Category:INSPECTION REPORT
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items IR 05000424/19930031993-03-17017 March 1993 Insp Repts 50-424/93-03 & 50-425/93-03.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Refueling Activities IR 05000424/19920311993-01-26026 January 1993 Insp Repts 50-424/92-31 & 50-425/92-31 on 921129-930102. Noncited Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint,Review of SNM Accountability Program & Review of LERs & Followup IR 05000424/19920281993-01-0505 January 1993 Insp Repts 50-424/92-28 & 50-425/92-28 on 921130-1204. Violations Noted.Major Areas Inspected:Rp Program Activities Associated W/Llrw Processing,Temporary Storage & Transportation,Liquid & Gaseous Effluent Monitor 1999-08-16
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items IR 05000424/19930031993-03-17017 March 1993 Insp Repts 50-424/93-03 & 50-425/93-03.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Refueling Activities IR 05000424/19920311993-01-26026 January 1993 Insp Repts 50-424/92-31 & 50-425/92-31 on 921129-930102. Noncited Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint,Review of SNM Accountability Program & Review of LERs & Followup IR 05000424/19920281993-01-0505 January 1993 Insp Repts 50-424/92-28 & 50-425/92-28 on 921130-1204. Violations Noted.Major Areas Inspected:Rp Program Activities Associated W/Llrw Processing,Temporary Storage & Transportation,Liquid & Gaseous Effluent Monitor 1999-08-16
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items IR 05000424/19930031993-03-17017 March 1993 Insp Repts 50-424/93-03 & 50-425/93-03.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Refueling Activities IR 05000424/19920311993-01-26026 January 1993 Insp Repts 50-424/92-31 & 50-425/92-31 on 921129-930102. Noncited Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint,Review of SNM Accountability Program & Review of LERs & Followup IR 05000424/19920281993-01-0505 January 1993 Insp Repts 50-424/92-28 & 50-425/92-28 on 921130-1204. Violations Noted.Major Areas Inspected:Rp Program Activities Associated W/Llrw Processing,Temporary Storage & Transportation,Liquid & Gaseous Effluent Monitor 1999-08-16
[Table view] Category:UTILITY
MONTHYEARML20058E8901990-10-25025 October 1990 Insp Repts 50-424/90-27 & 50-425/90-27 on 901016-17. Violations Confirmed.Major Areas Inspected:Physical Protection of Safeguards Info in Response to licensee- Identified & Reported Safeguards Event IR 05000424/19900201990-10-25025 October 1990 Insp Repts 50-424/90-20 & 50-425/90-20 on 900825-0928. Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Refueling Operations,Review of LERs & Followup on Previous Insp Findings IR 05000424/19900261990-10-17017 October 1990 Insp Repts 50-424/90-26 & 50-425/90-26 on 901009-12. Noncited Violation Noted.Major Areas Inspected:Inservice Insp (ISI) & ISI Implementing Procedures IR 05000424/19900171990-09-18018 September 1990 Insp Repts 50-424/90-17 & 50-425/90-17 on 900630-0824.No Specific Strengths or Weaknesses Identified.Major Areas Inspected:Plant Operations,Radiological Controls,Maint, Surveillance,Security & Quality Programs IR 05000424/19900151990-08-29029 August 1990 Insp Repts 50-424/90-15 & 50-425/90-15 on 900727-0803. Violations Noted.Major Areas Inspected:Observation & Evaluation of Annual Emergency Response Exercise IR 05000424/19900161990-07-26026 July 1990 Insp Repts 50-424/90-16 & 50-425/90-16 on 900709-13.No Violations Noted.Major Areas Inspected:Radiolgical Emergency Response Plan & Implementing Procedures,Emergency Facilities,Equipment,Instrumentation & Supplies IR 05000424/19900131990-07-18018 July 1990 Insp Repts 50-424/90-13 & 50-425/90-13 on 900519-0629. Violations Noted But Not Cited.Major Areas Inspected:Plant Operations,Radiological Controls,Maint,Surveillance,Quality Programs,Security & Administrative Controls IR 05000424/19900141990-07-0202 July 1990 Insp Repts 50-424/90-14 & 50-425/90-14 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected: Radiological Effluents,Environ Monitoring,Plant Chemistry & post-accident Sampling Sys ML20058G4491990-06-13013 June 1990 Insp Repts 50-424/90-10 & 50-425/90-10 on 900331-0518. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security,Quality Programs & Administrative Controls Affecting Quality IR 05000424/19890231989-09-12012 September 1989 Partially Withheld Insp Repts 50-424/89-23 & 50-425/89-27 on 890731-0803 (Ref 10CFR2.790(d) & 73.21).Violation Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Procedures,Protected & Vital Area Barriers & Testing IR 05000424/19890211989-08-0404 August 1989 Insp Repts 50-424/89-21 & 50-425/89-25 on 890725-27.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Exercise,Including Selected Portions of Staffing & Response of Emergency Organization Personnel in Simulator ML20248C8591989-07-31031 July 1989 Insp Repts 50-424/89-19 & 50-425/89-23 on 890609-0707.Four Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security & Quality Programs & Administrative Controls Affecting Quality IR 05000424/19890201989-07-21021 July 1989 Insp Repts 50-424/89-20 & 50-425/89-24 on 890626-30. Violation Noted.Major Areas Inspected:Design,Design Changes & Plant Mod IR 05000424/19890181989-07-12012 July 1989 Insp Repts 50-424/89-18 & 50-425/89-21 on 890612-16.No Cited Violations Noted.Major Areas Inspected:Emergency Preparedness Program to Determine If Program Maintained in State of Operational Readiness IR 05000424/19890151989-06-30030 June 1989 Insp Repts 50-424/89-15 & 50-425/89-17 on 890522-26.No Violations Noted.Major Areas Inspected:Occupational Exposure,Shipping & Transportation & Radiation Protection Startup.Weakness Noted in Quality of Audit Program IR 05000425/19890221989-06-25025 June 1989 Insp Rept 50-425/89-22 on 890612-16.No Violations Noted. Major Areas Inspected:Review of Completed Startup Tests & Closeout of Startup Test Insp Program IR 05000424/19890161989-06-21021 June 1989 Insp Repts 50-424/89-16 & 50-425/89-18 on 890506-0608. Violations Noted.Major Areas Inspected:Plant Operations, Startup (Unit 2),radiological Controls,Maint,Surveillance, Security & Quality Programs & Administrative Controls ML20245F4231989-06-15015 June 1989 Insp Repts 50-424/89-14 & 50-425/89-15 on 890318-0505. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls/Chemistry,Maint,Surveillance & Security & Administrative Controls Affecting Quality ML20245D8671989-06-14014 June 1989 Insp Rept 50-425/89-20 on 890516-20.No Violations or Deviations Noted.Major Areas Inspected:Response to Loss of Transient on 890514,review of Completed Startup Tests & Witnessing of 100% Loss of Load Test ML20245H8361989-06-0909 June 1989 Partially Withheld Insp Repts 50-424/89-17 & 50-425/89-19 on 890515-19 (Ref 10CFR2.790(d) & 73.21).Violations Noted Re Access Controls.Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Vital Area Access Controls IR 05000425/19890161989-05-0404 May 1989 Insp Rept 50-425/89-16 on 890327-31 & 0410-13.No Violations or Deviations Noted.Major Areas Addressed:Review of Completed,Precritical Tests,Witnessing of Initial Criticality & of Shutdown from Outside Control Test Room IR 05000424/19890131989-04-24024 April 1989 Insp Rept 50-424/89-13 on 880808-0912.Violations Noted.Major Areas Inspected:Review of 11 Inspector Followup Items & Program Weaknesses Identified in Operational Performance Assessment IR 05000424/19890121989-04-19019 April 1989 Insp Repts 50-424/89-12 & 50-425/89-14 on 890313-17.No Violations or Deviations Noted.Major Areas Inspected:Snubber Surveillance Program,Unit 2 Containment Structural Integrity Test Program & Piping Vibration Testing Program IR 05000424/19890101989-04-11011 April 1989 Insp Repts 50-424/89-10 & 50-425/89-12 on 890218-0317. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security & QA Programs & Administrative Controls Affecting Quality IR 05000424/19890111989-04-10010 April 1989 Insp Rept 50-424/89-11 & 50-425/89-13 on 890307-10 & 29-31. No Violations or Deviations Noted.Major Areas Inspected: Proposed Startup Tests for Unit 2 & Followup of Previous Violation on Unit 1 IR 05000424/19890081989-04-0707 April 1989 Insp Repts 50-424/89-08 & 50-425/89-11 on 890204-10.No Violations Noted.Major Areas Inspected:Nrc Bulletin Followup,Diesel Generator Fuel Oil,Containment Isolation Sys Testing & Followup Actions on Previous Insp Findings IR 05000424/19890071989-03-14014 March 1989 Insp Repts 50-424/89-07 & 50-425/89-10 on 890121-0217. Licensee Identified Violations Noted.Major Areas Inspected: Plant Operations,Radiological Controls,Maint,Surveillance, Security & Initial Fuel Load IR 05000424/19890091989-03-10010 March 1989 Partially Withheld Insp Rept 50-424/89-09 on 890202-03 (Ref 10CFR2.790(d) & 73.21).Violations Noted:Badges of Terminated Employees Not Removed from Badge Issue Area.Major Areas Inspected:Badge Access Areas IR 05000321/19880371989-03-0909 March 1989 Partially Withheld Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Operational Activities & Safeguards Matl Handling IR 05000424/19890021989-03-0202 March 1989 Insp Repts 50-424/89-02 & 50-425/89-02 on 890208-14.No Violations or Deviations Noted.Major Areas Inspected: Witnessing Initial Fuel Load of Unit 2 & Review of Proposed Startup Tests for Unit 2 IR 05000425/19890081989-02-28028 February 1989 Insp Rept 50-425/89-08 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected:Preoperational Testing,Preoperational Test Results Evaluation & Followup on NRC Bulletins 88-004 & 81-02 ML20247C0031989-02-23023 February 1989 Insp Repts 50-424/89-03 & 50-425/89-03 on 890109-13. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Licensee Identified 10CFR50.55 Items & NRC Bulletin 80-08 (Unit 2) IR 05000425/19890091989-02-21021 February 1989 Insp Rept 50-425/89-09 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected:Qa Coverage for Startup Testing & Licensee Action on Previously Identified Items IR 05000424/19890051989-02-21021 February 1989 Insp Repts 50-424/89-05 & 50-425/89-06 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected: Confirmatory Radiological Measurements for Units & Preoperational Sys Tests for Unit 2 IR 05000425/19880781989-02-16016 February 1989 Insp Rept 50-425/88-78 on 881219-22.No Violations Noted. Major Areas Inspected:Preservice Insp Program & Procedure Review,Housekeeping,Matls Identification & Control & Action on Previous Insp Findings IR 05000425/19890041989-02-15015 February 1989 Insp Rept 50-425/89-04 on 880109-12.No Violations or Deviations Noted.Major Areas Inspected:Fire Prevention & Protection & Review of Previously Identified NRC Open Items ML20235L1921989-02-10010 February 1989 Insp Repts 50-424/88-61 & 50-425/88-79 on 881217-890120. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Fire Protection, Security,Preoperation Testing & Quality Programs ML20235L6991989-02-0707 February 1989 Insp Repts 50-424/89-01 & 50-425/89-01 on 890117-19.No Violations or Deviations Noted.Major Areas Inspected:Util Response to Improvement & Incomplete Items Identified in Unit 2 Emergency Preparedness Implementation Appraisal IR 05000424/19880551989-02-0202 February 1989 Insp Repts 50-424/88-55 & 50-425/88-71 on 881212-16 & 890103-06.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Radwaste Treatment Sys & Effluent Monitoring Sampling Sys & Environ Radiological Monitoring IR 05000425/19880651988-11-30030 November 1988 Insp Rept 50-425/88-65 on 881024-28.No Violations or Deviations Noted.Major Areas Inspected:Containment Local Leak Rate Preoperational Test Program Review & Reactor Protection Sys Preoperational Test Procedure Review IR 05000424/19880441988-11-28028 November 1988 Insp Rept 50-424/88-44 on 881001-28.Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls, Maint,Surveillance,Fire Protection,Security,Outage,Quality Programs & Administrative Controls Affecting Quality ML20196E0821988-11-25025 November 1988 Insp Repts 50-424/88-46 & 50-425/88-61 on 881017-21.No Violations Noted.Major Areas Inspected:Radiological Effluents & Plant Chemistry IR 05000425/19880671988-11-23023 November 1988 Insp Rept 50-425/88-67 on 881031-1103.No Violations or Deviations Noted.Major Areas Inspected:Closeout of Readiness Review Modules 6,12,17/19 & 20 Findings IR 05000424/19880491988-11-22022 November 1988 Insp Repts 50-424/88-49 & 50-425/88-59 on 881017-20.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Licensee Actions Re Implementation of Plant Safe Shutdown Guidance Provided in SRP 9.5-1 IR 05000425/19880571988-11-17017 November 1988 Insp Rept 50-425/88-57 on 881003-07 & 11-14.No Violations or Deviations Noted.Major Areas Inspected:Preoperational & Hot Functional Test Witnessing,Preoperational Test Procedure Review & Licensee Action on Previous Insp Findings IR 05000424/19880381988-11-16016 November 1988 Insp Repts 50-424/88-38 & 50-425/88-42 on 880815-19. Violations Noted.Major Areas Inspected:Site & Corporate Emergency Preparedness Programs & Identification of Programmatic Differences &/Or Changes Specific to Unit 2 IR 05000425/19880581988-11-16016 November 1988 Partially Withheld Insp Rept 50-425/88-58 on 881024-27 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Physical Security Plan & Implementing Procedures, Security Organization,Testing & Maint & Physical Barriers IR 05000424/19880451988-11-15015 November 1988 Insp Rept 50-424/88-45 on 881017-21.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp, Including Review of Inservice Insp Program,Plan for Outage & Review of NDE Procedures IR 05000425/19880561988-11-15015 November 1988 Insp Rept 50-425/88-56 on 880913-1031.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection, Piping Sys & supports,safety-related Components,Auxiliary Sys,Electrical Equipment,Raceways & Instrumentation IR 05000425/19880491988-10-13013 October 1988 Insp Rept 50-425/88-49 on 880822-0901.Violations Noted.Major Areas inspected:1 of 11 Readiness Review Modules as Part of Pilot Readiness Review Program Per Recommendations in NUREG-1055 1990-09-18
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20207L8511999-03-0808 March 1999 Notice of Violation from Insp on 990125-27.Violation Noted: on Numerous Occasions from Mar 1997 to Oct 1998,select Response Force Officers Were Posted in Locations That Would Not Permit Them to Interpose Themselves Between Intruder IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors ML20155A7621998-10-15015 October 1998 Notice of Violation from Insp on 980816-0926.Violation Noted:On 980824,licensee Failed to Adequately Establish Sufficient Procedural Control for Demolition of Concrete Missile Barrier IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20154C5131998-09-10010 September 1998 Notice of Violation from Insp on 980628-0815.Violation Noted:Corrective Actions Taken in Response to Violations Associated with Entry Into TS LCO for Maint & Surveillances Activities Were Inadequate to Preclude Repetition IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20236T5871998-07-23023 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:On 980419,Unit 2 Entered Mode 2 W/O Meeting LCO of TS 3.3.2,which Requires Two Trains of Turbine Trip Function to Be Operable Prior to Entering Mode 2 IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19983021998-07-21021 July 1998 NRC Operator Licensing Exam Repts 50-424/98-302 & 50-425/98-302 for Tests Administered on 980721 ML20236H3971998-06-15015 June 1998 Notice of Violations from Insp on 980419-0516.Violations Noted:On 980415,upon Identification That 1 of 3 Letdown Orifice Isolation Valves Would Not Open,Unit 2 Uss Proceeded to Allow Operation of Unit in Water Solid Conditions ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-032, on 980609,electrical Fault on 2C Condensate Pump Motor Caused Loss of 1NAB 13.8KV Bus.Fault Also Caused Main Generator Trip,Turbine Trip & Reactor Trip.Reactor Coolant Pump 2 & 4 Lost Power Because of Bus Loss1998-06-10010 June 1998 PNO-II-98-032:on 980609,electrical Fault on 2C Condensate Pump Motor Caused Loss of 1NAB 13.8KV Bus.Fault Also Caused Main Generator Trip,Turbine Trip & Reactor Trip.Reactor Coolant Pump 2 & 4 Lost Power Because of Bus Loss ML20247K7531998-05-15015 May 1998 Notice of Violation from Insp on 980308-0418.Violation Noted:On 980401,Procedure PT-V-605,was Not Properly Implemented,In That,Liquid Penetrant pre-exam Cleaning for Safety Injection Sys Weld 21204-122-6 Was Inadequate IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19983011998-05-0707 May 1998 NRC Operator Licensing Exam Repts 50-424/98-301 & 50-425/98-301 on 980413-15.Exams Results:All Candidates Passed Tests Except for One SRO ML20216J6611998-04-0202 April 1998 Notice of Violation from Insp on 980125-0307.Violation Noted:On 980219,Unit 2 Shift Supervisor Authorized Maint on Control Room Emergency Filtration Sys Train B W/O Recognizing Work Would Render Train Inoperable IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-II-98-017, on 980320,female Contract Worker Found Unconscious at Bottom of man-lift Station in Turbine Bldg. Plant First Aid Team Responded & Ambulance Was Called. Injured Person Transported to Hosp & Pronounced Dead1998-03-20020 March 1998 PNO-II-98-017:on 980320,female Contract Worker Found Unconscious at Bottom of man-lift Station in Turbine Bldg. Plant First Aid Team Responded & Ambulance Was Called. Injured Person Transported to Hosp & Pronounced Dead IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M3681998-01-12012 January 1998 Notice of Deviation from Insp on 971102-1213.Deviation Noted:Since Initial Startup of Both Units 1 & 2,licensee Failed to Perform 18-month Surveillance Testing on Reactor Coolant Pump 125V Direct Current non-1E Control Breakers ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint ML20198M3401998-01-12012 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:Since Initial Startup of Both Units 1 & 2,procedures 14420-1/2 & 14421-1/2 Inadequate ML20202E1971997-11-26026 November 1997 Notice of Violation from Insp on 970921-1101.Violation Noted:On 971003,10 Unit Heater Breakers on MCC 1NBG Were Found Open & Not Tagged IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20212F3471997-10-20020 October 1997 Notice of Violation from Insp on 970803-0920.Violations noted:54 Fire Extinguishers W/Insp Sticker ,were Issued Between 970730 & 0815 & Did Not Meet Insp Criteria of Procedure 92020-C ML20211F2501997-09-15015 September 1997 SALP Repts 50-424/97-99 & 50-425/97-99 for Vogtle Electric Generating Plant for 960128-970802 ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210S0551997-08-28028 August 1997 Notice of Violation from Insp on 970706-0802.Violation Noted:On 970708,during Maint on Shaft Seal in Unit 1 Personnel Airlock,Licensee Failed to Document Entry Into Appropriate Action Condition for TS LCO 3.6.2 ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20210N6521997-08-14014 August 1997 Notice of Deviation from Insp on 970623-27.Deviation Noted: Incidents or Events Associated W/Ufsar Section 17.2.1.1.1.F & H Were Not Reviewed on 961218 & 970430 Srb Meetings ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198F8551997-08-0404 August 1997 Notice of Violation from Insp on 970601-0705.Violation Noted:Six Individuals Reported for Duty to ERFs & Failed to Complete sign-in Sheets on 970527,during Performance of Recall Emergency Drill ML20141F6971997-06-24024 June 1997 Notice of Violation from Insp on 970427-0531.Violation Noted:Time Between Performances of Procedure 29100-C,for Visual Insp of Fire Extinguishers & Fire Hose Stations, Exceeded 31 Days ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20140B3951997-05-21021 May 1997 Notice of Violation from Insp on 970316-0426.Violation Noted:Between 970329 & 0404,numerous Examples of Unattended & Unevaluated Debris Have Been Identified & Eight EPIP Revs Had Not Been Distributed ML20138J4161997-04-25025 April 1997 Notice of Violation from Insp on 970210-0307.Violation Noted:Licensee Offered for Transportation by exclusive-use, Closed Transport Vehicle,Package Which Arrived Having Max Surface Radiation Levels Exceeding 10 Msv/Hr ML20137X3751997-04-14014 April 1997 Notice of Violation from Insp on 970202-0315.Violation Noted:Positions of Valves 2-1302-U4-180 - 185 Not Verified Every 31 Days as Required ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support 1999-08-16
[Table view] |
Inspection Report - Vogtle - 1988025 |
---|
|
|
Text
, , , _
., p sur y i UNITED STATES
'
_g j
NUCLEAR REGULATORY COMM190N o, REGION ll g e,,,, [ 101 MARtETTA ST., ATLANTA. GEORGIA 30323 Report No.: 50-425/88-25 Licensee: Georgia Power Company P. O. Box 4545 Atlanta, GA 30302 Docket No.: 50-425 License No.: CPPR-109 Facility Name: Vogtle 2 Inspection Conducted: May 2 - 6, 16 - 20, 1988 Inspecto h & $71LLs
. Mo~ ore (o 33l8@>
D6te Signed
.
Approved by: W g 6 [
Date/ Signed G.'A. Belislet chief Quality Assurance Programs Section Division of Reactor Saft.ty SUM 4ARY Scope: This routine, unannounced inspection was conducted in the areas of design changes and modifications, tests and experiments, measuring and test equipment, surveillance testing and calibration control, and document contro Results: Adequate programs existed for Unit 2 activities related to design changes and modifications, tests and experiments , measuring and test equipment, and document con trol . The surveillance testing and calibration control program is currently being developed. Due to its not being fully established, IFIs were identified in the following areas:
Master surveillance schedule incomplete, paragraph Surveillance task procedures incomplete, paragraph TS/LC0 component Ifst and incorporation into calibration control program incomplete, paragraph Operations procedures for surveillances of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or less incomplete, paragraph In the areas inspected, violations or deviations were not identifie PDR ADOCK 05000425 O PDC
_ - _ _ _ _ _
.
,
.o ..
?; .
.
. ,
,
REPORT DETAILS Persons Contacted Licensee Employees J. Aufdenkampf, Deputy Superintendent - Engineering Support
- M. Bellamy, Plant Manager
- G. Bockhold, General Manager J. Bowden, Surveillance Tracking Coordinator E. Burns, ISI Valve Test Coordinator A. Caudill, Senior Engineer, ISI
- T. Greene, Plant Support Manager
~*M. Griffis, Maintenance Manager
- E. Groover, QA Site Manager-Construction M. Hobbs, I&C Superintendent
- R. Lide, Engineering Support Superintendent
- A. Mosbaugh, Assistant Plant Support Manager B. Quick, Document Control Supervisor B. Wyre, PM Coordinator Other licensee employees contacted during this inspection included engineers, mechanics, technicians, and administrative personne NRC Resident Inspectors
,
- Attended exit interview Design Changes and Modifications (35744)
References: CFR 50 Appendix B, Quality Assurance Criteria for Nuclear Power Plants, CFR 50.59, Changes, Tests and Experiments Regulatory Guide 1.33, Quality Assurance Requirements .
(Operations) ANSI N18.7-1976, Administrative Controls and Quality Assurance for the Operations Phase of Nuclear Power Plants, Regulatory Guide 1.64, Quality Assurance Requirements for the Design of Nuclear Power Plants ANSI N45.2.11-1974, Quality Assurance Requirements for the Design of Nuclear Power Plants
, .
- -
'*
.j' ..
.
.
.
2 FSAR Section 17, Quality Assurance Program, Amendment 3 VEGP Quality Assurance Manual, Section 3, Design Control, Revision 10 The inspector program requiredreviewed the licensee's by references desig(n (a) through change h) to and modification detemine if these activities were conducted in accordance with regulatory requirements, industry guides and standards, and TS. The following criteria were used during the review to determine the overall acceptability of the established program:
- Procedures iave been established to control design changes and modifications which include assurance that a proposed change does not involve an unreviewed safety question or change in TS as required by 10 CFR 50.5 Procedures and responsibilities for design control have been established including:
Identification of organizations or persons responsible for performing design work and conducting safety evaluation Procedures and responsibilities for identifying, reviewing and approving design input requirement Methods, procedures, and responsibilities for performing independent design verification Design interfaces (internal and/or external) are established in writin ' Responsibility for final approval of design document Review of design change is commensurate with the original design revie Administrative controls for design document control have been established for the following:
Controlling changes to approved design change document Release and distribution of approved design change document Controlling or recalling obsolete design change document Administrative controls and responsibilities have been established comensurate with the time frame for implementation to assure that design changes will be incorporated into:
Plant procedure ___ _ _ ______ - _ _ _ _
.." ..
. ; .-
.
.
Operator training program Plant drawings to reflect implemented design changes and modi fication ' Design controls require that implementation will be in accordance with approved procedure Design controls require- assigning responsibility for identifying post-modification testing requirements and acceptance criteria in approved test procedures and for evaluation of test result ,
- Procedures assign responsibility to delineate the method for reporting design changes to the NRC in accordance with 10 CFR 50.5 Controls require review and approval of temporary modifications in accordance with 10 CFR 50.5 Controls require that a formal record be maintained of the status of temporary modifications, lif ted leads and jumpers, temporary trip points of control equip, et Controls require periodic reviews of lifted leads and jumper The documents listed below were reviewed to verify that these criteria had been incorporated into the licensee's design program:
Nuclear Operations Modification Manual, Revision 0 00001-C Plant Organization; Management Staff Responsibilities and Authority, Revision 3 00002-C Plant Review Board Duties and Responsibilities, Revision 4 00056-C Safety and Environmental Evaluations, Revision 6T 00101-C Drawing Control, Revision 5 00100-C Quality Assurance Records Administratioii, Revision 7 00306-C Temporary Jumper and lifted Wire Control, Revision 6T 00307-C Temporary Modifications, Revision 3
.00350-C Maintenance Program, Revision 8 00400-C Plant Modifications, Revision 7 50002-C Processing Requests for Engineering Reviews, Revision 3
, --- - _ _ - - - - - . - - - - - _ - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - _ - - . _ _ _ . - - - - - - - _ - - - - - - - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _
'
-
.:' ,,
.
.
50005-C Requests for Engineering Assistance, Revision 1 50006-C Preparation for Design Change Requests, Revision 2 50007-C - Engineering Review of Design Change Packages, Revision 2 50008-C DCP Implementation and Closure, Revision 2 50010-C Field Change Requests, Revision 1 SCS 010604.4-9 Design Verification, October 31, 1987 SCS 010604.4-1 Establishment of Design Input Requirements, October 31, 1987 The onsite design group, Engineering Support, functions primarily to provide engineering assistance to onsite groups, i.e. Deficiency Report resolutions, and the implementation and approval of corporate developed DCP Discussions with the Engineering Support management indicated that all DCP development is accomplished by the corporate design group, PFE-0, in conjunction with the A/E, Bechtel Power Corporation and Southern Company Services. The procedure to provide guidance for onsite development of DCPs, 50016-C, which would implement ANSI N45.2.11 requirements for the design process, is in the draf t stag The Design Change Request procedur C, therefore directs all DCPs to the corporate design organization for development. Following approval of procedure 50016-C, minor design changes,."noncomplex changes which do not change the system as described in the FSAR," will be accomplished by the onsite design grou The internal and external interface mechanisms utilized are RERs, REAs, and DCRs. The associated procedures for these mechanisms in conjuncticn with the Modifications Administrative Procedure, 00400-C, and the Nuclear Operations Modifications Manual provide adequate delineation of interface activities and responsibilitie A DCP received from the corporate design organization is assigned to an implementation coordinator from the ES staff. The coordinator implements the DCP by developing post modification test procedures to meet the specified acceptance criteria, initiates MW0s to authorize work to implement the necessary changes, and verifies DCP completion including drawing revisions, training requirements, and required documentation. The work planning group develops schedules and procedures to implement require-ments of the MW0s generated by the I&C group. Procedures reviewed by the inspector provided adequate guidance for the onsite DCP implementation and approval proces Within this area, no violations or deviations were identifie ;
- ------- _-_
em
-
.
' *
.
. , ,.
.
.
5 Test and Experiments (35749)
References: CFR 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants CFR 50.59, Changes, Tests and Experiments Regulatory Guide 1.33, Quality Assurance Requirements (0perations) ANSI N18.7-1976, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plant ANSI N45.2.8-1985, Supplementary Quality Assurance Requirements for Installation, Inspection and Testing of Mechanical Equipment and Systems for the Construc-tion Phase of Nuclear Power Plants FSAR Section 17 and 14, QA Program and Start-up Test Procedures, Amer.dment 35 VEGP QA Manual, Revision 10 The inspector reviewed the licensee's test and experiments program required by references (a) through (g) to determine if the program was in conformance with regulatory requirements and industry guides and standard The following criteria were used during this review to assess the acceptability of the program:
- A formal method has been established to handle all requests or proposals for conducting plant tests involving safety-related componen ts .
- Provisions have been made to assure that all tests will be performed in accordance with approved written procedure Responsibilities have been assigned for reviewing and approving test procedure A formal system, including assignment of responsibility, has been established to assure that all proposed tests will be reviewed to determine whether they are as described in the FSA Responsibilities have been assigned to assure that a written safety evaluation required by 10 CFR 50.59 will be developed for each test to assure that it does not involve an unreviewed safety question or a change in Technical Specifications.
.
_ _ _ _ _ _ - ___ __________ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ - _ - - _ - .
.. .
e
'
- Responsibilities have been assigned to assure that all test and experiments are reported as required by applicable guidelines and instruction The documents listed below were reviewed to determine if the previously listed ' criteria had been incorporated into the licensee's test and experiments progra C Plant Review Board - Duties and Responsibilities Revision 7 00053-C Temporary Procedures, Revision 1 50002-C Processing Requests for Engineering Reviews, Revision 3 50005-C Requests for Engineering Assistance, Revision 1 50014-C Test or Experiment Request, Revision 1
'0056-C Safety Evaluations. Revision 6T 00157-C Routine Annual Reports, Revision 1 The inspector's review of applicable procedures indicated an adequate program was approved and in place for special test and experiment Discussions with engineering management indicated that site pcrsonnel were knowledgeable of the test and experiments program, its requirtments, and applicability to plant activitie Within the area, no violations or deviations were identifie . MeasuringandTestEquipment(35750)
References: CFR 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants VEGP FSAR Amendment 35 Regulatory Guide 1.33, Quality Assurance Program Requirements (Operations) ANSI-1976, Adminis tra tive Controls and Quality Assurance for the Operations Phase of Nuclear Power Plants Regulatory Guide 1.30 Quality Assurance Requirements i for the Installation. Inspection and Testing of Instrumentation and Electrical Equipment ANSI N45.2.4-1972 IEEE Standard, Installation, Inspection, and Testing Requirements for
!
Instrumentation and Electrical Equipment During the
! Construction of Nuclear Power Generating Stations l
I l
. _ _ _ _ _ _ _ . - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . __ ______________ . _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ . - - _ _ _ _ _ _ _ _
i'
. .
.
F
The Inspector reviewed the M&TE program required by references (a) through (f) to determine if the program had been established in accordance with regulatory-requirements and industry guides and standards. The following criteria were used during this ~ review to determine the overall acceptability of the program being established:
- Responsibility was delegated and criteria established to assign and adjust calibration frequency for each type of M&T An equipment inventory list identified each specific piece of M&TE, its ic ation, and the reference standard used for calibratio A method was delineated for ' documenting M&TE calibration history including:
Traceability to the calibration source As-found and as-calibrated data Identification of calibration procedure used Date of calibration Date of next calibration Name of person performing calibratio Identification of calibration standard used and their traceability to nationally recognized standards or basis for calibration if no national standard exist Formal requirements exist for marking the latest calibration deta on each piece of equipmen The program required that each piece of equipment was calibrated on 4 or before the date specified or stored in a location separate from inservice M&T Written requirements prohibited the use of M&TE which had not been calibrated within the prescribed frequenc When M&TE was found out of calibration, the program required documented evaluations to determine the cause of the out-of-calibration condition and the acceptability of items previously teste The program assured that new M&TE was added to the inventory list and calibrated prior to us The documents listed below were reviewed to determine if these criteria had been incorporated into the M&TE program:
00100-C QA Records Administration, Revision 7 00208-C Control of M&TE, Revision 3
. _ - - . _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ -________ _______---___ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
. , ..
.
.
20230-C Control of Instrument Shop M&TE, Revision 6T 20235-C M&TE Comparison Calculation, Revision 0 31005-C Test Standard Calibration Scheduling Program, Revision 2 31025-C Control of Chemistry M&TE, Revision 7 i
85303-C Quality Control of M&TE Calibration Control, Revision 3 43500-C Health Physics Instrument Calibration and Control Program, Revision The M&TE administrative procedure, 00208-C, specifically stated that the M&TE calibration program did not include permanently installed plant instrumentation. Discussicns with maintenance management indicated that permanently installed instrumentation utilized to verify TS or LC0 requirements would be included in the PM program for calibration control ,
The site procurement manual required the purchase of M&TE equipment and services to be from a vendor en the qualified suppliers lis The ,
inspector reviewed a sample of M&TE calibration procedures to determine the adequacy of calibration instructions. The guidance provided was adequate for performing designated calibration tasks and the required data sheets sufficiently documented calibration performance. The Unit 2 calibration program in place was adequate for plant calibration activit !
Within this area, no violations or deviations were identifie . Surveillance Testing And Calibration Control (35745) ,
)
References: CFR 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants ANSI N18.7-1976, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants Regulatory Guide 1.33, Quality Assurance Program Requirements (Operations) VEGP-FSAR, Section 17, Amendment 35 VEGP-QA Manual, Section 11, Test Control, Revision 10 The inspector reviewed the licensee's surveillance testing and calibration control program required by references (a) through (e) to determine if the program had been established in accordance with regulatory requirements, industry guides and standards, and TS. The following criteria were used during this review to determine the overall acceptability of the estab-lished program:
.
' -
..
l
-
l
.
l
- The master schedule for surveillance testing and calibration control delineated test frequency, current status, and responsibilities for performanc Fonnal requirements were established for conducting surveillance tests, calibrations, and inspections in accordance with approved procedures which include acceptance criteri Formal methods and responsibilities were established for review and evaluation of surveillance test data including procedures for reporting deficiencies, failures, malfunctions, et Responsibilities were assigned to maintain the master schedule up-to-date and to ensure th? required tests are performe Fonnal methods and responsibilities were established for calibrating components associated with safety-related systems or functions but which are not specified in TS as requiring calibratio A master schedule or equivalent for those components was established that includes:
Calibration frequency for each componen Plant group responsible for calibratio Calibration statu Responsibility was established for maintaining the TS component list calibration schedule and procedures were utilized to perfonn calibration The documents listed below were reviewed to determine if these criteria were incorporated into the surveillance testing and calibration ccatrol program:
00404-C Surveillance Test Program, Revision 8 00411-C Preservice and Inservice Inspection Program, Revision 3 00412-C Preservice and Inservice Testing Program, Revision 4 20015-C Planned Maintenance, Revision 8 20100-C ASME Section XI Repair / Replacement Program, Revision 1 20150-C Deficiency Reports, Revision 8 50029-C Trending and Evaluation of Pump and Valve Test Data, Revision 2
, _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _
y
' " '
. . . .
.
1 50013-C Engineering Surveillance Procedure Writer's Guide, Revision 3 30090-C Chemistry TS Surveillance -Performance Coordination, I Revision 5 The inspector reviewed the surveillance testing and calibration control l program established by those procedures reviewed. The administrative aspects of the program were adequate; however, the Unit 2 applicability i
- has not been fully identified in several area The licensee is in the process of identifying all Unit 2 systems and components that are required to be in the surveillance testing progra These are being entered into the Unit 2 Master Surveillance Schedule and until the Unit 2 Master Surveillance Schedule is completed, this is identified as IFI 425/88-25-0 The licensee is in the process of preparing Unit 2 procedures for system
! and componelt surveillances and until these procedures are completed, this l- is identified as IFI 425/88-25-02 Safety-related instrumentation required by TS but not specifically identified in TS were in the process of being identified and entered into the calibration control progra Discussions with maintenance management personnel indicated that once identified, these instruments would be entered into the PM calibration control program.
,
The identification of these specific TS/LC0 instruments for Unit 2 had not been completed and until they have been identified and entered into the PM calibration control program, this is identified as IFI 425/88-25-03 Surveillances with frequencies greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> are the administrative responsibility of NSAC. Surveillance requirements of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or less are the responsibility of various plant groups. The operations group's procedures for surveillance activities for Unit 2 had not been completed and until these procedures are completed and the surveillances are identified, this is identified as IFI 425/88-25-0 Administrative controls for the Inservice Inspection program were approved and in place. The Unit 2 components have been identified which were to be included in this program. Tracking and scheduling of this program will be via the Master Surveillance Schedule. These components had not been entered into the master scheduling; completion of the master surveillance schedule will encompass the incorporation of the Unit 2 ISI/IST progra ;1e Unit 2 surveillance testing and calibration control program was inadequate to support Unit 2 operations at this tim Within this area, no violations or deviation', were identifie _ _ _ _ - _ - _ _ _ . __
'
.:' ..
.
.
'
11 Document Control (35742)
References: CFR 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants Regulatory Guide 1.33, Quality Assurance Program Requirements ANSI N18.7-1976, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power-Plants Regulatory Guide 1.88, Collection, Storage, and Maintenance of Nuclear Power Plant Quality Assurance Records ANSI N45.2.9-1974 Requirements for Collection. Storage and -Maintenance of Quality Assurance Records for Nuclear Power Plants VEGP-FSAR, Chapter 17, Quality Assurance Program, Amendment 35 VEGP Quality Assurance Manual, Revision 10 The inspector reviewed the licensee's document control program required by references (a) through (g) to determine if the program had been established in accordance with regulatory requirements and industry guides and standard The following criteria were used during this review to determine the overall acceptability of the established program:
- Administrative controls had been established for drawing issuance, drawing change review, obsolete drawing control and as-constructed /
as-built drawing updatin ResponsiS111 ties assigned for drawing control and document control
,
program Master indices maintained for drawings, manuals, TS, FSARs, and procedures indicate the current revision and are periodically reviewe Administrative controls had been established which designate responsibility, specific time periods for use, and adequate evaluation and review of temporary procedure Administrative controls had been established for temporary changes to procedure _ _ _ _ _ _ _ _ - - _ _ _ _ - _ _ _ . __ _ _ _ . _
_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ - .
_: .
, ,
.
.
. 12
,
.
The following documents were reviewed to determine if these criteria had been incorporated into the licensee's QA program for document control C$ Procedure Development, Revision 8 00051-C. Procedure Review and Approval, Revision 9 00052-C. Temporary Changes to Procedures, Revision 4 00053-C) Temporary Procedures, Revision 1 00101-C$ Drawing Control, Revision 5 00103-CI Document Distribution and Control, Revision 5 00108-C. Control, Review, Approval and Use of Vendor Manuals and 4 Revisions, Revision 6T 70402-C Nuclear Operating Records Management System Revision 3
'
Distribution and control of drawings, procedures, and vendor manuals was maintained by the site document control group. A computer data base system, NORMS, functioned as the master indices for these document Unit 2 drawings, procedures, and manuals were being entered into NORMS as they were approved. Distribution and control of Unit 2 TS and FSAR were the responsibility of SCS in Birmingham, Alabama. Vogtle will assume responsibilty for these documents af ter licensin The inspector's review of procedures and master indices and discussions with document control personnel indicated the document control program for Unit 2 was establishe Within this area, no violations or deviations were identifie . Licensee Action On Previous Inspection Findings (92701, 92702) (Closed) Violation 50-424/87-69-01: Failure to Return EQ Equipment
! To A Qualified Condition Following Maintenance. The licensee's response dated March 14, 1988, was considered ac'.eptable by Region II. The inspector reviewed documentation, MWO 18704972, which returned the EQ equipment to a qualified condition and a training program completion record dated November 23, 1987, which addressed this issu The inspector concluded that the licensee had determined the full extent of the violation, taken action to correct conditions and developed corrective actions needed to preclude recurrence of similar problems. Corrective actions stated in the licensee response have i been implemented.
l l
L
. .
,
.
.
.
.
b. (Closed) Violation 50-424/87-69-02: Failure To Follow Procedure 00150-C, Deficiency Control . The licensee's response dated March 14, 1988, was considered acceptable by Region II. The inspector reviewed training documentation for deficiency reporting system scope and us Additionally reviewed was a site memorandum dated December 17, 1987, requiring the MWO review by the Work Planning Group to include screening for deficiency report item The inspector concluded that the licensee had determined the full extent of the violation, taken action to correct conditions, and developed corrective actions needed to preclude recurrence of similar problems. Corrective actions stated in the licensee's response have been implemente c. (Closed) Violation 50-424/87-69-03: Failure To Perform Post-Modification Testing. The licensee response dated May 14, 1988 was considered acceptable by Region II. The inspector reviewed the implementation of the Design Change Program, specifically verifying that a review for post-modification functional test determination and performance was included in the design change package closecut process. This violation occurred during the start-up test phase before the Design Change Program was fully implemente The inspector concluded that the licensee had determined the full extent of the violation, taken action to correct current conditions, and developed corrective actions needed to preclude recurrence of similar problems. Corrective actions stated in the licensee response have been implemented, (Closed) Inspector Followup Item 50-424/86-89-02: Assignment of Administrative Responsibili ty for Temporary Change Procedure (00052-C). This item identified administrative inadequacies in the temporary change procedure which were initially identified by the Vogtle QA staff (AFR No. OP18/19-86/15 #38 II). The AFR was closed on March 27, 1987. Action for AFR closure included Revision 3 to 00052-C which provided process flow charts, and a review of previously issued TCPs. These actions provide adequate administrative guidance for the temporary change procedure activit (Closed) Inspector Followup Item 50-424/86-89-03: Corporate Design Change Manual Not Approved. The Corporate Design Change Manual was approved and issued on March 3,1987. This manual provided general guidance for GPC modification activity with specific delineation of interfaces for onsite and offsite activities. Design change program deficiencies regarding field change request processing and 10 CFR 50.59 reportability requirements were resolved in corporate and site administrative procedure _ _ _ _ _ .
. .
,
.
.
14 (Closed) Inspector Followup Item 50-424/86-89-05: Changes to Approved Design Change Package This item identified the potential for temporary modifications to be changed without adequate review, for example, the applicable procedure stated that if a temporary modification was an inadequate resolution then the installer was to
"correct" the problem. The instruction did not specify a review process for the required field change to the temporary modificatio Revision 4 of the Temporary Modifications Procedure, 00307-C, included a requirement to identify this type of condition as a deficiency and utilize the deficiency reporting process. The controls in the deficiency reporting program provide adequate assurance that unauthorized changes to temporary modifications will not occur, (Closed) Inspector Followup Item 50-424/86-89-06: Revise Upper-Tier (FSAR) and Lower-Tier (Procedures) QA Program Documents. This item addressed the incorporation of the 1986 Nuclear Operations management reorganization into site implementing procedures. The FSAR revision no. 35 addressed the reorganization changes. The inspector reviewed the tracking documentation for the revisions to the 64 site procedures which were impacted by the management change. The documentation indicated that the reorganization had been implemented into upper and lower tier QA program document . Exit Interview The inspection scope and results were summarized on May 20, 1988, with those persons indicated in paragraph 1. The inspector described the areas inspected and discussed in detail the inspection results listed belo Proprietary information is not contained in this report. Dissenting comra!nts were not received from the license Item Number Discription and Reference 425/88-25-01 IFI - Surveillance master schedule incomplete, paragraph /88-25-02 IFI - Surveillance task procedures incomplete, paragraph /88-25-03 IFI - TS component list and incorporation into calibration program incomplete, paragraph /88-25-04 IFI - Operations Department procedures for surveillance requirements of 72-hours or less incomplete, paragraph __ - _ - - _ _ _ _ _ _ .
. .
.p . . ,
, .
15 9.- Acronyms and Initialism A/E' Architect / Engineer ASME American Society of Mechanical Engineerc DCP Design Change Package DCR Design Change Request EQ Environmental Qualification FSAR Final Safety Analysis Report GPC Georgia Power Company I&C Instrumentation and Control IFI Inspector Followup Itsu-ISI Inservice Inspection IST Inservice Testing LC0 Limiting Condition for Operation M&TE Measuring and Test Equipment MWO Maintenance Work Order-NORMS Nuclear Operations Record Management System NSAC Nuclear Safety and Compliance PFE-0 Project Field Engineering-Operations PM Planned Maintenance QA Quality Assurance REA Request for Engineering Assistance RER . Request for Engineering Review SCS Southern Company Services TS Technical Specifications VEGP Vogtle Electric Generating Plant
-