February 24, 2011, Summary of Telephone Conference Call Held Between NRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application
ML110820689
Person / Time
Site: Pilgrim
Issue date: 04/19/2011
From: Lisa Regner
License Renewal Projects Branch 2
To:
Regner L M, NRR/DLR, 415-1906
References
TAC ME9669
Download: ML110820689 (5)


Text

'\.~"iI REGu<.q UNITED STATES

~~c. "o?, NUCLEAR REGULATORY COMMISSION

!

<<

~

0 WASHINGTON, D.C. 20555-0001 Iii  :

~;;; April 19, 2011

't/. fJ

'$>" ~o

        • '"

LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Pilgrim Nuclear Power Station

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON FEBRUARY 24, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC NO. MC9669)

The U.S. Nuclear Regulatory Commission (the staff) and representatives of Entergy Nuclear Operations, Inc. (the applicant) held a telephone conference call on February 24, 2011, to discuss and clarify a condition report associated with Pilgrim Nuclear Power Station (Pilgrim) license renewal review. The discussion focused on a technical review of containment electrical penetrations and whether these penetrations were evaluated for license renewal.

The condition report specifies a design life of 40 years for the containment electrical penetrations. The staffs concern focused on whether these components are being appropriately managed for the effects of aging to ensure component functionality beyond 40 years. Pilgrim staff stated that the electrical penetrations specified in the report are in the scope of license renewal as a containment pressure boundary, but are not required to be environmentally qualified (EO) per Title 10 of the Code of Federal Regulations Part 50.49, 'Environmental qualification of electric equipment important to safety for nuclear power plants' and are included in the non-EO of electrical penetrations aging management program.

Staff verified that these penetrations are periodically tested per Pilgrim technical specifications in accordance with 10 CFR 50 Appendix J and Regulatory Guide, 1.163, "Performance-Based Containment Leak-Test Program:'

- 2 Therefore, the staff agrees that these components are being appropriately age managed as specified in the Pilgrim license renewal application and as evaluated by the staff in NUREG-1891, "Safety Evaluation Report Related to the License Renewal of Pilgrim Nuclear Power Station," issued November 2007. provides a listing of the participants. The applicant had an opportunity to comment on this summary.

Lisa M. Regner, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosures:

As stated cc w/encls: via list serv

TELEPHONE CONFERENCE CALL PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS FEBRUARY 24, 2011 PARTICIPANTS AFFILIATIONS Lisa Regner U.S. Nuclear Regulatory Commission (NRC)

Raj Auluck NRC Abdul Sheihk NRC Joe Lynch Entergy Nuclear Operations, Inc. (Entergy)

Fred Mogolesko Entergy Dave Heard Entergy Roger Rucker Entergy ENCLOSURE

- 2 Therefore, the staff agrees that these components are being appropriately age managed as specified in the Pilgrim license renewal application and as evaluated by the staff in NUREG-1891, "Safety Evaluation Report Related to the License Renewal of Pilgrim Nuclear Power Station," issued November 2007. provides a listing of the participants. The applicant had an opportunity to comment on this summary.

Sincerely, IRA!

Lisa M. Regner, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-293

Enclosures:

As stated cc w/encls: via list serv ADAMS Accession No'.. ML110820689 OFFICE LARPOB:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME YEdmonds LRegner DWrona LRegner (Signature) 4/7/11 4/14/11 4/14/11 4/19/11 DATE OFFICIAL RECORD COpy

Memorandum To Entergy Nuclear Operations, Inc from L. Regner dated April 19, 2011

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON FEBRUARY 24,2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING THE ANNUAL UPDATE ASSOCIATED WITH THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION DISTRIBUTION:

HARDCOPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDIrRer1 Resource RidsNrrDIrRer2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsOpaMaii L. Regner S. Uttal, OGC B. Harris, OGC A. Jones, OGC S. Schneider, RI D. Jackson, RI R. Conte, RI