Letter Sequence Supplement |
---|
|
Results
Other: ML060300028, ML061220630, ML061220716, ML061710422, ML061940175, ML062090293, ML062090294, ML062090300, ML062090304, ML062090305, ML062090307, ML062090309, ML062090318, ML062090319, ML062090322, ML062090324, ML062090328, ML062090333, ML062090338, ML062090380, ML062090387, ML062090388, ML062090488, ML062090490, ML062090493, ML062090496, ML062090497, ML062090498, ML062090499, ML062090546, ML062090561, ML062090563, ML062090565, ML062090567, ML062090569, ML062120406, ML062120407, ML062120408, ML062120410, ML062120412, ML062120415, ML062120477, ML062120480, ML062120491, ML062120498, ML062120543, ML062120549, ML062120625, ML062120629, ML062120631... further results
|
|
|
---|
Category:Letter
MONTHYEARL-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) L-23-011, 10 CFR 72.48 Biennial Change Summary Report2023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 ML22102A0932022-05-12012 May 2022 LTR-22-0067 Response to Matthew P. Levesque, President, Barnstable Town Council Regarding Irradiated Water Release from Pilgrim IR 05000293/20220012022-05-11011 May 2022 NRC Inspection Report No. 05000293/2022001 ML22104A0542022-04-30030 April 2022 LTR-22-0093 Response to Sheila Lynch-Benttinen, Regarding Irradiated Water Release from Pilgrim L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22152A2592022-04-25025 April 2022 Zaccagnini Letter Dated 04/25/22 ML22152A2642022-04-19019 April 2022 Flynn Letter Dated 04/19/22 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22130A6762022-03-14014 March 2022 Decola Ltr Dtd 03/14/22 Re Potential Discharge of Radioactive Water from Pilgrim Nuclear Power Station ML22041B0762022-03-0707 March 2022 03-07-22 - Letter to the Honorable William R. Keating, Responds to Letter Regarding Proposed Release of Irradiated Water at Pilgrim Nuclear Power Station Into Cape Cod Bay ML22054A2962022-02-23023 February 2022 Annual ISFSI Radioactive Effluent Release Report for 2021 2024-02-02
[Table view] |
Text
nEntergy Nuclear Operations, Inc.
Pilgrim 600 Nuclear Power Station Rocky Hill Road Plymouth, MA 02360 April 22, 2011 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Pilgrim Nuclear Power Station (PNPS) License Renewal Application (LRA) Supplemental Information
REFERENCES:
- 1. Entergy Letter No. 2.06.003, to USNRC, "Entergy Nuclear Operations Inc., License No. DPR-35, License Renewal Application," dated January 25, 2006.
- 2. Summary of Telephone Conference Call Held on March 23, 2011, Between the USNRC and Entergy Nuclear Operations, Inc.,
Concerning the Pilgrim Nuclear Power Station License Renewal Application, dated April 11, 2011.
LETTER NUMBER: 2.11.031
Dear Sir or Madam:
On January 25, 2006, Entergy Nuclear Operations, Inc. (Entergy) submitted the License Renewal Application (LRA) for the Pilgrim Nuclear Power Station (PNPS) as indicated by Reference 1. to this letter provides supplemental information to the LRA to address questions discussed with the NRC staff on a teleconference held on March 23, 2011.
This letter contains no new regulatory commitments.
Should you have any questions or require additional information concerning this submittal, please contact Mr. Joseph R. Lynch at 508-830-8403.
I declare under penalty of perjury that the foregoing is true and correct. Executed on April 0'0 , 2011.
Sincerely, ephenJ. B thia Director Nuclear Safety Assurance JRL~jI
Entergy Nuclear Operations, Inc. Letter Number: 2.11.031 Pilgrim Nuclear Power Station Page 2 Attachments: 1. License Renewal Application Supplemental Information (3 Pages) cc:
Mr. William M. Dean Lisa M. Regner Regional Administrator, Region 1 Project Manager U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 475 Allendale Road U.S. Nuclear Regulatory Commission King of Prussia, PA 19406-1415 Washington, DC 20555-0001 (w/o Attachments)
Mr. Richard V. Guzman, Project Manager Mr. Eric J. Leeds, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-00001 Mail Stop O-8-C2 Washington, DC 20555 Susan L. Uttal, Esq. Mr. Matthew Brock, Esq.
Office of the General Counsel Commonwealth of Massachusetts U.S. Nuclear Regulatory Commission Assistant Attorney General Mail Stop 0-15 D21 Environmental Protection Division Washington, DC 20555-0001 One Ashburton Place Boston, MA 02108 Sheila Slocum Hollis, Esq. Diane Curran, Esq.
Duane Morris L.L.P. Harmon, Curran, and Eisenberg, L.L.P.
505 9 th Street N.W., Suite 1000 1726 M Street N.W., Suite 600 Washington, DC 20004-2166 Washington, DC 20036 Catherine Haney, Director NRC Resident Inspector Office of Nuclear Material and Safeguards Pilgrim Nuclear Power Station U.S. Nuclear Regulatory Commission Washington, DC 20555-00001 Mr. Robert Gallaghar, Acting Director Mr. John Giarrusso, Jr.
Massachusetts Department of Public Health Planning and Preparedness Division Manager Radiation Control Program Massachusetts Emergency Management Agency Schrafft Center, Suite 1 M2A 400 Worcester Road 529 Main Street Framingham, MA 01702 Charlestown, MA 02129
Attachment 1 to Letter No. 2.11.031 Pilgrim Nuclear Power Station License No. DPR-35 (Docket No. 50-293)
License Renewal Application Supplemental Information (3 Pages)
Entergy Nuclear Operations, Inc. Letter Number: 2.11.031 Pilgrim Nuclear Power Station Attachment 1, Page 2 Pilgrim Nuclear Power Station License Renewal Application - Supplemental Information Entergy provides the following additional supplemental information to address questions discussed with the NRC staff on a teleconference held on March 23, 2011 regarding the following areas at Pilgrim Nuclear Power Station (PNPS).
- Inspection of Buried Pipe and Tanks
Background
In a letter dated March 16, 2011, the applicant revised LRA sections associated with inspection of containment coatings, inspection of buried pipe and tanks, and aging management of low voltage cables.
Issue The Updated Final Safety Analysis Report supplements for the LRA sections inspection of containment coatings, inspection of buried pipe and tanks, and aging management of low voltage cables do not reflect the changes; therefore the staff cannot confirm that the changes will become part of the current licensing basis for PNPS.
Request Revise the UFSAR supplement to reflect the modifications to the programs associated with inspection of containment coatings, inspection of buried pipe and tanks, and aging management of low voltage cables as reflected in Entergy letters dated January 7 and 31, and March 16, 2011.
Response
The LRA UFSAR Section A.2.1.42 for Protective Containment Coatings was provided in Entergy Letter, 2.11.027, dated April 21, 2011.
The revised LRA UFSAR Section A.2.1.2 for Buried Piping and Tanks Inspection Program is provided as follows:
A.2.1.2 Buried Piping and Tanks Inspection Program The Buried Piping and Tanks Inspection Program include; (a) preventive measures to mitigate corrosion and (b) inspections to manage the effects of corrosion on the pressure-retaining capability of buried carbon steel, stainless steel, and titanium components. Preventive measures are in accordance with standard industry practice for maintaining external coatings and wrappings. Buried components are inspected when excavated during maintenance.
Entergy Nuclear Operations, Inc. Letter Number: 2.11.031 Pilgrim Nuclear Power Station Attachment 1, Page 3 Prior to the Period of Extended Operation (PEO) PNPS will excavate and inspect the entire circumference of the following buried carbon steel pipe systems:
- 30 feet of Station Blackout (SBO) Diesel fuel oil piping and 20 feet of SBO coolant piping.
These inspections will be conducted at least once every ten years during the PEO.
If measured soil resistivity is <20,000 ohms or scores higher than 10 points using the American Water Works Association C105, or if backfill is found to have damaged the coating, the length of SBGTS pipe inspected will be doubled during subsequent ten (10) year inspections.
The two buried carbon steel EDG fuel oil tanks will be inspected prior to the PEO, and on a ten (10) year interval following the PEO.
If trending within the corrective action program identifies susceptible locations, the areas with a history of corrosion problems are evaluated for the need for additional inspection, alternate coating, or replacement.
The revised LRA UFSAR Section A.2.1.21 Non-EQ Inaccessible Medium-Voltage Cable Program is provided as follows:
A.2.1.21 Non-EQ Inaccessible Medium-Voltage Cable Program The Non-EQ Inaccessible Medium Voltage Cable Program is based on, and consistent with NUREG-1801, Rev 2, section XI.E3. In scope, inaccessible medium-voltage and low-voltage (400V to 35KV) cables exposed to significant moisture are tested at least once every six years to provide an indication of the condition of the insulation.
Significant moisture is defined as periodic exposures that last more than a few days.
The specific test performed is a proven test for detecting deterioration of the insulation, such as power factor, partial discharge, polarization index, or other testing that is state-of-the-art at the time the test is performed. Evaluation of the test results are used to determine the need for increased test frequencies.
Inspections for water collection in cable manholes and conduit containing in scope medium and low voltage cables with a license renewal intended function (400V to 35KV) occur at least once every year. Additional condition-based inspections of these manholes are performed based on natural events for a coastal site. The results of the inspections are reviewed to determine if the inspection frequency, and/or testing frequency should be modified.