ML063480024

From kanterella
Jump to navigation Jump to search
Drop-In Visit from Entergy (Pilgrim)
ML063480024
Person / Time
Site: Pilgrim
Issue date: 12/13/2006
From: Racquel Powell
NRC/RGN-I/DRP/PB5
To: David Lew
Division Reactor Projects I
References
Download: ML063480024 (2)


Text

December 13, 2006 MEMORANDUM TO: David C. Lew, Director Division of Reactor Projects, RI FROM: Raymond J. Powell, Chief /RA/

Projects Branch 5 Division of Reactor Projects, RI

SUBJECT:

DROP-IN VISIT FROM ENTERGY (PILGRIM)

On December 6, 2006, Samuel Collins, Marc Dapas, David Lew, A. Randall Blough, Tracy Walker, Nicole Sieller, and Garrett Newman met with Constellation's Mike Balduzzi (Site Vice President), Kevin Bronson (General Manager), Steve Bethay (Director of Nuclear Safety Assessments), and Bryan Ford (Licensing Manager). The purpose of this visit was to discuss Pilgrim Nuclear Power Station performance and initiatives.

During the meeting, the following topics were discussed:

1. Plant performance overview
2. Results of recent INPO evaluation
3. Equipment reliability
4. Maintenance backlogs
5. Radiation exposure
6. Human performance
7. Staffing issues (security transition, SRO/RO retention and pipeline)
8. License renewal
9. Refueling outage major projects The visit began at 10:00 a.m. and ended at 1:00 p.m. No regulatory decisions were requested or made. A meeting handout was provided by Entergy and is enclosed with this memorandum.

Enclosure:

As stated

D. Lew 2 MEMORANDUM TO: David C. Lew, Director Division of Reactor Projects, RI FROM: Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects, RI

SUBJECT:

DROP-IN VISIT FROM ENTERGY (PILGRIM)

On December 6, 2006, Samuel Collins, Marc Dapas, David Lew, A. Randall Blough, Tracy Walker, Nicole Sieller, and Garrett Newman met with Constellation's Mike Balduzzi (Site Vice President), Kevin Bronson (General Manager), Steve Bethay (Director of Nuclear Safety Assessments), and Bryan Ford (Licensing Manager). The purpose of this visit was to discuss Pilgrim Nuclear Power Station performance and initiatives.

During the meeting, the following topics were discussed:

1. Plant performance overview
2. Results of recent INPO evaluation
3. Equipment reliability
4. Maintenance backlogs
5. Radiation exposure
6. Human performance
7. Staffing issues (security transition, SRO/RO retention and pipeline)
8. License renewal
9. Refueling outage major projects The visit began at 10:00 a.m. and ended at 1:00 p.m. No regulatory decisions were requested or made.

A meeting handout was provided by Entergy and is enclosed with this memorandum.

Enclosure:

As stated Distribution: Via Email S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP A. Blough, DRS K. Farrar, ORA R. Powell, DRP N. Sieller, DRP SUNSI Review Complete: TEW (Reviewers Initials)

DOCUMENT NAME: C:\FileNet\ML063480024.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP NAME RPowell DATE 12/13/06 OFFICIAL RECORD COPY