Summary of 1/15/2019 Public Meeting Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report, Which Includes the Site-Specific Decommissioning Cost Estimate
ML19017A173
Person / Time
Site: Pilgrim
Issue date: 01/30/2019
From: John Lamb
Special Projects and Process Branch
To:
Entergy Nuclear Operations
J. Lamb, 415-3100
Shared Package
ML19017A162 List:
References
EPID L-2018-LLL-0031, EPID L-2018-LLO-0003
Download: ML19017A173 (7)


Text

PKG ML19017A162; Meeting Summary ML19017A173; NRC Slide Presentations ML19008A494; Entergy Slide Presentation ML19009A171; Holtec Slide Presentation ML19009A343; Transcript ML19029A025

  • via e-mail OFFICE NRR/DORL/LSPB/PM NRR/DORL/LSPB/LA NMSS/DUWP/RDP/BC*

NAME JLamb JBurkhardt BWatson DATE 1/16/2019 1/18/2019 1/22/2019 OFFICE NRR/DORL/LSPB/BC NRR/DORL/LSPB/PM NAME EBrown for DBroaddus JLamb DATE 1/18/2019 1 / 30 /2019