April 10, 2012 MEETING
SUMMARY
LICENSEE:
ENTERGY NUCLEAR OPERATIONS, Inc.
FACILITY:
PILGRIM NUCLEAR POWER STATION
SUBJECT:
SUMMARY
OF PUBLIC MEETING On Thursday, March 29, 2012, at 5:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open-house at the Plymouth Town Hall in Plymouth, MA. The NRC conducted the open-house to discuss its assessment of the safety performance at Pilgrim Nuclear Power Station (Pilgrim) for 2011.
A notice of the open-house was issued on March 14, 2012, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML12074A083.
ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.
The NRC presented poster boards, slides, and was available to discuss its assessment of the safety performance of Pilgrim for the period of January 1 through December 31, 2011, as documented in our letter dated March 5, 2012 (ADAMS Accession No. ML12061A235). The NRC poster boards and slides included background on the Reactor Oversight Process (ROP).
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Pilgrim can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Members of the public, local officials, State officials, and members of the media attended the open-house and were offered the opportunity to question the NRC regarding Pilgrims performance and the role of the agency in ensuring safe plant operations.
/RA/
Ronald R. Bellamy, Chief Projects Branch 5 Division of Reactor Projects
Enclosures:
(1) NRC Slides (ADAMS ML12101A285)
(2) Public Meeting Sign In Sheets (ADAMS ML12101A308)
ML12061A235). The NRC poster boards and slides included background on the Reactor Oversight Process (ROP).
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Pilgrim can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Members of the public, local officials, State officials, and members of the media attended the open-house and were offered the opportunity to question the NRC regarding Pilgrims performance and the role of the agency in ensuring safe plant operations.
/RA/
Ronald R. Bellamy, Chief Projects Branch 5 Division of Reactor Projects
Enclosures:
(1) NRC Slides (ADAMS ML12101A285)
(2) Public Meeting Sign In Sheets (ADAMS ML12101A308)
Distribution: (via email)
R. Bellamy T. Setzer E. Keighley J. DeBoer M. Schneider B. Smith, Admin S. Campell, RidsNRRPMResource DOC NAME: G:\\DRP\\BRANCH5\\Annual Assessment Meetings\\2011 EOC\\Pilgrim 2011 Annual Assessment Meeting Summary.docx ADAMS Accession No.: ML12101A374 SUNSI Review
- Non-Sensitive Sensitive Publicly Available
Non-Publicly Available OFFICE RI/DRP RI/DRP NAME TSetzer RBellamy DATE 04/10/12 04/10/12