2006/10/23-Summary of Conference Call on October 10, 2006 with Entergy Nuclear Operations. Inc., to Clarify Information Sent to the NRC in Response to Requests for Additional Information Regarding the Pilgrim License Renewal Application
ML062850407
Person / Time
Site: Pilgrim
Issue date: 10/23/2006
From: Perry Buckberg
NRC/NRR/ADRO/DLR/RLRA
To:
Entergy Nuclear Operations
Buckberg, P., PM, RLRA, 415-1383
References
%dam200612, TAC MC9669
Download: ML062850407 (7)


Text

October 23, 2006LICENSEE:Entergy Nuclear Operations, Inc.FACILITY:Pilgrim Nuclear Power Station

SUBJECT:

SUMMARY

OF CONFERENCE CALL ON OCTOBER 10, 2006, WITHENTERGY NUCLEAR OPERATIONS, INC., TO CLARIFY INFORMATION SENT TO THE NUCLEAR REGULATORY COMMISSION IN RESPONSE TO REQUESTS FOR ADDITIONAL INFORMATION REGARDING THE PILGRIM LICENSE RENEWAL APPLICATION (TAC NO. MC9669)The U.S. Nuclear Regulatory Commission (NRC) staff conducted a conference call with EntergyNuclear Operations, Inc. (Entergy or the applicant) regarding the Pilgrim license renewal application (LRA) to discuss information noted by the NRC's Pilgrim Audit Team, and to clarify information sent to the NRC in response to requests for additional information (RAI). The conference call was conducted on Tuesday, October 10, 2006, between 11:00 p.m. and 11:30 p.m. at 11555 Rockville Pike, Rockville, MD 20852. The list of participants is shown in the enclosure. The following is a summary of the conference call:The NRC Project Manager provided an introduction and said that two issues discussed in theSeptember 6, 2006, Pilgrim conference call would be included in a pending conference call summary letter, that responses received by the NRC to RAIs 2.3.3.9-1 and 2.3.3.9-8 were not considered complete and that the response to RAI B.1.3-1 required clarification. On September 6, 2006, the NRC requested Entergy provide neutron fluence data in the form of the TransWare report (demonstrating the level of adherence to the limitations to the Radiation Analysis and Modeling Application code), this was not addressed in Pilgrim LRA Amendment 9.

NRC also requested changes be made to LRA Table 2.5-1 including the addition of Non-Environmental Qualification (EQ) electrical penetrations, Non-EQ electrical penetrations were not addressed in Pilgrim LRA Amendment 9. Discussion of RAIs, 2.3.3.9-1 and 2.3.3.9-8, resulted in the Entergy action to provide NRC the applicant's commitment to satisfy Appendix A to Branch Technical Position Auxiliary and Power Conversion Systems Branch 9.5-1. Discussion of RAI B.1.3-1 resulted in Entergy reiterating that it will follow the Boiling Water Reactor Vessel and Interal Program -75 guidelines (originally proposed in the LRA) with regard to the capped control rod drive return line nozzle. The applicant had an opportunity to comment on the meeting summary./RA/Perry Buckberg, Project ManagerLicense Renewal Branch A Division of License Renewal Office of Nuclear Reactor RegulationDocket No. 50-293

Enclosure:

List of Participantscc w/encl: See next page

ML062850407OFFICEPM:RLRA:DLRLA:DLRPM:RLRC:DLRBC:RLRA:DLRNAMEPBuckbergSFigueroaJDavisLLund DATE10/23/0610/17/0610/19/0610/19/06 Conference Call Summary dated October 23, 2006

SUBJECT:

SUMMARY

OF CONFERENCE CALL ON OCTOBER 10, 2006, WITHENTERGY NUCLEAR OPERATIONS, INC., TO CLARIFY INFORMATION SENT TO THE NUCLEAR REGULATORY COMMISSION IN RESPONSE TO REQUESTS FOR ADDITIONAL INFORMATION REGARDING THE PILGRIM LICENSE RENEWAL APPLICATION (TAC NO. MC9669)HARD COPYDLR R/FE-MAIL: JFairRWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)

SDuraiswamy YL (Renee) Li RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva

RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff


PBuckberg SHoffman SUttal JShea JDavis CAnderson, Region 1 WRaymond, Region 1 NSheehan, Region 1 Pilgrim Nuclear Power Station cc:Regional Administrator, Region IU. S. Nuclear Regulatory Commission

475 Allendale Road King of Prussia, PA 19406-1415Senior Resident InspectorU. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360Chairman, Board of Selectmen11 Lincoln Street Plymouth, MA 02360ChairmanNuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360Chairman, Duxbury Board of SelectmenTown Hall 878 Tremont Street Duxbury, MA 02332Office of the CommissionerMassachusetts Department of Environmental Protection One Winter Street Boston, MA 02108Office of the Attorney GeneralOne Ashburton Place 20th Floor Boston, MA 02108MA Department of Public HealthRadiation Control Program Schrafft Center, Suite 1M2A 529 Main Street Charlestown, MA 02129Secretary of Public SafetyExecutive Office of Public Safety One Ashburton Place Boston, MA 02108 Director, Massachusetts Emergency Management Agency Attn: James Muckerheide 400 Worcester Road Framingham, MA 01702-5399Mr. William D. MeinertNuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056-0426Mr. Michael A. BalduzziSite Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508Mr. Stephen J. BethayDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508Mr. Bryan S. FordManager, Licensing Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Pilgrim Nuclear Power Station cc:

Mr. John T. HerronSr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Oscar LimpiasVice President, Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Christopher SchwarzVice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCannDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Ms. Charlene D. FaisonManager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Michael D. Lyster5931 Barclay Lane Naples, FL 34110-7306Mr. Michael J. ColombDirector of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Ms. Stacey LousteauTreasury Department Entergy Services, Inc.

639 Loyola Avenue New Orleans, LA 70113Mr. James Sniezek5486 Nithsdale Drive Salisbury, MD 21801Mr. Travis C. McCulloughAssistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. James RossNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708Plymouth Public LibraryAttn: Dinah O'Brien 132 South Street Plymouth, MA 02360Duxbury Free LibraryATTN: Ms. Elaine Winquist 77 Alden Street Duxbury, MA 02332

Kingston Public Library ATTN: Reference Librarian 6 Green Street Kingston, MA 02364Ms. Mary LampertDuxbury Nuclear Advisory, Chair Pilgrim Watch, Director 148 Washington Street Duxbury, MA 02332 LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALL TO DISCUSS THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATIONOctober 10, 2006PARTICIPANTSAFFILIATIONPerry BuckbergU.S. Nuclear Regulatory Commission (NRC)Raj AuluckNRC Ganesh CheruvenkiNRC Naeem IqbalNRC Doug EllisEntergy Nuclear Operations, Inc. (Entergy)

Fred MogoleskoEntergy Alan CoxEntergy Andy Taylor Entergy Lori Potts Entergy Ted IvyEntergy David Lach Entergy Steve Burke EntergyENCLOSURE