February 19, 2020 LICENSEE: Holtec Decommissioning International, LLC FACILITY: Pilgrim Nuclear Power Station

SUBJECT:

SUMMARY

OF JANUARY 31, 2020, CLOSED MEETING WITH HOLTEC DECOMMISSIONING INTERNATIONAL, LLC, PRE-AMENDMENT MEETING REGARDING PROPOSED INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY PLAN CHANGE FOR THE PILGRIM NUCLEAR POWER STATION (EPID L-2019-LRM-0008)

The U.S. Nuclear Regulatory Commission (NRC) conducted a closed meeting with representatives of Holtec Decommissioning International, LLC (Holtec or the licensee) on January 31, 2020. The purpose of the meeting was to discuss a proposed license amendment request to revise the Pilgrim Nuclear Power Station (Pilgrim) Independent Spent Fuel Storage Installation (ISFSI) physical security plan.

The meeting was kicked off with opening remarks by the NRC staff, followed by introductions of the attendees. A list of attendees is provided in enclosure 1 and a publicly available version of the licensees presentation slides for this meeting are provided in enclosure 2.

Holtec plans to relocate the spent fuel casks on the current ISFSI pad to the new ISFSI pad on-site, located approximately 75 feet above sea level. Presently, the new ISFSI pad does not hold any spent fuel casks. Also, currently there is spent fuel located in the spent fuel pool. Holtec plans to remove the spent fuel in the pool and load it into casks bound for the new ISFSI pad on-site. Eventually, it plans to store all its spent fuel casks on the new ISFSI pad. Changes to its ISFSI physical security plan will be needed because its current ISFSI physical security plan addresses the existing ISFSI pad and fuel loading configuration.

During the meeting, Holtec reviewed each phase of its spent fuel campaign. Holtec also discussed its proposed physical security strategy for each new phase. The discussion of the proposed changes to the ISFSI physical security plan at Pilgrim contained safeguards information. Safeguards information is not made publicly available.

The review schedule identified in enclosure 2 is proposed by Holtec. The NRC staff informed Holtec that upon submittal of an application for amendment, NRC will perform an acceptance review to determine if the application is of sufficient quality for the staff to begin its detailed technical review. If accepted for technical review, the staff will determine the review schedule based on the complexity of the submittal and available resources. NRC also, takes into consideration any schedule needs identified by the licensee before finalizing the review schedule.

At this meeting, the NRC staff made no regulatory decisions regarding the merits of the proposed physical security plan change at Pilgrim.

Please direct any inquiries to me at (301) 415-6822 or Amy.Snyder@nrc.gov.

/RA/

Amy M. Snyder, Senior Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Reactor Regulation Docket No. 50-238

Enclosures:

List of Attendees Presentation slides cc: Listserv

SUBJECT:

SUMMARY

OF JANUARY 31, 2020, CLOSED MEETING WITH HOLTEC DECOMMISSIONING INTERNATIONAL, LLC, PRE-AMENDMENT MEETING REGARDING PROPOSED INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY PLAN CHANGE FOR THE PILGRIM NUCLEAR POWER STATION (EPID L-2019-LRM-0008), DATED: February 19, 2020 DISTRIBUTION:

PUBLIC RidsACRS_MailCTR Resource RidsOgcMailCenter Resource RidsRgn1MailCenter Resource JNicholson, RI HAnagnostopoulos, RI ADimitriadis, RI FBower, RI SMcCarver, RI VWilliams, NSIR DGarner, NSIR DDias-Toro, NMSS SWall, NRR ADAMS Accession Package No. ML20045D106 *via email OFFICE RBD/PM DUWP/LA* NSIR/DPCP/MSB/BC* RDB/BC* RBD/PM NAME ASnyder CHolston ARivera BWatson ASnyder DATE 2/13/20 2/19/20 2/14/20 2/14/20 2/19/20 OFFICIAL RECORD COPY

LIST OF ATTENDEES JANUARY 31, 2020, CLOSED MEETING WITH HOLTEC DECOMMISSIONING INTERNATIONAL, LLC REGARDING A PROPOSED REVISION TO THE INDEPENDENT SPENT FUEL STORAGE FACILITY PHYSICAL SECURITY PLAN PILGRIM NUCLEAR POWER STATION Name Affiliation Amy Snyder U.S Nuclear Regulatory Commission (NRC)

Alison Rivera NRC Vince Williams NRC Doug Garner NRC Sammy McCarver NRC Andrea Sterdis Holtec Decommissioning International, LLC (HDI, Holtec, or Licensee)

J. Scott Thomson HDI Kevin Traver Comprehensive Decommissioning, Inc.

Justin Corey Sargent & Lundy (S&L)

Shawn Brust S&L Enclosure

HOLTEC PUBLICLY AVAILABLE MEETING SLIDES (ML20045D109)