML1110401712011-04-27027 April 2011 04/5/2011 Summary of Preapplication Meeting with Entergy Operations, Inc. to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1108206892011-04-19019 April 2011 February 24, 2011, Summary of Telephone Conference Call Held Between NRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1109700342011-04-19019 April 2011 Summary of Tele Conf Call Held on 4/6/11, Between the USNRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1108202082011-04-11011 April 2011 Summary of Telephone Conference Call Held on March 23, 2011, Between the USNRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1100404192011-02-15015 February 2011 Summary of Telephone Conference Call Held on December 6, 2010, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operating, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application (Tac No. MC9669) ML1034105062011-01-0707 January 2011 December 1, 2010, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1025900772010-10-15015 October 2010 Summary of Telephone Conference Call Held on 6/2/10 Btw the USNRC and Entergy Nuclear Operations, Inc. Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1025900862010-10-15015 October 2010 5/25/10 Summary of Telephone Conference Call Held Between USNRC and Entergy Nuclear Operations, Inc. Concerning the Annual Update Associated with the Pilgrim Nuclear Power Station License Renewal Application ML1012603632010-05-0606 May 2010 Summary of Annual Assessment Open House Public Meeting Discussed Nrc'S Assessment of Safety Performance of Pilgrim for Cy 2009 ML1011100082010-04-21021 April 2010 Summary of Public Meeting to Discuss the Results of Entergy Nuclear Plant Safety Culture Workplace Survey ML0909702992009-04-13013 April 2009 Annual Assessment Meeting Summary, Slides, Sign-in Sheet, Misc Documents, for 3/26/09 Meeting ML0809202432008-04-0101 April 2008 Summary of March 28, 2008, Annual Assessment Meeting with Entergy Nuclear Operations, Inc ML0724302642007-09-0707 September 2007 08/30/2007 Summary of Telephone Conference Call Between the U.S. NRC and Entergy Nuclear Operations, Inc., to Discuss and Clarify Commitment No. 47 Pertaining to the Pilgrim Nuclear Power Station License Renewal Application ML0713701422007-05-18018 May 2007 Summary of Annual Assessment Meeting with Entergy Nuclear Operations, Inc., Regarding the Nrc'S Assessment of the Safety Performance of Pilgrim Nuclear for the Calendar Year 2006 ML0710300932007-05-0101 May 2007 03/14-15/2007 Summary of Conference Calls with Entergy Nuclear Operations Inc., Pilgrim License Renewal Application, Pilgrim Request for Additional Information B.1.16.1, and Neutron Fluence ML0710300532007-04-27027 April 2007 Summary of Conference Calls on April 2, 2007, with Entergy Nuclear Operations, Inc., Regarding the Pilgrim License Renewal Application ML0710300482007-03-19019 March 2007 E-mail: (PD) Meeting Summary - March 14 & 15 2007 - from Perry Buckberg to Doug Ellis 3/19/07 7:05am ML0706005672007-03-15015 March 2007 Summary of the License Renewal Telephone Conference Call and Meeting Held Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute License Renewal Task Force ML0710302212007-03-0707 March 2007 E-MAIL: (PD) Updated - Week of 2/26 Conference Call Record from Perry Buckberg to Doug Ellis 3/7/07 6:36am ML0705402052007-03-0101 March 2007 01/24/2007 Summary of Meeting with Pilgrim on the Draft Supplemental Environmental Impact Statement Regarding Pilgrim License Renewal Review ML0635400102007-01-18018 January 2007 12/18/2006 Summary of Conference Call with Entergy Nucelar Operations, Inc., Regarding the Pilgrim License Renewal Application ML0634800532006-12-29029 December 2006 2006/12/29-Summary of Conference Call on December 12, 2006, with Entergy Nuclear Operations, Inc., Regarding Pilgrim Nuclear Power Station License Renewal 2021-09-15
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23113A0232023-04-11011 April 2023 NRC Presentation: Overview of Pilgrim Liquid Discharge Considerations for the North Atlantic Right Whale Recovery Plan Northeast U.S. Implementation Team (Neit) ML22227A0742022-08-10010 August 2022 Overview of Pilgrim Liquid Discharge Considerations NOAA ML22124A3012022-04-25025 April 2022 Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022 ML22088A2172022-03-16016 March 2022 Liquid Effluent Discharge Presentation ML20045D1092020-01-31031 January 2020 PSP Pre-Submittal Meeting Jan 31 2020 Hdi ML19248C2392019-09-11011 September 2019 NEIMA Section 108 Public Meeting Slides - Pilgrim September 11, 2019 ML19119A0882019-04-29029 April 2019 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML19009A3432019-01-15015 January 2019 Holtec Slides PSDAR Meeting 1-15-19 ML19008A4942019-01-15015 January 2019 Post-Shutdown Decommissioning Activities Report - NRC Presentation at Public Meeting on January 15, 2019 ML18262A1352018-09-25025 September 2018 NRC License Transfer Application 9/25/2018 Pre-Submittal Meeting Presentation Slides ML18127A0282018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML18127A0272018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18075A1232018-03-20020 March 2018 Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations ML17296A2162017-10-18018 October 2017 Presentations on Reactor Decommissioning at Ma Ndcap at Plymouth Ma Public Meeting Oct 18, 2017 ML17191A7872017-07-13013 July 2017 Regulatory Conference Presentation 07-13-17 ML17086A3802017-03-21021 March 2017 3/21/2017 - Annual Assessment & IP 95003 Exit Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML17086A3882017-03-21021 March 2017 3/21/2017 - Annual Assessment & 95003 Exit Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML16112A1562016-04-13013 April 2016 4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - Entergy Presentation Slides ML16111A8892016-04-13013 April 2016 4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - NRC Presentation Slides ML15292A0132015-10-20020 October 2015 ERO Staffing and Training Teleconference with NRC Staff ML15208A4602015-07-0808 July 2015 Slides of Regulatory Conference for July 8, 2015 ML15084A0532015-03-18018 March 2015 3/18/2015 - Pilgrim 2014 Annual Assessment Meeting - NRC Presentation (w/95002 Inspection Results) ML14136A3502014-05-14014 May 2014 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 5/1/2014 (W/Nrc Presentation Slides) ML14015A1702013-12-12012 December 2013 Pilgrim Dry Cask Presentation - Dec. 12, 2013 ML14006A2732013-12-12012 December 2013 NRC Webinar Dry Cask Storage of Nuclear Fuel at Pilgrim Nuclear Power Plant ML13130A1542013-05-10010 May 2013 Slides for ISFSI Briefing for Town of Plymouth ML13130A1232013-05-10010 May 2013 2012 Annual Assessment Meeting Slides ML12262A3282012-09-13013 September 2012 9/13/2012 Pilgrim Watch Final Presentation NUREG-0654 Public Mtg ML12101A2852012-04-10010 April 2012 Annual Assessment Meeting Slides ML11188A0192011-07-0606 July 2011 NRC Meeting with NEI Workshop June 28-29, 2011 Enhancements ML1118105122011-06-30030 June 2011 Aam Slides ML0909702992009-04-13013 April 2009 Annual Assessment Meeting Summary, Slides, Sign-in Sheet, Misc Documents, for 3/26/09 Meeting ML0906906982009-03-20020 March 2009 NRC Presentation Slides for Pilgrim Nuclear Power Plant Annual Assessment Meeting to Be Held 3/26/09 ML0807011352008-03-10010 March 2008 Slides for the Pilgrim Station Annual Assessment Meeting CY2007 - ROP8 - 03/26/2008 ML0731902202007-11-0707 November 2007 Meeting Handout Fitzpatrick GNF2 Introduction at Entergy ML0726400222007-09-0606 September 2007 License Renewal ACRS Full Committee Brief of September 6, 2007 ML0712807662007-04-26026 April 2007 E-mail: (NPA-PD) Link to Rutgers Slides on Wrf Calcs - Pilgrim ML0710102652007-04-11011 April 2007 Slides for 2006 Annual Assessment Meeting, NRC Annual Performance Assessment of Pilgrim ML0705106742007-02-21021 February 2007 NMC Slides for Public Meeting, Conduct of Operations Action Plan Update. ML0704403232007-01-30030 January 2007 License Renewal Inspection Exit Meeting Slides ML0704304762007-01-30030 January 2007 License Renewal Inspection Exit Meeting - Slides with Notes ML0703305622007-01-24024 January 2007 Dseis Meeting Presentation, Preliminary Results of Environmental Review Pilgrim Nuclear Power Station ML0715700492007-01-16016 January 2007 Budget Presentation,Town of Plymouth Fiscal Year 2008 Budget Primer. ML0634800262006-12-0606 December 2006 Drop-In Visit (Entergy) Slides ML0609404082006-04-0404 April 2006 NRC Slides for Annual Assessment Public Meeting with Entergy (Pilgrim Station) Reference CY2005 Performance ML0617802712006-03-0707 March 2006 RIC 2006 Presentation - T2E - Vincent Coulehan - Use of Operating Experience (Regulator/Operator/Licensee) ML0615902322006-03-0707 March 2006 2006/03/07- - RIC 2006 Presentation - T1F - Garry G. Young - License Renewal ML0615901582006-03-0707 March 2006 03/07/2006 - RIC 2006 Presentation - T1E - John F. Mccann - License Renewal ML0632802522005-07-18018 July 2005 Briefing Slides for 07/18/2005, Pilgrim Station Force-on-Force Inspection 2023-04-11
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 April 16, 2009 LICENSEE: ENTERGY NUCLEAR OPERATIONS, INC.
FACILITY: PILGRIM NUCLEAR POWER STATION
SUBJECT:
SUMMARY
OF MARCH 26, 2009 ANNUAL ASSESSMENT MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC.
On March 26, from 6:00 pm to 10:30 pm, an Annual Assessment Meeting was conducted at the Hilton Garden Inn in Plymouth, Massachusetts, between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc. (Entergy). The NRC requested the meeting with Entergy management to discuss the NRC=s assessment of the safety performance of Pilgrim Nuclear Power Station for the calendar year 2008.
The NRC presented and discussed its assessment of the safety performance of Pilgrim for the period between January 1 through December 31, 2008. The NRC presentation included information on the Reactor Oversight Process (ROP), summary of national performance assessment results, and the results of NRC=s performance assessment for Pilgrim. As part of this regulatory performance meeting, Entergy presented its perspective regarding the plant=s performance and operational goals for 2009.
The public was invited to observe this meeting. Prior to the meeting the public was invited to speak one on one with the resident inspectors and regional staff and at the end of the meeting between the NRC and Entergy, public attendees were offered the opportunity to communicate with the NRC regarding Entergy=s performance at Pilgrim and the role of the agency in ensuring safe plant operations. Questions from the public and the local media were also addressed by the NRC.
The NRC=s assessment letter can be found in ADAMS with an Accession Number of ML090630507. The annual assessment meeting notice with the attached meeting agenda can be found in ADAMS package ML090630474. The NRC slides can be located in ADAMS with an Accession Number of ML090970243. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Mel Gray, Chief Projects Branch 2 Division of Reactor Projects
2
Enclosures:
Meeting Attendees Public Meeting Sign in Sheet NRC Slides LIST OF ATTENDEES PILGRIM NUCLEAR POWER STATION ANNUAL ASSESSMENT MEETING MARCH 26, 2009 Name Organization Mel Gray Nuclear Regulatory Commission (NRC)
Don Jackson Nuclear Regulatory Commission (NRC)
Max Schneider Nuclear Regulatory Commission (NRC)
Brian Smith Nuclear Regulatory Commission (NRC)
Andrew Rosebrook Nuclear Regulatory Commission (NRC)
Sarah Rich Nuclear Regulatory Commission (NRC)
Kevin Bronson Entergy Nuclear Operations, Inc.
Bob Smith Entergy Nuclear Operations, Inc.
Steve Bethay Entergy Nuclear Operations, Inc.
Brian Sullivan Entergy Nuclear Operations, Inc.
Mary Lampert Duxbury Nuclear Advisory Committee Rebecca Chin Duxbury Nuclear Advisory Committee Richard Rothstein Plymouth Nuclear Matters Committee Lauren Mauriello Massachusetts Affordable Reliable Electricity Alliance (AREA)
Members of the Public on Sign-in Sheet.
April 16, 2009 LICENSEE: ENTERGY NUCLEAR OPERATIONS, INC.
FACILITY: PILGRIM NUCLEAR POWER STATION
SUBJECT:
SUMMARY
OF MARCH 26, 2009 ANNUAL ASSESSMENT MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC.
On March 26, from 6:00 pm to 10:30 pm, an Annual Assessment Meeting was conducted at the Hilton Garden Inn in Plymouth, Massachusetts, between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc. (Entergy). The NRC requested the meeting with Entergy management to discuss the NRC=s assessment of the safety performance of Pilgrim Nuclear Power Station for the calendar year 2008.
The NRC presented and discussed its assessment of the safety performance of Pilgrim for the period between January 1 through December 31, 2008. The NRC presentation included information on the Reactor Oversight Process (ROP), summary of national performance assessment results, and the results of NRC=s performance assessment for Pilgrim. As part of this regulatory performance meeting, Entergy presented its perspective regarding the plant=s performance and operational goals for 2009.
The public was invited to observe this meeting. Prior to the meeting the public was invited to speak one on one with the resident inspectors and regional staff and at the end of the meeting between the NRC and Entergy, public attendees were offered the opportunity to communicate with the NRC regarding Entergy=s performance at Pilgrim and the role of the agency in ensuring safe plant operations. Questions from the public and the local media were also addressed by the NRC.
The NRC=s assessment letter can be found in ADAMS with an Accession Number of ML090630507. The annual assessment meeting notice with the attached meeting agenda can be found in ADAMS package ML090630474. The NRC slides can be located in ADAMS with an Accession Number of ML090970243. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html Sincerely,
/RA/
Mel Gray, Chief Projects Branch 2 Division of Reactor Projects Distribution J. Clifford, DRP Schneider, DRP, SRI S. Collilns, RA M. Gray, DRP B. Smith, DRP, RI M. Dapas, DRA B. Brickett, DRP A. Ford, DRP, OA D. Lew, DRP A. Rosebrook, DRPM.
SUNSI Review Complete: bb (Reviewer=s Initials)
DOCUMENT NAME: G:\DRP\BRANCH2\Meetings\2009 Annual Assessment Meetings\Pilgrim\Pilgrim 2008 Annual Assessment Meeting Summary.doc After declaring this document AAn Official Agency Record@ it will be released to the Public. ML090970299 To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE R1/DRP R1/DRP NAME ARosebrook/AAR* MGray/mxg*
DATE 04/07/09 04/16/09
- See prior concurrence OFFICIAL RECORD COPY PILGRIM Annual Assessment Meeting 2008 Reactor Oversight Process Nuclear Regulatory Commission - Region I
Purpose of Todays Meeting
- Discuss the Pilgrim Nuclear Power Stations safety performance for 2008
- Provide Entergy the opportunity to respond to the NRCs annual performance assessment and to discuss their actions to maintain or improve performance
- Provide stakeholders the opportunity to address questions to the NRC staff regarding Pilgrim plant performance and our role in ensuring safe plant operations 2
Agenda
- NRC Organization and Performance Goals
- Reactor Oversight Process (ROP)
- National Summary of Plant Performance
- NRC Assessment of Pilgrims Performance
- Entergys Response and Remarks
- NRC available to address public questions 3
Region I Organization Samuel J. Collins Regional Administrator Marc L. Dapas Deputy Regional Administrator Division of Reactor Safety Division of Reactor Projects Division of Nuclear Materials Safety Darrell J. Roberts, Director David C. Lew, Director John D. Kinneman, Director Eugene W. Cobey, Deputy Director James W. Clifford, Deputy Director Daniel S. Collins, Deputy Director Mel Gray Regional Specialists Regional Specialists Branch 2 Chief Project Engineers Pilgrim Resident Inspection Staff Andrew Rosebrook, Senior Project Engineer Max Schneider, Senior Resident Inspector Brice Bickett, Senior Project Engineer Brian Smith, Resident Inspector Sammy McCarver, Project Engineer 4
NRC Strategic Plan Goals Safety: Ensure adequate protection of public health and safety and the environment Security: Ensure adequate protection in the secure use and management of radioactive materials 5
Reactor Oversight Process 3 Strategic Areas & 7 Cornerstones Reactor Radiation Safeguards Safety Safety Public Occupational Initiating Mitigating Barrier Emergency Physical Radiation Radiation Events Systems Integrity Preparedness Protection Safety Safety 6
Reactor Oversight Process S tra te g ic P e rfo r m a n c e A re a s S a fety C o rn e r s to n e s B a s e lin e In s p e c tio n P e r fo r m a n c e In d ic a to r R e s u lts R e s u lts S ig n ific a n c e S ig n ific a n c e T h r e s h o ld T h r e s h o ld A c tio n M a tr ix R e g u la to ry R e s p o n s e 7
Examples of Baseline Inspection Areas
- Corrective Action Program
Performance Indicators Occupational RETS/ODCM Unplanned Emergency AC RCS Specific Drill/Exercise Security Exposure Control Radiological Scrams (G) Power System (G) Activity (G) Performance (G) (Not Public)
Effectiveness (G) Effluent (G)
Unplanned High Pressure ERO Drill Scrams with Injection System RCS Leakage (G)
Participation (G)
Complications (G) (G)
Residual Heat Alert and Unplanned Power Removal System Notification Changes (G)
(G) System (G)
Heat Removal System (G)
Cooling Water Systems (G)
Safety System Functional Failures (G) 9
Significance Threshold Performance Indicators Green Baseline Inspection White Requires NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Inspection Findings Green Very low safety issue White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue 10
Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone
- Increasing Safety Significance
- Increasing NRC Inspection Efforts
- Increasing NRC/Licensee Management Involvement
- Increasing Regulatory Actions 11
National Summary of Plant Performance (at end of 2008)
Licensee Response 86 Regulatory Response 14 Degraded Cornerstone 3 Multiple/Repetitive Degraded Cornerstone 1 Unacceptable 0 Total 104 12
National Summary of Plant Performance (at end of 2008)
Performance Indicator Results Green 1762 White 6 Yellow 0 Red 0 Total Inspection Findings Green 776 White 17 Yellow 0 Red 0 13
NRC Inspection Activities at Pilgrim (for 2008)
- Over 5200 hours0.0602 days <br />1.444 hours <br />0.0086 weeks <br />0.00198 months <br /> of inspection and related activities
- 2 resident inspectors on-site
- 4 major team inspections:
Component Design Basis Inspection Emergency Preparedness Evaluated Exercise Two Physical Security Team Inspections 14
NRC Annual Assessment Summary Pilgrim
- Entergy operated the plant safely and in a manner that preserved public health and safety and protected the environment
- Pilgrim was in the Licensee Response column of the NRCs Action Matrix for the last quarter of 2008 15
Pilgrim PIs / Findings (January 1 - December 31, 2008)
- All Green Performance Indicators
- 14 Green inspection findings 16
NRC Inspection Findings Pilgrim
- Examples of Green Findings in 2008
- 2 Green findings related to inadequate risk assessment for emergent maintenance on risk significant equipment.
- 2 Green findings related inadequate corrective actions due to an improper evaluation of a condition adverse to quality.
- 1 Green finding related to an improperly revised Reactor Core Isolation Cooling System procedure.
17
NRC Assessment of Pilgrim
- The staff identified four inspection findings with a cross-cutting aspect of document and procedure adequacy.
- The staff determined that Entergy had recognized the cross-cutting theme and had taken or scheduled to take appropriate corrective actions.
- The NRC will monitor Entergys progress in the area of procedure adequacy through the baseline inspection program.
18
NRC Annual Assessment Summary Pilgrim
- Pilgrim was in the Licensee Response column of the NRCs Action Matrix for 2008.
- All cornerstone objectives were fully met.
- NRC plans baseline inspections at Pilgrim for the remainder of 2009.
19
Licensee Response and Remarks Kevin Bronson Pilgrim Site Vice President Entergy Nuclear Operations, LLC 20
Contacting the NRC
(800) 695-7403 Allegation@nrc.gov
- General information or questions:
www.nrc.gov Select News and Information for a link to email Public Affairs 21
NRC Representatives
- David C. Lew, Division Director, DRP 610-337-5229
- James W. Clifford, Deputy Division Director, DRP 610-337-5080
- Max Schneider, Senior Resident Inspector 508-747-0565
Reference Sources Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Public Electronic Reading Room http://www.nrc.gov/reading-rm.html Public Document Room 1-800-397-4209 (Toll Free) 23
End of the Presentation Nuclear Regulatory Commission Region I King of Prussia, Pennsylvania March 26, 2009