Nuclear Regulatory Commissions Analysis of Entergy Nuclear Operations, Inc. Decommissioning Funding Status Report for Indian Point Nuclear Generating Station, Units 1, 2 & 3; and Pilgrim Nuclear Power Station
ML12137A060
Person / Time
Site: Indian Point, Pilgrim  Entergy icon.png
Issue date: 05/29/2012
From: Christopher Regan
Division of Inspection and Regional Support
To: George Wilson
Plant Licensing Branch 1
Dusaniwskyj M
Shared Package
ML12137A040 List:
References
TAC ME8371, TAC ME8372, TAC ME8373, FOIA/PA-2013-0151
Download: ML12137A060 (4)


Text

May 29, 2012 MEMORANDUM TO:

George A. Wilson, Chief Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:

Christopher M. Regan, Chief /RA/

Financial Analysis and International Projects Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation

SUBJECT:

NUCLEAR REGULATORY COMMISSIONS ANALYSIS OF ENTERGY NUCLEAR OPERATIONS, INC. DECOMMISSIONING FUNDING STATUS REPORT FOR INDIAN POINT NUCLEAR GENERATING STATION, UNITS 1, 2 & 3; AND PILGRIM NUCLEAR POWER STATION (TACs ME8371, ME8372, ME8373)

Enclosed is the subject staffs analysis of Entergy Nuclear Operations, Inc. (Entergy) 2012 Decommissioning Funding Status reports for Indian Point Nuclear Generating Station, Units 1, 2 & 3, and Pilgrim Nuclear Power from the Financial Analysis and International Projects Branch (IFIB). Enclosure 1 includes a proposed close-out letter describing the results of the IFIB staffs review to be sent to Entergy. Enclosures 2 through 5 are the IFIB staff analysis spreadsheets of Indian Point Nuclear Generating Station, Units 1, 2 & 3, and Pilgrim Nuclear Power Station, which should be enclosed with the close-out letter. This action closes the TAC numbers listed above.

Docket Nos. 50-3, 50-247 50-286, 50-293

Enclosures:

As stated CONTACT: Michael A. Dusaniwskyj, NRR/DIRS 301-415-1260

ML12137A040 (Pkg.); ML12137A060 (Memo); ML12137A090 (Indian 1);

ML12137A105 (Indian 2); ML12137A136 (Indian 3); ML12137A165 (Pilgrim)

OFFICE NRR/DIRS NRR/DIRS NRR/DIRS NAME MDusaniwskyj SHarwell CRegan DATE 5/16/2012 5/16/2012 5/29/2012

[Licensee Officer Name]

[Licensee Title]

[Licensee Address]

SUBJECT:

NRCS ANALYSIS OF ENTERGY NUCLEAR OPERATIONS, INC.

DECOMMISSIONING FUNDING STATUS REPORT FOR INDIAN POINT NUCLEAR GENERATING STATION, UNITS 1, 2 & 3; AND PILGRIM NUCLEAR POWER STATION

Dear [Licensees Officers Name]:

On March 30, 2012, the U.S. Nuclear Regulatory Commission (NRC) received your decommissioning funding status (DFS) report (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12093A382) for Indian Point Nuclear Generating Station, Units 1, 2, & 3, and Pilgrim Nuclear Power Station, (together the facilities).

Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.75(f)(1), all power reactor licensees are required to submit a DFS report at least once every 2 years in order for the NRC to obtain the information necessary to monitor the status of decommissioning funds. Any licensee for a plant involved in a merger or acquisition shall submit this report annually. Any licensee for a plant that is within 5 years of the end of its current operating license shall submit this report annually. Any licensee for a plant that has already closed before its licensed life shall submit this report annually. As of December 31, 2011, Indian Point Nuclear Generating Station, Units 2 & 3, and Pilgrim Nuclear Power Station are within 5 years of the end of its current operating license. Indian Point Nuclear Generating Station, Unit 1 was granted an 40-year Operating License in 1962, but was permanently shut down in 1974, and is now in safe storage (SAFSTOR).

In general, the 2012 DFS report submitted to the NRC provided all of the required reporting requirements under 10 CFR 50.75(f)(1) in a manner that required no additional requests for information. To note, because a site-specific decommissioning cost estimate was submitted based on the SAFSTOR scenario for Indian Point Nuclear Generating Station, Unit 2, this unit is considered to be certifying to that amount of decommissioning and is, therefore, held to that certification amount in the DFS report.

Based on the reported decommissioning trust fund balance, and considering SAFSTOR for Indian Point Nuclear Generating Station, Units 1 & 2, together with earnings credits specified under NRC regulations, the NRC determined that the amount of decommissioning financial assurance you provided was equal to or greater than the minimum required amount based on the submitted site-specific cost estimates.

This letter confirms correspondence, described above, regarding the DFS reports for operating power reactors and non operating power reactors as required under 10 CFR 50.75(f)(1). As of the date of this letter, considering the available information, the NRC determined that Entergy satisfied the requirements of 10 CFR 50.75 for Indian Point Nuclear Generating Station, Units 1, 2, & 3, and Pilgrim Nuclear Power Station as of December 31, 2011. The DFS report analyses are enclosed.

Sincerely, Name Branch Division Office