Category:Meeting Briefing Package/Handouts
MONTHYEARML23113A0232023-04-11011 April 2023 NRC Presentation: Overview of Pilgrim Liquid Discharge Considerations for the North Atlantic Right Whale Recovery Plan Northeast U.S. Implementation Team (Neit) ML22227A0742022-08-10010 August 2022 Overview of Pilgrim Liquid Discharge Considerations NOAA ML22124A3012022-04-25025 April 2022 Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022 ML20045D1092020-01-31031 January 2020 PSP Pre-Submittal Meeting Jan 31 2020 HDI ML19248C2392019-09-11011 September 2019 NEIMA Section 108 Public Meeting Slides - Pilgrim September 11, 2019 ML19119A0882019-04-29029 April 2019 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML19009A3432019-01-15015 January 2019 Holtec Slides PSDAR Meeting 1-15-19 ML19009A1712019-01-15015 January 2019 Post-Shutdown Decommissioning Activities Report, NRC Public Meeting January 15, 2019 ML19008A4942019-01-15015 January 2019 Post-Shutdown Decommissioning Activities Report - NRC Presentation at Public Meeting on January 15, 2019 ML18262A1352018-09-25025 September 2018 NRC License Transfer Application 9/25/2018 Pre-Submittal Meeting Presentation Slides ML18127A0282018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML18127A0272018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML17296A2162017-10-18018 October 2017 Presentations on Reactor Decommissioning at Ma Ndcap at Plymouth Ma Public Meeting Oct 18, 2017 ML17166A2892017-06-20020 June 2017 Entergy Slides for 06/20/2017 Public Meeting, Licensing Action Submittal Plan - Decommissioning. ML17150A0012017-06-20020 June 2017 6/20/2017 Meeting Slides - Entergy Nuclear Operations, Inc. - Licensing Action Submittal Plan - Decommissioning (CAC Nos. MF9624, MF9625, MF9626, MF9627, and MF9628) ML17086A3802017-03-21021 March 2017 3/21/2017 - Annual Assessment & IP 95003 Exit Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML17086A3882017-03-21021 March 2017 3/21/2017 - Annual Assessment & 95003 Exit Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML16112A1562016-04-13013 April 2016 4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - Entergy Presentation Slides ML16111A8892016-04-13013 April 2016 4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - NRC Presentation Slides ML15292A0132015-10-20020 October 2015 ERO Staffing and Training Teleconference with NRC Staff ML15208A4602015-07-0808 July 2015 Slides of Regulatory Conference for July 8, 2015 ML15084A0532015-03-18018 March 2015 3/18/2015 - Pilgrim 2014 Annual Assessment Meeting - NRC Presentation (w/95002 Inspection Results) ML14136A3502014-05-14014 May 2014 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 5/1/2014 (W/Nrc Presentation Slides) ML14015A1702013-12-12012 December 2013 Pilgrim Dry Cask Presentation - Dec. 12, 2013 ML14006A2732013-12-12012 December 2013 NRC Webinar Dry Cask Storage of Nuclear Fuel at Pilgrim Nuclear Power Plant ML13130A1542013-05-10010 May 2013 Slides for ISFSI Briefing for Town of Plymouth ML13130A1232013-05-10010 May 2013 2012 Annual Assessment Meeting Slides ML12101A2852012-04-10010 April 2012 Annual Assessment Meeting Slides ML11188A0192011-07-0606 July 2011 NRC Meeting with NEI Workshop June 28-29, 2011 Enhancements ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML1009900312010-04-13013 April 2010 Entergy Nuclear Operations (Entergy): Meeting Presentation 2009 Nuclear Safety Culture Assessment Meeting ML0906906982009-03-20020 March 2009 NRC Presentation Slides for Pilgrim Nuclear Power Plant Annual Assessment Meeting to Be Held 3/26/09 ML0809403832008-03-26026 March 2008 Attendance List for Pilgrim Annual Assessment Meeting ML0731902202007-11-0707 November 2007 Meeting Handout Fitzpatrick GNF2 Introduction at Entergy ML0726400222007-09-0606 September 2007 License Renewal ACRS Full Committee Brief of September 6, 2007 ML0712807662007-04-26026 April 2007 E-mail: (NPA-PD) Link to Rutgers Slides on Wrf Calcs - Pilgrim ML0705106742007-02-21021 February 2007 NMC Slides for Public Meeting, Conduct of Operations Action Plan Update. ML0704403232007-01-30030 January 2007 License Renewal Inspection Exit Meeting Slides ML0715700492007-01-16016 January 2007 Budget Presentation,Town of Plymouth Fiscal Year 2008 Budget Primer. ML0614201642006-05-17017 May 2006 Pilgrim Nuclear Power Station Environmental Scoping Meeting Handouts ML0507500022005-03-16016 March 2005 NRC Slides - Pilgrim Annual Assessment Meeting ML0309001032003-03-26026 March 2003 Annual Assessment Meeting Slides ML0225302662002-09-0909 September 2002 Attachment 2 to Summary of 07/24/2002 Meeting with Entergy Nuclear Operations, Inc., Regarding Pilgrim Nuclear Power Station Proposed Safety-Relief Valve Seismic Analysis Methodology ML0210802402002-03-28028 March 2002 Annual Assessment Meeting Slides ML0212004532002-03-28028 March 2002 Entergy Nuclear Generation Company - Pilgrim Nuclear Power Station Annual Assessment Meeting Slides ML17252A1571977-09-14014 September 1977 Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program 2023-04-11
[Table view] Category:Meeting Summary
MONTHYEARML24241A1512024-09-18018 September 2024 License Termination Plan Readiness Assessment Site Visit Summary - June 2024 ML21257A3822021-09-15015 September 2021 Summary of Clarification Cal with Holtec Decommissioning International, Llc. Regarding Second Follow-On Emergency Preparedness Request for Additional Information ML21238A2752021-08-26026 August 2021 Clarification Call Regarding RAI License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Plan ML21075A3152021-03-17017 March 2021 March 11,2021 Pilgrim Request for Additional Information Response Clarifiction Meeting - Proposed Physical Security Plan ML21035A2312021-02-18018 February 2021 Physical Security Plan - RAI Clarification Meeting ML21035A1712021-02-18018 February 2021 Physical Security Plan - ISFSI Only Meeting Summary ML20045D1082020-02-19019 February 2020 January 31, 2020 Meeting Summary Pre-Amendment Meeting Proposed Changes to Pilgrim ISFSI Physical Security Plan ML19274B6662019-11-13013 November 2019 Summary of Public Meeting Near the Pilgrim Nuclear Power Station Regarding the Establishment and Operation of Community Advisory Boards ML19121A2172019-04-30030 April 2019 Annual Assessment Meeting for Pilgrim Nuclear Power Station - Meeting Summary ML19017A1732019-01-30030 January 2019 Summary of 1/15/2019 Public Meeting Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report, Which Includes the Site-Specific Decommissioning Cost Estimate ML18275A3952018-10-12012 October 2018 9/25/2018 Summary of Pre-submittal Meeting with Entergy Nuclear and Holtec International to Discuss Potential License Transfer Application for Pilgrim Nuclear Power Plant ML18130A1592018-05-0909 May 2018 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML17173A7672017-07-28028 July 2017 Summary of 6/20/2017 Meeting with Entergy to Discuss Plan for Decommissioning Licensing Actions of Palisades, Pilgrim, Indian Point, Units 2 and 3, and Vermont Yankee ML17101A3992017-04-13013 April 2017 Statement of Congressman Keating - NRC Annual Assessment Meeting for PNPS - March 21, 2017 ML17103A4132017-04-13013 April 2017 3/21/2017 - Annual Assessment/95003 Inspection Exit Summary Meeting for Pilgrim Nuclear Power Station ML17059C9192017-02-28028 February 2017 1/31/2017 - Summary of Category 3 Public Meeting - Preliminary Findings and Status of 95003 Inspection at Pilgrim ML16116A0052016-04-22022 April 2016 4/13/2016 - Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station ML15306A0122015-11-0505 November 2015 Summary of October 20, 2015, Teleconference with Entergy Nuclear Operations to Discuss Proposed Changes to Emergency Response Organization Training for Pilgrim Nuclear Power Station ML15092A7932015-04-0202 April 2015 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 3/18/15 ML14136A3502014-05-14014 May 2014 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 5/1/2014 (W/Nrc Presentation Slides) ML14086A2912014-04-22022 April 2014 Summary of Telephone Conference Regarding the Verbal Authorization of Relief Request PRR-25, Revision 1 ML13109A4362013-04-19019 April 2013 4/2/2013 - Pilgrim - Annual Assessment Meeting Summary ML12101A3742012-04-10010 April 2012 Summary of Meeting with Pilgrim Nuclear Power Station 2011 Annual Assessment ML11292A1612011-10-20020 October 2011 Summary of Meeting with Beyond Nuclear Regarding Their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors ML1118105332011-06-30030 June 2011 Summary of Annual Assessment Public Meeting with Entergy Nuclear Operation, Inc ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML11166A1342011-06-22022 June 2011 Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs) ML1110401712011-04-27027 April 2011 04/5/2011 Summary of Preapplication Meeting with Entergy Operations, Inc. to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1109700342011-04-19019 April 2011 Summary of Tele Conf Call Held on 4/6/11, Between the USNRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1108206892011-04-19019 April 2011 February 24, 2011, Summary of Telephone Conference Call Held Between NRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1108202082011-04-11011 April 2011 Summary of Telephone Conference Call Held on March 23, 2011, Between the USNRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1100404192011-02-15015 February 2011 Summary of Telephone Conference Call Held on December 6, 2010, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operating, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application (Tac No. MC9669) ML1034105062011-01-0707 January 2011 December 1, 2010, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1025900772010-10-15015 October 2010 Summary of Telephone Conference Call Held on 6/2/10 Btw the USNRC and Entergy Nuclear Operations, Inc. Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1025900862010-10-15015 October 2010 5/25/10 Summary of Telephone Conference Call Held Between USNRC and Entergy Nuclear Operations, Inc. Concerning the Annual Update Associated with the Pilgrim Nuclear Power Station License Renewal Application ML1012603632010-05-0606 May 2010 Summary of Annual Assessment Open House Public Meeting Discussed Nrc'S Assessment of Safety Performance of Pilgrim for Cy 2009 ML1011100082010-04-21021 April 2010 Summary of Public Meeting to Discuss the Results of Entergy Nuclear Plant Safety Culture Workplace Survey ML0909702992009-04-13013 April 2009 Annual Assessment Meeting Summary, Slides, Sign-in Sheet, Misc Documents, for 3/26/09 Meeting ML0809202432008-04-0101 April 2008 Summary of March 28, 2008, Annual Assessment Meeting with Entergy Nuclear Operations, Inc ML0724302642007-09-0707 September 2007 08/30/2007 Summary of Telephone Conference Call Between the U.S. NRC and Entergy Nuclear Operations, Inc., to Discuss and Clarify Commitment No. 47 Pertaining to the Pilgrim Nuclear Power Station License Renewal Application ML0713701422007-05-18018 May 2007 Summary of Annual Assessment Meeting with Entergy Nuclear Operations, Inc., Regarding the Nrc'S Assessment of the Safety Performance of Pilgrim Nuclear for the Calendar Year 2006 ML0710300932007-05-0101 May 2007 03/14-15/2007 Summary of Conference Calls with Entergy Nuclear Operations Inc., Pilgrim License Renewal Application, Pilgrim Request for Additional Information B.1.16.1, and Neutron Fluence ML0710300532007-04-27027 April 2007 Summary of Conference Calls on April 2, 2007, with Entergy Nuclear Operations, Inc., Regarding the Pilgrim License Renewal Application ML0710300482007-03-19019 March 2007 E-mail: (PD) Meeting Summary - March 14 & 15 2007 - from Perry Buckberg to Doug Ellis 3/19/07 7:05am ML0706005672007-03-15015 March 2007 Summary of the License Renewal Telephone Conference Call and Meeting Held Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute License Renewal Task Force ML0710302212007-03-0707 March 2007 E-MAIL: (PD) Updated - Week of 2/26 Conference Call Record from Perry Buckberg to Doug Ellis 3/7/07 6:36am ML0705402052007-03-0101 March 2007 01/24/2007 Summary of Meeting with Pilgrim on the Draft Supplemental Environmental Impact Statement Regarding Pilgrim License Renewal Review ML0635400102007-01-18018 January 2007 12/18/2006 Summary of Conference Call with Entergy Nucelar Operations, Inc., Regarding the Pilgrim License Renewal Application 2024-09-18
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23113A0232023-04-11011 April 2023 NRC Presentation: Overview of Pilgrim Liquid Discharge Considerations for the North Atlantic Right Whale Recovery Plan Northeast U.S. Implementation Team (Neit) ML22227A0742022-08-10010 August 2022 Overview of Pilgrim Liquid Discharge Considerations NOAA ML22124A3012022-04-25025 April 2022 Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022 ML22088A2172022-03-16016 March 2022 Liquid Effluent Discharge Presentation ML20045D1092020-01-31031 January 2020 PSP Pre-Submittal Meeting Jan 31 2020 HDI ML19248C2392019-09-11011 September 2019 NEIMA Section 108 Public Meeting Slides - Pilgrim September 11, 2019 ML19119A0882019-04-29029 April 2019 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML19009A3432019-01-15015 January 2019 Holtec Slides PSDAR Meeting 1-15-19 ML19008A4942019-01-15015 January 2019 Post-Shutdown Decommissioning Activities Report - NRC Presentation at Public Meeting on January 15, 2019 ML18262A1352018-09-25025 September 2018 NRC License Transfer Application 9/25/2018 Pre-Submittal Meeting Presentation Slides ML18127A0282018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML18127A0272018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18075A1232018-03-20020 March 2018 Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations ML17296A2162017-10-18018 October 2017 Presentations on Reactor Decommissioning at Ma Ndcap at Plymouth Ma Public Meeting Oct 18, 2017 ML17191A7872017-07-13013 July 2017 Regulatory Conference Presentation 07-13-17 ML17086A3802017-03-21021 March 2017 3/21/2017 - Annual Assessment & IP 95003 Exit Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML17086A3882017-03-21021 March 2017 3/21/2017 - Annual Assessment & 95003 Exit Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML16112A1562016-04-13013 April 2016 4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - Entergy Presentation Slides ML16111A8892016-04-13013 April 2016 4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - NRC Presentation Slides ML15292A0132015-10-20020 October 2015 ERO Staffing and Training Teleconference with NRC Staff ML15208A4602015-07-0808 July 2015 Slides of Regulatory Conference for July 8, 2015 ML15084A0532015-03-18018 March 2015 3/18/2015 - Pilgrim 2014 Annual Assessment Meeting - NRC Presentation (w/95002 Inspection Results) ML14136A3502014-05-14014 May 2014 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 5/1/2014 (W/Nrc Presentation Slides) ML14015A1702013-12-12012 December 2013 Pilgrim Dry Cask Presentation - Dec. 12, 2013 ML14006A2732013-12-12012 December 2013 NRC Webinar Dry Cask Storage of Nuclear Fuel at Pilgrim Nuclear Power Plant ML13130A1542013-05-10010 May 2013 Slides for ISFSI Briefing for Town of Plymouth ML13130A1232013-05-10010 May 2013 2012 Annual Assessment Meeting Slides ML12262A3282012-09-13013 September 2012 9/13/2012 Pilgrim Watch Final Presentation NUREG-0654 Public Mtg ML12101A2852012-04-10010 April 2012 Annual Assessment Meeting Slides ML11188A0192011-07-0606 July 2011 NRC Meeting with NEI Workshop June 28-29, 2011 Enhancements ML1118105122011-06-30030 June 2011 Aam Slides ML0909702992009-04-13013 April 2009 Annual Assessment Meeting Summary, Slides, Sign-in Sheet, Misc Documents, for 3/26/09 Meeting ML0906906982009-03-20020 March 2009 NRC Presentation Slides for Pilgrim Nuclear Power Plant Annual Assessment Meeting to Be Held 3/26/09 ML0807011352008-03-10010 March 2008 Slides for the Pilgrim Station Annual Assessment Meeting CY2007 - ROP8 - 03/26/2008 ML0731902202007-11-0707 November 2007 Meeting Handout Fitzpatrick GNF2 Introduction at Entergy ML0726400222007-09-0606 September 2007 License Renewal ACRS Full Committee Brief of September 6, 2007 ML0712807662007-04-26026 April 2007 E-mail: (NPA-PD) Link to Rutgers Slides on Wrf Calcs - Pilgrim ML0710102652007-04-11011 April 2007 Slides for 2006 Annual Assessment Meeting, NRC Annual Performance Assessment of Pilgrim ML0705106742007-02-21021 February 2007 NMC Slides for Public Meeting, Conduct of Operations Action Plan Update. ML0704403232007-01-30030 January 2007 License Renewal Inspection Exit Meeting Slides ML0704304762007-01-30030 January 2007 License Renewal Inspection Exit Meeting - Slides with Notes ML0703305622007-01-24024 January 2007 Dseis Meeting Presentation, Preliminary Results of Environmental Review Pilgrim Nuclear Power Station ML0715700492007-01-16016 January 2007 Budget Presentation,Town of Plymouth Fiscal Year 2008 Budget Primer. ML0634800262006-12-0606 December 2006 Drop-In Visit (Entergy) Slides ML0609404082006-04-0404 April 2006 NRC Slides for Annual Assessment Public Meeting with Entergy (Pilgrim Station) Reference CY2005 Performance ML0617802712006-03-0707 March 2006 RIC 2006 Presentation - T2E - Vincent Coulehan - Use of Operating Experience (Regulator/Operator/Licensee) ML0615902322006-03-0707 March 2006 2006/03/07- - RIC 2006 Presentation - T1F - Garry G. Young - License Renewal ML0615901582006-03-0707 March 2006 03/07/2006 - RIC 2006 Presentation - T1E - John F. Mccann - License Renewal ML0632802522005-07-18018 July 2005 Briefing Slides for 07/18/2005, Pilgrim Station Force-on-Force Inspection 2023-04-11
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 May 14, 2014 MEETING
SUMMARY
LICENSEE: ENTERGY NUCLEAR OPERATIONS, INC.
FACILITY: PILGRIM NUCLEAR POWER STATION
SUBJECT:
SUMMARY
OF PUBLIC MEETING On May 1, 2014, at 6:00 pm, the U. S. Nuclear Regulatory Commission (NRC) conducted a formal meeting at the Radisson Hotel Plymouth Harbor in Plymouth, MA. The NRC conducted a formal meeting and a question and answer portion to discuss its assessment of the safety performance at Pilgrim Nuclear Power Station for 2013.
A notice of the public meeting was issued on April 8, 2013, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML14098A316.
ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.
The NRC presented fact sheets, reading material, and was available to discuss its assessment of the safety performance of Pilgrim Nuclear Power Station for the period of January 1 through December 31, 2013, as documented in our letter dated March 4, 2014 (ADAMS Accession No. ML14059A297). The NRC fact sheets and reading material included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Pilgrim Nuclear Power Station can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Members of the public, local officials, State officials, and members of the media attended the public meeting and were offered the opportunity to question the NRC regarding Pilgrims performance and the role of the agency in ensuring safe plant operations.
/RA/
Raymond R. McKinley, Chief Projects Branch 5 Division of Reactor Projects
Enclosures:
- 1. PowerPoint Presentation
- 2. Attendee List
ML14059A297). The NRC fact sheets and reading material included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Pilgrim Nuclear Power Station can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Members of the public, local officials, State officials, and members of the media attended the public meeting and were offered the opportunity to question the NRC regarding Pilgrims Nuclear Power Station performance and the role of the agency in ensuring safe plant operations.
/RA/
Raymond R. McKinley, Chief Projects Branch 5 Division of Reactor Projects
Enclosures:
- 1. PowerPoint Presentation
- 2. Attendee List Distribution: (via email)
R. McKinley, DRP B. Scrabeck, DRP, RI S. Shaffer, DRP S. Campbell, DRP, AA J. DeBoer, DRP RidsNRRPMPilgrim Resource M. Schneider, DRP, SRI DOC NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2013 EOC\Meeting Summaries\Annual Assessment Meeting Summary Pilgrim.docx ADAMS Accession No. ML14136A350 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME JDeBoer/JPD RMcKinley/RRM DATE 5/8/14 5/14/14 Pilgrim Annual Assessment Meeting Nuclear Regulatory Commission - Region I Plymouth, MA May 1, 2014 1
Purpose of Todays Meeting
- A public forum for discussion of Pilgrims performance in 2013
- NRC will address the performance issues identified in the annual assessment letter
- Pilgrim will be given the opportunity to present their insights and inform the NRC of new or existing programs to improve performance 2
Enclosure 1 1
Agenda
- Reactor Oversight Process
- NRC and Entergy will discuss the licensee's CY 2013 performance and Entergy's efforts to address improvement initiatives
- NRC available to address public questions 3
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Performance Indicator Baseline Inspection Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response 4
Enclosure 1 2
Pilgrim 2013 Inspection Activities
- Approximately 7000 hours0.081 days <br />1.944 hours <br />0.0116 weeks <br />0.00266 months <br /> of inspection &
related activities
- 2 resident inspectors on site
- Team and other inspections
- Permanent Plant Modifications
- Problem Identification and Resolution
- Independent Spent Fuel Storage Installation Pad Construction
- Others (Security, Emergency Preparedness, Operator Licensing, Radiation Protection) 5 Pilgrim Assessment Results January 1 - December 31, 2013
- All Green Findings
- Two White Performance Indicators
- Unplanned scrams with complications (USwC)
(>1)
- Unplanned scrams per 7000 critical hours (> 3) 6 Enclosure 1 3
Pilgrim Safety Significant PIs
- Unplanned Scrams with Complications
- Exceed the green/white threshold (>1)
- Two scrams with complications
- Feb. 8, 2013 - Pilgrim scrammed from 80 percent reactor power due to a loss of offsite power and main generator load reject (Winter Storm Nemo).
- Aug. 22, 2013 - Operators initiated a manual scram due to a loss of feedwater and entered a forced outage 7
Pilgrim Safety Significant PIs
- Unplanned Scrams per 7000 Critical Hrs
- Exceeded the green/white threshold (>3)
- Scrams on
Enclosure 1 4
Action Matrix DEGRADED CORNERSTONE Licensee Regulatory Degraded Multiple Repetitive Unacceptable Response Response Cornerstone Degraded Cornerstone Performance All Inputs are 1 or 2 White 2 White or 1 Yellow Multiple Yellow Inputs Overall Unacceptable Green; Inputs (in Input; Cornerstone or 1 Red Input; Performance; Plants Cornerstone different Objectives Met w/ Cornerstone not permitted to Objectives cornerstones); Moderate Objectives Met w/ Operate w/in this Fully Met Cornerstone Degradation in Significant Column; Objectives Safety Degradation in Safety Unacceptable Margin Fully Met Performance Performance to Safety
- Unplanned Scrams with Complications (>1)
- Unplanned Scrams / 7000 critical hours (>3) 9 National Summary of Plant Performance Status as of 04/30/2014 Licensee Response 84 Regulatory Response 10 Degraded Cornerstone 6 Multiple/Repetitive Deg. Cornerstone 1 Unacceptable 0 IMC 0350 Oversight 1 Total 102 10 Enclosure 1 5
Pilgrim Additional Inspection Activity
- Supplemental inspection will be scheduled upon notification by Entergy of readiness.
- IP95002 "Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area 11 Licensee Response and Remarks John Dent Site Vice President Entergy Pilgrim, LLC 12 Enclosure 1 6
Pilgrim 2013 Annual Assessment Summary
- While Entergy operated Pilgrim in a manner that preserved public health and safety, performance deficiencies were identified that led to the plant being in the degraded cornerstone column of the action matrix.
- The resulting action is increased oversight including a 95002 supplemental inspection.
13 Contacting the NRC
- Public Affairs (Region 1 office)
- (610) 337-5330/5331
- (800) 695-7403
- Allegation@nrc.gov
- General information or questions
- www.nrc.gov
- Select What We Do for Public Affairs 14 Enclosure 1 7
Reference Sources
- Reactor Oversight Process
- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/in dex.html
- Public Electronic Reading Room
- http://www.nrc.gov/reading-rm.html
- Public Document Room 800-397-4209 (Toll Free) 15 Pilgrim Annual Assessment Meeting
- NRC to address public questions 16 Enclosure 1 8
Fukushima Tier 1 Actions
- Issued July 2011
- 45 recommendations
- Tier 1 items requiring licensee action:
- 3 Orders
- 3 Requests for Information under 10 CFR 50.54(f) 17 Fukushima Tier 1 Actions
- Seismic and Flooding Walkdowns
- Licensees submitted reports November 30, 2012
- Seismic Hazard Re-evaluations
- Licensees submitted reports March 31, 2014
- Flood Hazard Re-evaluations
- Pilgrim re-evaluation due March 12, 2015 18 Enclosure 1 9
Fukushima Tier 1 Actions
- Mitigating Strategies for Beyond Design Basis External Events (FLEX)
- Onsite NRC audit - October 2014
- Full compliance - Spring 2015
- Phase 1 - Wetwell Venting
- Integrated Plan due June 30, 2014
- Phase 2 - Drywell Venting
- Integrated Plan due December 31, 2015
- Compliance by June 2019 20 Enclosure 1 10