Forwards Insp Rept 50-267/88-23 on 880912-16 & Notices of Violation & Deviation
ML20155F446
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 10/05/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20155F449 List:
References
NUDOCS 8810130268
Download: ML20155F446 (2)


See also: IR 05000267/1988023

Text

. .

, .

OCT 51988

.

In Reply Refer To:

Docket: 50-267/88-23

Public Service Company of Colorado

ATTN: Robert 0. Williams, Jr.

Vice President, Nuclear Operations

2420 W. 26th Avenue Suite 15c

Denver, Colorado 80211

Gentlemen:

This refers to the inspection conducted by L. E. Ellershaw of this office

during the period September 12-16, 1988, at the General Atomics International

Services Corporation, San Diego, California, facility with respect to

activities authorized by NRC Operating License DPR-34 for the Fort St. Vrain

Nuclear Generating Station, and to discussion of our findings with Mr. G. L.

Redmond and other members of your staff and General Atonics personnel at the

conclusion of the inspection.

The area examined during the inspection dealt with General Atomics

,

refurbishment of one of the reactor helium circulators. Within this area, the <

l inspection consisted of selective examination of procedures and representative

! records, interviews with personnel, and observations by the NRC inspector. The

inspection findings are documented in the enclosed inspection report.  ;

I During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

,

the violation, in writing, in accordance with the provisions of Section 2.201

, of the NRC's "Rules of Practice," Part 2. Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

.

Also during this inspection, it was found that certain of your activities

I

appear to deviate from comitments made to the NRC. This item and references

I to the commitment is identified in the enclosed Notice of Deviation. You are

'

requested to respond to this deviation in writing. Your response shculd be

based on the specifics contained in the Notice of Deviation enclosed with this

letter.

We have also further examined previously identified inspection findings. The

status of these items is identified in paragraph 2 of the enclosed letter.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

  • R!Y:RI *C:MQPS *D:DRS D:

LEEllershaw/tw !Barnes JLMilhoan LJCallan t

/ /88 / /88 / /88 to/$/88

1 *Previously concurred

01 .

, I f

8810130260 001005 l

PDR ADOCK 05000267  ;

0 PNV

. .

. .

.

.

Public Service Company of Colorado -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Cr!vte! y,g pI

.

A P. h.ch

L. J. Callan, Director

Division of Reactor Projects

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - Notice of Deviation

, 3. Appendix C - NRC Inspection Report

50-267/88-23  ;

cc w/ enclosures:

Fort St. Vrain Nuclear Station

Manager, Nuclear Production Division

'

16805 WCR 19)

Platteville, Lolorado 80651

i

Fort St. Vrain Nuclear Station

P. Tomlinson, Manager, Quality

Assurance Division

(same address)

) C. Y. Cheng, Chief, Materials ,

Engineering Branch

-

R. A. Hermann Section Chief

,

Materials Engineering Branch  !

-

.

1 '

i F. B. Litten, Materials Engineering

Br. inch

Colorado Radiation Control Program Director

i Colorado Public Utilities Conmission  !

i bec to DMB (IE01) l'

bec distrib, by RIV-

  • RRI *R. D. Martin, RA
  • Section Chief (DRP/B) * Project Engineer DRP/B

,

  • DSB-DRSS lisa Shea, RM/ALF

j * MIS System *RSTS Operator j

  • K. Heitner, NRR Croject Manager *RIV File i

j *DRS *DRP 1

*L. E. Ellershaw *I. Barnes i

1

  • w/766

,