Summary of March 28, 2008, Annual Assessment Meeting with Entergy Nuclear Operations, Inc
ML080920243
Person / Time
Site: Pilgrim
Issue date: 04/01/2008
From: Racquel Powell
NRC/RGN-I/DRP/PB5
To:
NRC/RGN-I/DRP/PB5
Powell R, RI/DRP/610-337-6967
References
Download: ML080920243 (3)


Text

April 1, 2008 Meeting Summary LICENSEE: ENTERGY NUCLEAR OPERATIONS, INC.

FACILITY: PILGRIM NUCLEAR POWER STATION

SUBJECT:

SUMMARY

OF MARCH 26, 2008 ANNUAL ASSESSMENT MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC.

On March 26, at 6:00 p.m., an Annual Assessment Meeting was conducted at the Hilton Garden Inn in Plymouth, Massachusetts, between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc. (Entergy). The NRC requested the meeting with Entergy management to discuss the NRC=s assessment of the safety performance of Pilgrim Nuclear Power Station for the calendar year 2007.

The NRC presented and discussed its assessment of the safety performance of Pilgrim for the period between January 1 through December 31, 2007. The NRC presentation included information on the Reactor Oversight Process (ROP), summary of national performance assessment results, and the results of NRC=s performance assessment for Pilgrim. As part of this regulatory performance meeting, Entergy presented its perspective regarding the plant=s performance and operational goals for 2008.

The public was invited to observe this meeting. At the end of the meeting between the NRC and Entergy, public attendees were offered the opportunity to communicate with the NRC regarding Entergy=s performance at Pilgrim and the role of the agency in ensuring safe plant operations.

Questions from the public and the local media were also addressed by the NRC.

The NRC=s assessment letter can be found in ADAMS with an Accession Number of ML080630606. The annual assessment meeting notice with the attached meeting agenda can be found in ADAMS package ML080710068. The NRC slides for the meeting can be located in ADAMS with an Accession Number of ML080701135. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Raymond Powell, Chief Projects Branch 5 Division of Reactor Projects

Enclosures:

Meeting Attendees NRC Slides

2 Name Organization Jim Clifford Nuclear Regulatory Commission (NRC)

Ray Powell Nuclear Regulatory Commission (NRC)

Max Schneider Nuclear Regulatory Commission (NRC)

Nicole Sieller Nuclear Regulatory Commission (NRC)

Kevin Bronson Entergy Nuclear Operations, Inc.

Bob Smith Entergy Nuclear Operations, Inc.

Steve Bethay Entergy Nuclear Operations, Inc.

Brian Sullivan Entergy Nuclear Operations, Inc.

Joe Lynch Entergy Nuclear Operations, Inc.

Lauren Mauriello Massachusetts Affordable Reliable Electricity Alliance (AREA)

Mary Lampert Duxbury Nuclear Advisory Committee Rebecca Chin Duxbury Nuclear Advisory Committee Richard Rothstein Plymouth Nuclear Matters Committee Mark Sylvia Plymouth Town Manager John Giarusso, Jr. Massachusetts Emergency Management Agency (MEMA)

Stephen Delph Entergy Nuclear Operations, Inc.

2 Name Organization Jim Clifford Nuclear Regulatory Commission (NRC)

Ray Powell Nuclear Regulatory Commission (NRC)

Max Schneider Nuclear Regulatory Commission (NRC)

Nicole Sieller Nuclear Regulatory Commission (NRC)

Kevin Bronson Entergy Nuclear Operations, Inc.

Bob Smith Entergy Nuclear Operations, Inc.

Steve Bethay Entergy Nuclear Operations, Inc.

Brian Sullivan Entergy Nuclear Operations, Inc.

Joe Lynch Entergy Nuclear Operations, Inc.

Lauren Mauriello Massachusetts Affordable Reliable Electricity Alliance (AREA)

Mary Lampert Duxbury Nuclear Advisory Committee Rebecca Chin Duxbury Nuclear Advisory Committee Richard Rothstein Plymouth Nuclear Matters Committee Mark Sylvia Plymouth Town Manager John Giarusso, Jr. Massachusetts Emergency Management Agency (MEMA)

Stephen Delph Entergy Nuclear Operations, Inc.

Distribution R. Powell, DRP B. Norris, DRP N. Sieller, DRP M. Schneider, DRP, SRI B. Smith, DRP, RI A. Ford, DRP, OA SUNSI Review Complete: (Reviewer=s Initials)

DOCUMENT NAME: Pilgrim G:\DRP\BRANCH5\ANNUAL ASSESSMENT MEETING SUMMARIES\PILGRIM 2007 ANNUAL ASSESSMENT MEETING

SUMMARY

.DOC After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" =

No copy OFFICE R1/DRP R1/DRP NAME NSieller/NSS RPowell/RJP DATE 04/01/08 04/01/08 OFFICIAL RECORD COPY