Category:INSPECTION REPORT
MONTHYEARIR 05000348/19990051999-09-0202 September 1999 Insp Repts 50-348/99-05 & 50-364/99-05 on 990627-0807.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000348/19990041999-07-26026 July 1999 Insp Repts 50-348/99-04 & 50-364/99-04 on 990516-0626.One Noncited Violation Identified.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000348/19990031999-06-10010 June 1999 Insp Repts 50-348/99-03 & 50-364/99-03 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000348/19990021999-04-29029 April 1999 Insp Repts 50-348/99-02 & 50-364/99-02 on 990221-0403.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20205Q1721999-04-0606 April 1999 Partially Withheld Insp Repts 50-348/99-09 & 50-364/99-09 on 990308-10 (Ref 10CFR73.21).Non-cited Violation Identified. Major Areas Inspected:Area of Plant Support Re Physical Security Program for Power Reactors IR 05000348/19990011999-03-19019 March 1999 Insp Repts 50-348/99-01 & 50-364/99-01 on 990110-0220. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000348/19980081999-02-0202 February 1999 Insp Repts 50-348/98-08 & 50-364/98-08 on 981129-990109.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000348/19980141999-01-0808 January 1999 Partially Withheld Insp Repts 50-348/98-14 & 50-364/98-14 on 981207-10 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress IR 05000348/19980071998-12-28028 December 1998 Insp Repts 50-348/98-07 & 50-364/98-07 on 981018-1128.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000348/19980061998-11-10010 November 1998 Insp Repts 50-348/98-06 & 50-364/98-06 on 980830-1017.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000348/19980101998-11-0303 November 1998 Insp Repts 50-348/98-10 & 50-364/98-10 on 980908-11.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise & Response in Control Room Simulator & Technical Support Ctr IR 05000348/19980051998-09-28028 September 1998 Insp Repts 50-348/98-05 & 50-364/98-05 on 980712-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19980041998-08-10010 August 1998 Insp Repts 50-348/98-04 & 50-364/98-04 on 980601-0711.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20236J7021998-07-0101 July 1998 Insp Repts 50-348/98-03 & 50-364/98-03 on 980412-0530.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000348/19980091998-05-11011 May 1998 Special Insp Repts 50-348/98-09 & 50-364/98-09 on 980323-25. Violations Noted.Major Areas Inspected:Follow Up on OI Rept 2-97-011 Issued on 980209 Re Improper Weld Repair IR 05000348/19980021998-05-0808 May 1998 Insp Repts 50-348/98-02 & 50-364/98-02 on 980221-0411.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19980011998-03-23023 March 1998 Insp Repts 50-348/98-01 & 50-364/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19970151998-02-0909 February 1998 Insp Repts 50-348/97-15 & 50-364/97-15 on 971130-980110. No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20198N9961997-12-29029 December 1997 Insp Repts 50-348/97-14 & 50-364/97-14 on 971019-1129. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000348/19970131997-11-20020 November 1997 Partially Withheld Insp Repts 50-348/97-13 & 50-364/97-13 on 971021-24 (Ref 10CFR73.21).Major Areas Inspected:Physical Security Program for Power Reactors ML20199H1541997-11-17017 November 1997 Insp Repts 50-348/97-11 & 50-364/97-11 on 970907-1018. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000348/19970071997-10-10010 October 1997 Insp Repts 50-348/97-07 & 50-364/97-07 on 970825-29.No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program,Including Problem Identification & Resolution IR 05000348/19970101997-10-0606 October 1997 Insp Repts 50-348/97-10 & 50-364/97-10 on 970803-0906. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000348/19970121997-09-26026 September 1997 Insp Repts 50-348/97-12 & 50-364/97-12 on 970818-22. Violations Noted.Major Areas Inspected:Review of Fire Protection Program Activities to Support Design Basis of Silicone Foam Fire Barrier Penetration Seals IR 05000348/19970081997-08-28028 August 1997 Insp Repts 50-348/97-08 & 50-364/97-08 on 970622-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000348/19970061997-07-18018 July 1997 Insp Repts 50-348/97-06 & 50-364/97-06 on 970511-0621.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20148K6511997-06-0909 June 1997 Insp Repts 50-348/97-05 & 50-364/97-05 on 970330-0510. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19972011997-05-13013 May 1997 Insp Repts 50-348/97-201 & 50-364/97-201 on 970127-0314.No Violations Noted.Major Areas Inspected:Engineering, Auxiliary Feedwater Sys,Component Cooling Water Sys & Sys Interface Design Review ML20138J6661997-04-28028 April 1997 Insp Repts 50-348/97-03 & 50-364/97-03 on 970216-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support,Including Health Physics ML20137U6021997-04-0202 April 1997 Insp Repts 50-348/97-04 & 50-364/97-04 on 970125-0314. Violations Noted.Major Areas Inspected:Detailed Esfs Review & Walkdown of Units 1 & 2 PRF Sys,Including Associated Surveillance Test & Sys Design Requirements ML20140B7921997-03-17017 March 1997 Insp Repts 50-348/97-01 & 50-364/97-01 on 970104-0215. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000348/19960151997-02-0303 February 1997 Insp Repts 50-348/96-15 & 50-364/96-15 on 961124-970104.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134G3961997-01-24024 January 1997 Insp Repts 50-348/96-14 & 50-364/96-14 on 961209-13.No Violations Noted.Major Areas Inspected:Biennial Emergency Preparedness Exercise ML20133F6921996-12-23023 December 1996 Insp Repts 50-348/96-13 & 50-364/96-13 on 961013-1123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134J4391996-11-0808 November 1996 Insp Repts 50-348/96-09 & 50-364/96-09 on 960901-1012. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19960111996-10-11011 October 1996 Insp Repts 50-348/96-11 & 50-364/96-11 on 961007-11.No Violations Noted.Major Areas Inspected:Plant Support ML20128J9761996-09-27027 September 1996 Insp Repts 50-348/96-07 & 50-364/96-07 on 960721-0831. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support ML20128H8371996-09-27027 September 1996 Insp Repts 50-348/96-10 & 50-364/96-10 on 960812-16 & 26-30. Violations Noted.Major Areas Inspected:Radiation Monitoring Sys Radwaste Processing & Storage & Operational Radiation Protection Programs IR 05000348/19930301994-01-0606 January 1994 Insp Repts 50-348/93-30 & 50-364/93-30 on 931206-1210.No Violations or Deviations Noted.Major Areas Inspected: Process & Effluent Monitors,Post Accident Sampling Sys, Annual Radiological Environmental Operating Rept IR 05000348/19930291994-01-0505 January 1994 Insp Repts 50-348/93-29 & 50-364/93-29 on 931206-10.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000348/19930281993-12-14014 December 1993 Insp Repts 50-348/93-28 & 50-364/93-28 on 931022-1122. Noncited Violation Identified.Major Areas Inspected:Licensee Operations,Maint/Surveillance Activities & Unit 2 Refueling Activities IR 05000348/19930251993-12-0202 December 1993 Insp Repts 50-348/93-25 & 50-364/93-25 on 931018-22 & 931101-05.Noncited Violation Identified.Major Areas Inspected:Sg Tubes,Review Laser Welding Procedures to Be Used for Securing Sleeves & Review Design Changes IR 05000348/19930271993-11-24024 November 1993 Insp Repts 50-348/93-27 & 50-364/93-27 on 931025-29.No Violations Noted.Major Areas Inspected:Licensee Corrective Actions for safety-significant Findings Identified During Electrical Distribution Sys Functional Insp IR 05000348/19930221993-11-17017 November 1993 Insp Repts 50-348/93-22 & 50-364/93-22 on 930925-1022.No Violations Noted.Major Areas Inspected:Maintenance, Surveillance,Industry Technical Issues,Event Repts,Unit 2 Refueling Activities & Continuing Review of self-assessment IR 05000364/19934001993-11-10010 November 1993 Insp Rept 50-364/93-400 on 931004-15.No Violations Noted. Majors Areas Inspected:Review of Licensee ISI Program Submittal & Nondestructive Exams of safety-related Weldments,Hanger & Supports Selected from SI IR 05000348/19930231993-11-10010 November 1993 Insp Repts 50-348/93-23 & 50-364/93-23 on 931012-15.No Violations Noted.Major Areas Inspected:Organization & Mgt Controls,Audits & Appraisals,External & Internal Control, Control of Radioactive Matl & Contamination IR 05000348/19930261993-11-0404 November 1993 Insp Repts 50-348/93-26 & 50-364/93-26 on Stated Dates. Violation Being Considered for Escalated Enforcement Action. Major Areas Inspected:Review of Plant Conditions Re Recent Listed Events IR 05000348/19930241993-11-0101 November 1993 Insp Repts 50-348/93-24 & 50-364/93-24 on 931012-15.No Violations or Deviations Noted.Major Areas Inspected:Isi, Including Nondestructive Exam Procedures & Observation of Work & Work Activities IR 05000348/19930211993-10-21021 October 1993 Insp Repts 50-348/93-21 & 50-364/93-21 on 930830-0925.No Violations Noted.Major Areas Inspected:Operations,Maint, Surveillance,Industry Technical Issues,Event Repts,Unit 2 Refueling Activities & Licensee self-assessment ML20057E4981993-09-29029 September 1993 Insp Repts 50-348/93-13 & 50-364/93-13 on 930816-0903. Violations Noted.Major Areas Inspected:Sws 1999-09-02
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000348/19990051999-09-0202 September 1999 Insp Repts 50-348/99-05 & 50-364/99-05 on 990627-0807.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000348/19990041999-07-26026 July 1999 Insp Repts 50-348/99-04 & 50-364/99-04 on 990516-0626.One Noncited Violation Identified.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000348/19990031999-06-10010 June 1999 Insp Repts 50-348/99-03 & 50-364/99-03 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000348/19990021999-04-29029 April 1999 Insp Repts 50-348/99-02 & 50-364/99-02 on 990221-0403.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20205Q1721999-04-0606 April 1999 Partially Withheld Insp Repts 50-348/99-09 & 50-364/99-09 on 990308-10 (Ref 10CFR73.21).Non-cited Violation Identified. Major Areas Inspected:Area of Plant Support Re Physical Security Program for Power Reactors IR 05000348/19990011999-03-19019 March 1999 Insp Repts 50-348/99-01 & 50-364/99-01 on 990110-0220. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000348/19980081999-02-0202 February 1999 Insp Repts 50-348/98-08 & 50-364/98-08 on 981129-990109.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000348/19980141999-01-0808 January 1999 Partially Withheld Insp Repts 50-348/98-14 & 50-364/98-14 on 981207-10 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress IR 05000348/19980071998-12-28028 December 1998 Insp Repts 50-348/98-07 & 50-364/98-07 on 981018-1128.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000348/19980061998-11-10010 November 1998 Insp Repts 50-348/98-06 & 50-364/98-06 on 980830-1017.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000348/19980101998-11-0303 November 1998 Insp Repts 50-348/98-10 & 50-364/98-10 on 980908-11.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise & Response in Control Room Simulator & Technical Support Ctr IR 05000348/19980051998-09-28028 September 1998 Insp Repts 50-348/98-05 & 50-364/98-05 on 980712-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19980041998-08-10010 August 1998 Insp Repts 50-348/98-04 & 50-364/98-04 on 980601-0711.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20236J7021998-07-0101 July 1998 Insp Repts 50-348/98-03 & 50-364/98-03 on 980412-0530.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000348/19980091998-05-11011 May 1998 Special Insp Repts 50-348/98-09 & 50-364/98-09 on 980323-25. Violations Noted.Major Areas Inspected:Follow Up on OI Rept 2-97-011 Issued on 980209 Re Improper Weld Repair IR 05000348/19980021998-05-0808 May 1998 Insp Repts 50-348/98-02 & 50-364/98-02 on 980221-0411.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19980011998-03-23023 March 1998 Insp Repts 50-348/98-01 & 50-364/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19970151998-02-0909 February 1998 Insp Repts 50-348/97-15 & 50-364/97-15 on 971130-980110. No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20198N9961997-12-29029 December 1997 Insp Repts 50-348/97-14 & 50-364/97-14 on 971019-1129. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000348/19970131997-11-20020 November 1997 Partially Withheld Insp Repts 50-348/97-13 & 50-364/97-13 on 971021-24 (Ref 10CFR73.21).Major Areas Inspected:Physical Security Program for Power Reactors ML20199H1541997-11-17017 November 1997 Insp Repts 50-348/97-11 & 50-364/97-11 on 970907-1018. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000348/19970071997-10-10010 October 1997 Insp Repts 50-348/97-07 & 50-364/97-07 on 970825-29.No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program,Including Problem Identification & Resolution IR 05000348/19970101997-10-0606 October 1997 Insp Repts 50-348/97-10 & 50-364/97-10 on 970803-0906. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000348/19970121997-09-26026 September 1997 Insp Repts 50-348/97-12 & 50-364/97-12 on 970818-22. Violations Noted.Major Areas Inspected:Review of Fire Protection Program Activities to Support Design Basis of Silicone Foam Fire Barrier Penetration Seals IR 05000348/19970081997-08-28028 August 1997 Insp Repts 50-348/97-08 & 50-364/97-08 on 970622-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000348/19970061997-07-18018 July 1997 Insp Repts 50-348/97-06 & 50-364/97-06 on 970511-0621.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20148K6511997-06-0909 June 1997 Insp Repts 50-348/97-05 & 50-364/97-05 on 970330-0510. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19972011997-05-13013 May 1997 Insp Repts 50-348/97-201 & 50-364/97-201 on 970127-0314.No Violations Noted.Major Areas Inspected:Engineering, Auxiliary Feedwater Sys,Component Cooling Water Sys & Sys Interface Design Review ML20138J6661997-04-28028 April 1997 Insp Repts 50-348/97-03 & 50-364/97-03 on 970216-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support,Including Health Physics ML20137U6021997-04-0202 April 1997 Insp Repts 50-348/97-04 & 50-364/97-04 on 970125-0314. Violations Noted.Major Areas Inspected:Detailed Esfs Review & Walkdown of Units 1 & 2 PRF Sys,Including Associated Surveillance Test & Sys Design Requirements ML20140B7921997-03-17017 March 1997 Insp Repts 50-348/97-01 & 50-364/97-01 on 970104-0215. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000348/19960151997-02-0303 February 1997 Insp Repts 50-348/96-15 & 50-364/96-15 on 961124-970104.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134G3961997-01-24024 January 1997 Insp Repts 50-348/96-14 & 50-364/96-14 on 961209-13.No Violations Noted.Major Areas Inspected:Biennial Emergency Preparedness Exercise ML20133F6921996-12-23023 December 1996 Insp Repts 50-348/96-13 & 50-364/96-13 on 961013-1123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134J4391996-11-0808 November 1996 Insp Repts 50-348/96-09 & 50-364/96-09 on 960901-1012. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19960111996-10-11011 October 1996 Insp Repts 50-348/96-11 & 50-364/96-11 on 961007-11.No Violations Noted.Major Areas Inspected:Plant Support ML20128J9761996-09-27027 September 1996 Insp Repts 50-348/96-07 & 50-364/96-07 on 960721-0831. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support ML20128H8371996-09-27027 September 1996 Insp Repts 50-348/96-10 & 50-364/96-10 on 960812-16 & 26-30. Violations Noted.Major Areas Inspected:Radiation Monitoring Sys Radwaste Processing & Storage & Operational Radiation Protection Programs IR 05000348/19930301994-01-0606 January 1994 Insp Repts 50-348/93-30 & 50-364/93-30 on 931206-1210.No Violations or Deviations Noted.Major Areas Inspected: Process & Effluent Monitors,Post Accident Sampling Sys, Annual Radiological Environmental Operating Rept IR 05000348/19930291994-01-0505 January 1994 Insp Repts 50-348/93-29 & 50-364/93-29 on 931206-10.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000348/19930281993-12-14014 December 1993 Insp Repts 50-348/93-28 & 50-364/93-28 on 931022-1122. Noncited Violation Identified.Major Areas Inspected:Licensee Operations,Maint/Surveillance Activities & Unit 2 Refueling Activities IR 05000348/19930251993-12-0202 December 1993 Insp Repts 50-348/93-25 & 50-364/93-25 on 931018-22 & 931101-05.Noncited Violation Identified.Major Areas Inspected:Sg Tubes,Review Laser Welding Procedures to Be Used for Securing Sleeves & Review Design Changes IR 05000348/19930271993-11-24024 November 1993 Insp Repts 50-348/93-27 & 50-364/93-27 on 931025-29.No Violations Noted.Major Areas Inspected:Licensee Corrective Actions for safety-significant Findings Identified During Electrical Distribution Sys Functional Insp IR 05000348/19930221993-11-17017 November 1993 Insp Repts 50-348/93-22 & 50-364/93-22 on 930925-1022.No Violations Noted.Major Areas Inspected:Maintenance, Surveillance,Industry Technical Issues,Event Repts,Unit 2 Refueling Activities & Continuing Review of self-assessment IR 05000364/19934001993-11-10010 November 1993 Insp Rept 50-364/93-400 on 931004-15.No Violations Noted. Majors Areas Inspected:Review of Licensee ISI Program Submittal & Nondestructive Exams of safety-related Weldments,Hanger & Supports Selected from SI IR 05000348/19930231993-11-10010 November 1993 Insp Repts 50-348/93-23 & 50-364/93-23 on 931012-15.No Violations Noted.Major Areas Inspected:Organization & Mgt Controls,Audits & Appraisals,External & Internal Control, Control of Radioactive Matl & Contamination IR 05000348/19930261993-11-0404 November 1993 Insp Repts 50-348/93-26 & 50-364/93-26 on Stated Dates. Violation Being Considered for Escalated Enforcement Action. Major Areas Inspected:Review of Plant Conditions Re Recent Listed Events IR 05000348/19930241993-11-0101 November 1993 Insp Repts 50-348/93-24 & 50-364/93-24 on 931012-15.No Violations or Deviations Noted.Major Areas Inspected:Isi, Including Nondestructive Exam Procedures & Observation of Work & Work Activities IR 05000348/19930211993-10-21021 October 1993 Insp Repts 50-348/93-21 & 50-364/93-21 on 930830-0925.No Violations Noted.Major Areas Inspected:Operations,Maint, Surveillance,Industry Technical Issues,Event Repts,Unit 2 Refueling Activities & Licensee self-assessment ML20057E4981993-09-29029 September 1993 Insp Repts 50-348/93-13 & 50-364/93-13 on 930816-0903. Violations Noted.Major Areas Inspected:Sws 1999-09-02
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000348/19990051999-09-0202 September 1999 Insp Repts 50-348/99-05 & 50-364/99-05 on 990627-0807.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000348/19990041999-07-26026 July 1999 Insp Repts 50-348/99-04 & 50-364/99-04 on 990516-0626.One Noncited Violation Identified.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000348/19990031999-06-10010 June 1999 Insp Repts 50-348/99-03 & 50-364/99-03 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000348/19990021999-04-29029 April 1999 Insp Repts 50-348/99-02 & 50-364/99-02 on 990221-0403.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20205Q1721999-04-0606 April 1999 Partially Withheld Insp Repts 50-348/99-09 & 50-364/99-09 on 990308-10 (Ref 10CFR73.21).Non-cited Violation Identified. Major Areas Inspected:Area of Plant Support Re Physical Security Program for Power Reactors IR 05000348/19990011999-03-19019 March 1999 Insp Repts 50-348/99-01 & 50-364/99-01 on 990110-0220. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000348/19980081999-02-0202 February 1999 Insp Repts 50-348/98-08 & 50-364/98-08 on 981129-990109.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000348/19980141999-01-0808 January 1999 Partially Withheld Insp Repts 50-348/98-14 & 50-364/98-14 on 981207-10 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress IR 05000348/19980071998-12-28028 December 1998 Insp Repts 50-348/98-07 & 50-364/98-07 on 981018-1128.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000348/19980061998-11-10010 November 1998 Insp Repts 50-348/98-06 & 50-364/98-06 on 980830-1017.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000348/19980101998-11-0303 November 1998 Insp Repts 50-348/98-10 & 50-364/98-10 on 980908-11.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise & Response in Control Room Simulator & Technical Support Ctr IR 05000348/19980051998-09-28028 September 1998 Insp Repts 50-348/98-05 & 50-364/98-05 on 980712-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19980041998-08-10010 August 1998 Insp Repts 50-348/98-04 & 50-364/98-04 on 980601-0711.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20236J7021998-07-0101 July 1998 Insp Repts 50-348/98-03 & 50-364/98-03 on 980412-0530.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000348/19980091998-05-11011 May 1998 Special Insp Repts 50-348/98-09 & 50-364/98-09 on 980323-25. Violations Noted.Major Areas Inspected:Follow Up on OI Rept 2-97-011 Issued on 980209 Re Improper Weld Repair IR 05000348/19980021998-05-0808 May 1998 Insp Repts 50-348/98-02 & 50-364/98-02 on 980221-0411.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19980011998-03-23023 March 1998 Insp Repts 50-348/98-01 & 50-364/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19970151998-02-0909 February 1998 Insp Repts 50-348/97-15 & 50-364/97-15 on 971130-980110. No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20198N9961997-12-29029 December 1997 Insp Repts 50-348/97-14 & 50-364/97-14 on 971019-1129. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000348/19970131997-11-20020 November 1997 Partially Withheld Insp Repts 50-348/97-13 & 50-364/97-13 on 971021-24 (Ref 10CFR73.21).Major Areas Inspected:Physical Security Program for Power Reactors ML20199H1541997-11-17017 November 1997 Insp Repts 50-348/97-11 & 50-364/97-11 on 970907-1018. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000348/19970071997-10-10010 October 1997 Insp Repts 50-348/97-07 & 50-364/97-07 on 970825-29.No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program,Including Problem Identification & Resolution IR 05000348/19970101997-10-0606 October 1997 Insp Repts 50-348/97-10 & 50-364/97-10 on 970803-0906. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000348/19970121997-09-26026 September 1997 Insp Repts 50-348/97-12 & 50-364/97-12 on 970818-22. Violations Noted.Major Areas Inspected:Review of Fire Protection Program Activities to Support Design Basis of Silicone Foam Fire Barrier Penetration Seals IR 05000348/19970081997-08-28028 August 1997 Insp Repts 50-348/97-08 & 50-364/97-08 on 970622-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000348/19970061997-07-18018 July 1997 Insp Repts 50-348/97-06 & 50-364/97-06 on 970511-0621.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20148K6511997-06-0909 June 1997 Insp Repts 50-348/97-05 & 50-364/97-05 on 970330-0510. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19972011997-05-13013 May 1997 Insp Repts 50-348/97-201 & 50-364/97-201 on 970127-0314.No Violations Noted.Major Areas Inspected:Engineering, Auxiliary Feedwater Sys,Component Cooling Water Sys & Sys Interface Design Review ML20138J6661997-04-28028 April 1997 Insp Repts 50-348/97-03 & 50-364/97-03 on 970216-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support,Including Health Physics ML20137U6021997-04-0202 April 1997 Insp Repts 50-348/97-04 & 50-364/97-04 on 970125-0314. Violations Noted.Major Areas Inspected:Detailed Esfs Review & Walkdown of Units 1 & 2 PRF Sys,Including Associated Surveillance Test & Sys Design Requirements ML20140B7921997-03-17017 March 1997 Insp Repts 50-348/97-01 & 50-364/97-01 on 970104-0215. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000348/19960151997-02-0303 February 1997 Insp Repts 50-348/96-15 & 50-364/96-15 on 961124-970104.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134G3961997-01-24024 January 1997 Insp Repts 50-348/96-14 & 50-364/96-14 on 961209-13.No Violations Noted.Major Areas Inspected:Biennial Emergency Preparedness Exercise ML20133F6921996-12-23023 December 1996 Insp Repts 50-348/96-13 & 50-364/96-13 on 961013-1123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134J4391996-11-0808 November 1996 Insp Repts 50-348/96-09 & 50-364/96-09 on 960901-1012. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19960111996-10-11011 October 1996 Insp Repts 50-348/96-11 & 50-364/96-11 on 961007-11.No Violations Noted.Major Areas Inspected:Plant Support ML20128J9761996-09-27027 September 1996 Insp Repts 50-348/96-07 & 50-364/96-07 on 960721-0831. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support ML20128H8371996-09-27027 September 1996 Insp Repts 50-348/96-10 & 50-364/96-10 on 960812-16 & 26-30. Violations Noted.Major Areas Inspected:Radiation Monitoring Sys Radwaste Processing & Storage & Operational Radiation Protection Programs IR 05000348/19930301994-01-0606 January 1994 Insp Repts 50-348/93-30 & 50-364/93-30 on 931206-1210.No Violations or Deviations Noted.Major Areas Inspected: Process & Effluent Monitors,Post Accident Sampling Sys, Annual Radiological Environmental Operating Rept IR 05000348/19930291994-01-0505 January 1994 Insp Repts 50-348/93-29 & 50-364/93-29 on 931206-10.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000348/19930281993-12-14014 December 1993 Insp Repts 50-348/93-28 & 50-364/93-28 on 931022-1122. Noncited Violation Identified.Major Areas Inspected:Licensee Operations,Maint/Surveillance Activities & Unit 2 Refueling Activities IR 05000348/19930251993-12-0202 December 1993 Insp Repts 50-348/93-25 & 50-364/93-25 on 931018-22 & 931101-05.Noncited Violation Identified.Major Areas Inspected:Sg Tubes,Review Laser Welding Procedures to Be Used for Securing Sleeves & Review Design Changes IR 05000348/19930271993-11-24024 November 1993 Insp Repts 50-348/93-27 & 50-364/93-27 on 931025-29.No Violations Noted.Major Areas Inspected:Licensee Corrective Actions for safety-significant Findings Identified During Electrical Distribution Sys Functional Insp IR 05000348/19930221993-11-17017 November 1993 Insp Repts 50-348/93-22 & 50-364/93-22 on 930925-1022.No Violations Noted.Major Areas Inspected:Maintenance, Surveillance,Industry Technical Issues,Event Repts,Unit 2 Refueling Activities & Continuing Review of self-assessment IR 05000364/19934001993-11-10010 November 1993 Insp Rept 50-364/93-400 on 931004-15.No Violations Noted. Majors Areas Inspected:Review of Licensee ISI Program Submittal & Nondestructive Exams of safety-related Weldments,Hanger & Supports Selected from SI IR 05000348/19930231993-11-10010 November 1993 Insp Repts 50-348/93-23 & 50-364/93-23 on 931012-15.No Violations Noted.Major Areas Inspected:Organization & Mgt Controls,Audits & Appraisals,External & Internal Control, Control of Radioactive Matl & Contamination IR 05000348/19930261993-11-0404 November 1993 Insp Repts 50-348/93-26 & 50-364/93-26 on Stated Dates. Violation Being Considered for Escalated Enforcement Action. Major Areas Inspected:Review of Plant Conditions Re Recent Listed Events IR 05000348/19930241993-11-0101 November 1993 Insp Repts 50-348/93-24 & 50-364/93-24 on 931012-15.No Violations or Deviations Noted.Major Areas Inspected:Isi, Including Nondestructive Exam Procedures & Observation of Work & Work Activities IR 05000348/19930211993-10-21021 October 1993 Insp Repts 50-348/93-21 & 50-364/93-21 on 930830-0925.No Violations Noted.Major Areas Inspected:Operations,Maint, Surveillance,Industry Technical Issues,Event Repts,Unit 2 Refueling Activities & Licensee self-assessment ML20057E4981993-09-29029 September 1993 Insp Repts 50-348/93-13 & 50-364/93-13 on 930816-0903. Violations Noted.Major Areas Inspected:Sws 1999-09-02
[Table view] Category:UTILITY
MONTHYEARIR 05000348/19900281990-10-15015 October 1990 Insp Repts 50-348/90-28 & 50-364/90-28 on 900911-1012.No Violations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance & Maint Observation,Info Meeting W/Local Officials & self-assessment Capability ML20059N3501990-09-14014 September 1990 Insp Repts 50-348/90-24 & 50-364/90-24 on 900827-31.No Violations or Deviations Noted.Major Areas Inspected:Actions in Response to NRC Bulletin 88-004, Potential Safety- Related Pump Loss IR 05000348/19900201990-08-23023 August 1990 Insp Repts 50-348/90-20 & 50-364/90-20 on 900711-0810.No Violations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance & Maint Observation,Esf Sys Walkdown & LERs IR 05000348/19900211990-07-30030 July 1990 Insp Repts 50-348/90-21 & 50-364/90-21 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected:Areas of Local Leak Rate Testing & Review of Previous Insp Findings.Five Open Items Re Leak Rate Testing Closed IR 05000348/19900171990-07-10010 July 1990 Insp Repts 50-348/90-17 & 50-364/90-17 on 900618-22.No Violations or Deviations Noted.Major Areas Inspected: Radiological Liquid & Gaseous Effluent Processing & Releases & Radiological Environ Monitoring Programs IR 05000348/19900041990-02-20020 February 1990 Insp Repts 50-348/90-04 & 50-364/90-04 on 900129-0202.No Violations or Deviations Noted.Major Areas Inspected: Followup of Open Items & Review of Activities Re Defects in Unit 1 Steam Generator Tube IR 05000348/19890181989-09-0707 September 1989 Partially Withheld Insp Repts 50-348/89-18 & 50-364/89-18 on 890731-0804 (Ref 10CFR2.790(d) & 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactor,Mgt Support,Security & Vital Area Barriers IR 05000348/19890191989-08-31031 August 1989 Insp Repts 50-348/89-19 & 50-364/89-19 on 890821-25.No Violations or Deviations Noted.Major Areas Inspected:Control Room Operator & Licensed Operator Requalification Training Programs Re How Tasks Analyzed & Objectives Derived IR 05000348/19890171989-08-24024 August 1989 Insp Repts 50-348/89-17 & 50-364/89-17 on 890724-28.No Violations or Deviations Noted.Major Areas Inspected:Design, Design Changes & Plant Mods.Administrative Procedures Weak in Description of Interfaces Between Plant Groups IR 05000348/19890161989-08-17017 August 1989 Insp Repts 50-348/89-16 & 50-364/89-16 on 890711-31.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety Verification & Monthly Surveillance & Maint Observation.List of Backlog of Ungraded Exams Encl IR 05000348/19890101989-07-27027 July 1989 Insp Repts 50-348/89-10 & 50-364/89-10 on 890424-27 & 0508- 2.Violations Noted.Major Areas Inspected:Maint Program & Implementation IR 05000348/19890141989-07-26026 July 1989 Insp Repts 50-348/89-14 & 50-364/89-14 on 890611-0710.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety Verification,Monthly Surveillance Observation,Operator Training,Work Schedule & LERs IR 05000348/19890121989-06-26026 June 1989 Insp Repts 50-348/89-12 & 50-364/89-12 on 890511-0610.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety Verification,Monthly Surveillance Observation,Lers & Design Changes & Mods IR 05000348/19890131989-06-0505 June 1989 Insp Repts 50-348/89-13 & 50-364/89-13 on 890509-10. Violations Noted.Major Areas Inspected:Use of Contaminated Money to Catch Alleged Thief & Failure of Operator to Follow Procedural Requirements Re High Radiation Area ML20246B0261989-05-25025 May 1989 Insp Repts 50-348/89-11 & 50-364/89-11 on 890411-0510. Violations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance Observation,Monthly Maint Observation,Lers & Unit 2 Startup from Refueling IR 05000348/19890081989-05-11011 May 1989 Insp Repts 50-348/89-08 & 50-364/89-08 on 890410-14.No Violations or Deviations Noted.Major Areas Inspected:Areas of Occupational Exposure,Shipping,Transportation,Solid Waste & Licensee Responses to Info Notices IR 05000348/19890091989-04-24024 April 1989 Insp Repts 50-348/89-09 & 50-364/89-09 on 890410-14.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Eddy Current Exam of Unit 2 Steam Generator Tubing & NDE Procedures IR 05000348/19890071989-04-19019 April 1989 Insp Repts 50-348/89-07 & 50-364/89-07 on 890311-0410. Violations Noted.Major Areas Inspected:Review of Operational Safety Verification,Monthly Surveillance Observation,Monthly Maint Observation,Design Changes & Mods & Insp of DHR IR 05000348/19890061989-03-23023 March 1989 Insp Repts 50-348/89-06 & 50-364/89-06 on 890227-0303.No Violations or Deviations Noted.Major Areas Inspected: Radiological Effluent Monitoring,Liquid & Gaseous Radwaste, Plant Chemistry & Plant Radiochemistry ML20236D1301989-03-10010 March 1989 Partically Withheld Insp Repts 50-348/89-03 & 50-364/89-03 on 890123-27 (Ref 10CFR73.21).Violation Noted:Vital Area Door Not Secured as Required in Physical Security Plan IR 05000348/19890031989-03-10010 March 1989 Partically Withheld Insp Repts 50-348/89-03 & 50-364/89-03 on 890123-27 (Ref 10CFR73.21).Violation Noted:Vital Area Door Not Secured as Required in Physical Security Plan IR 05000348/19890011989-03-10010 March 1989 Insp Repts 50-348/89-01 & 50-364/89-01 on 890206-10.No Violations or Deviations Noted.Major Areas Inspected: Emergency Preparedness,Including Emergency Plan & Implementing Procedures & Emergency Facilities & Equipment ML20236E2131989-03-0808 March 1989 Insp Repts 50-348/89-04 & 50-364/89-04 on 890206-10. Violation Noted.Major Areas Inspected:Radiation Protection Preparation for Unit 2 Refueling Outage Scheduled for 890324-0426 & Response to Info Notices IR 05000348/19890021989-02-24024 February 1989 Insp Repts 50-348/89-02 & 50-364/89-02 on 890111-0210. Violation Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance Observation,Monthly Maint Observation,Drawing Sys Verification & LERs IR 05000348/19880291988-11-23023 November 1988 Insp Repts 50-348/88-29 & 50-364/88-29 on 881011-1110.No Violations or Deviations Noted.Major Areas Inspected:Review of Operational Safety Verification,Monthly Surveillance Observation,Info Meeting W/Officials & Emergency Exercise IR 05000348/19880271988-10-28028 October 1988 Insp Repts 50-348/88-27 & 50-364/88-27 on 880926-30. Unresolved Item Noted.Major Areas Inspected:App R Compliance & post-fire Safe Shutdown Capability,Including Plant Mod Review & Reverification of App R Fire Protection Features IR 05000348/19880251988-10-12012 October 1988 Partially Withheld Insp Repts 50-348/88-25 & 50-364/88-25 on 880822-26 (Ref 10CFR2.790 & 73.21).Major Areas Inspected: Security Plan & Implementing Procedures,Mgt Effectiveness, Security Organization,Records & Repts & Testing & Maint IR 05000348/19880261988-09-26026 September 1988 Insp Repts 50-348/88-26 & 50-364/88-36 on 880811-0910. Violations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance Observation,Engineered Safety Sys Insp & Previous Insp Findings IR 05000348/19880241988-08-19019 August 1988 Insp Repts 50-348/88-24 & 50-364/88-24 on 880711-0810. Violations Noted:Use of Inadequate Procedure to Calculate RCS Inventory Leakage.Major Areas Inspected:Monthly Maint & Surveillance Observations & LERs IR 05000348/19880191988-08-17017 August 1988 Revised Pages 8-12 to Insp Repts 50-348/88-19 & 50-364/88-19 Correcting Grammatical Errors & Incorrect Paragraphs ML20151L5841988-07-21021 July 1988 Insp Repts 50-348/88-23 & 50-364/88-23 on 880611-0710. Violations Noted.Major Areas Inspected:Monthly Surveillance Observation,Operational Safety Verification,Engineered Safety Sys Insp,Radiological Protection & Physical Security ML20151D6531988-07-0707 July 1988 Insp Repts 50-348/88-19 & 50-364/88-19 on 880511-0610.No Violations Noted.Major Areas Inspected:Review of Monthly Surveillance & Monthly Maint Observation,Operational Safety Verification & Physical Security Program IR 05000348/19880221988-07-0606 July 1988 Partially Withheld Insp Repts 50-348/88-22 & 50-364/88-22 on 880613-17 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Vital Area Barriers, Assessment Aids & Access Control of Personnel ML20150C1281988-06-23023 June 1988 Insp Repts 50-348/88-20 & 50-364/88-20 on 880516-0610. Violation Noted.Major Areas inspected:post-refueling Startup Tests,Review of Completed Core Surveillance Procedures & Licensee Related Procedures IR 05000348/19880161988-06-0808 June 1988 Errata to Insp Repts 50-348/88-16 & 50-364/88-16 Revising App a to Correct Refs to Asco Solenoid Valves & Valve Numbers IR 05000348/19880181988-06-0202 June 1988 Insp Repts 50-348/88-18 & 50-364/88-18 on 880509-13.No Violations or Deviations Noted.Major Areas Inspected: Containment Tendon Surveillance Program,Snubber Surveillance Program,Ie Info Notice 85-045 IR 05000348/19880171988-05-26026 May 1988 Insp Repts 50-348/88-17 & 50-364/88-17 on 880502-06.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Program Activities Associated W/Requested Relief from ASME Code Requirements.Unresolved Item Noted IR 05000348/19880151988-05-25025 May 1988 Insp Repts 50-348/88-15 & 50-364/88-15 on 880411-0510.No Violations or Deviations Noted.Major Areas Inspected:Reviews Previous Enforcement Matters,Montly Surveillance Observation & Montly Maint Observation ML20154P6001988-05-19019 May 1988 Insp Repts 50-348/88-10 & 50-364/88-10 on 880328-0511. Violations Noted.Major Areas Inspected:Liquid & Gaseous Radwaste Mgt,Effluent Monitoring & Followup on Unresolved Item ML20154P6241988-05-17017 May 1988 Insp Repts 50-348/88-16 & 50-364/88-16 on 880419-21.No Violations or Deviations Noted.Major Areas Inspected:Environ Qualification of Electrical Equipment & Followup of Unresolved Items IR 05000348/19880141988-05-11011 May 1988 Insp Repts 50-348/88-14 & 50-364/88-14 on 880411-15.No Violations or Deviations Noted.Major Areas Inspected:Unit 1 Inservice Insp Activities,Including Remote Ultrasonic Exam of Reactor Vessel Welds IR 05000348/19880051988-05-11011 May 1988 Insp Repts 50-348/88-05 & 50-364/88-05 on 880222-26 & 0307-11.Violations Noted.Major Areas Inspected:Evaluation of Effectiveness of Various Plant Groups Including Operations, Maint,Qa,Engineering & Training for Safe Plant Operation IR 05000348/19880131988-05-10010 May 1988 Insp Repts 50-348/88-13 & 50-364/88-13 on 880404-08. Deviation Noted.Major Areas Inspected:Fire Protection & Prevention IR 05000348/19880111988-04-22022 April 1988 Insp Repts 50-348/88-11 & 50-364/88-11 on 880328-31.No Violations or Deviations Noted.Major Areas Inspected: Documentation Review for Welding Activities & NDE Re Safety Injection Sys IR 05000348/19880081988-04-21021 April 1988 Insp Repts 50-348/88-08 & 50-364/88-08 on 880311-0410.No Violations or Deviations Noted.Major Areas Inspected:Review of Monthly Surveillance Observation,Monthly Maint Observation & Physical Security Program ML20151N8811988-04-13013 April 1988 Partially Withheld Insp Repts 50-348/88-09 & 50-364/88-09 on 880321-24 (Ref 10CFR2.790 & 73.21).Violation Noted.Major Areas Inspected:Security Organization,Records,Repts,Testing, Maint,Locks,Keys,Combinations & Physical Barriers IR 05000348/19880011988-03-31031 March 1988 Insp Repts 50-348/88-01 & 50-364/88-01 on 880104-07.No Violations or Deviations Noted.Major Areas Inspected: Allegations Re Facility ML20148M9511988-03-28028 March 1988 Insp Repts 50-348/88-07 & 50-364/88-07 on 880211-0310.No Violations or Deviations Noted.Major Areas Inspected:Review of Monthly Surveillance & Maint Observations,Radiological Protection Program & Physical Security Program ML20148E6271988-03-16016 March 1988 Insp Repts 50-348/88-06 & 50-364/88-06 on 880229-0304. Violations Noted.Major Areas Inspected:Operational Readiness of Site Emergency Preparedness Program & to Determine If Changes to Emergency Preparedness Meet NRC Requirements ML20148E3571988-03-0101 March 1988 Insp Repts 50-348/87-37 & 50-364/87-37 on 871216-18.Util Noted One Violation Re Employee Failure to Sign in on Radiation Work Permit.Major Areas Inspected:Followup on Allegations Pertaining to Radiation Protection Program 1990-09-14
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000348/19990051999-09-0202 September 1999 Insp Repts 50-348/99-05 & 50-364/99-05 on 990627-0807.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000348/19990041999-07-26026 July 1999 Insp Repts 50-348/99-04 & 50-364/99-04 on 990516-0626.One Noncited Violation Identified.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML20210H1591999-07-23023 July 1999 Notice of Violation from Insp on 990308-10.Violation Noted: from Time of Receipt of Alarm Until Arrival at Three Different Vital Areas,Response Objective & Physical Security Plan Were Not Met IR 05000348/19990031999-06-10010 June 1999 Insp Repts 50-348/99-03 & 50-364/99-03 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000348/19990021999-04-29029 April 1999 Insp Repts 50-348/99-02 & 50-364/99-02 on 990221-0403.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20205Q1721999-04-0606 April 1999 Partially Withheld Insp Repts 50-348/99-09 & 50-364/99-09 on 990308-10 (Ref 10CFR73.21).Non-cited Violation Identified. Major Areas Inspected:Area of Plant Support Re Physical Security Program for Power Reactors IR 05000348/19990011999-03-19019 March 1999 Insp Repts 50-348/99-01 & 50-364/99-01 on 990110-0220. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000348/19980081999-02-0202 February 1999 Insp Repts 50-348/98-08 & 50-364/98-08 on 981129-990109.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000348/19980141999-01-0808 January 1999 Partially Withheld Insp Repts 50-348/98-14 & 50-364/98-14 on 981207-10 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress IR 05000348/19980071998-12-28028 December 1998 Insp Repts 50-348/98-07 & 50-364/98-07 on 981018-1128.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000348/19980061998-11-10010 November 1998 Insp Repts 50-348/98-06 & 50-364/98-06 on 980830-1017.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000348/19980101998-11-0303 November 1998 Insp Repts 50-348/98-10 & 50-364/98-10 on 980908-11.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise & Response in Control Room Simulator & Technical Support Ctr IR 05000348/19980051998-09-28028 September 1998 Insp Repts 50-348/98-05 & 50-364/98-05 on 980712-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19980041998-08-10010 August 1998 Insp Repts 50-348/98-04 & 50-364/98-04 on 980601-0711.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20236J6971998-07-0101 July 1998 Notice of Violation from Insp on 980412-0530.Violation Noted:Several Conditions Adverse to Quality Associated W/Cr Ventilation Sys Were Not Promptly Corrected.Conditions Inappropriately Closed Out Before Adequate C/As Completed ML20236J7021998-07-0101 July 1998 Insp Repts 50-348/98-03 & 50-364/98-03 on 980412-0530.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20236J8121998-06-29029 June 1998 SALP Repts 50-348/98-99 & 50-364/98-99 Covering Period 961124-980530 IR 05000348/19980091998-05-11011 May 1998 Special Insp Repts 50-348/98-09 & 50-364/98-09 on 980323-25. Violations Noted.Major Areas Inspected:Follow Up on OI Rept 2-97-011 Issued on 980209 Re Improper Weld Repair IR 05000348/19980021998-05-0808 May 1998 Insp Repts 50-348/98-02 & 50-364/98-02 on 980221-0411.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19983001998-04-0606 April 1998 NRC Operator Licensing Exam Repts 50-348/98-300 & 50-364/98-300 (Including Completed Tests) for Exams Administered on 980312-13.Concluded Candidates Performance on Written & JPM re-take Exams Satisfactory ML20217E5921998-03-23023 March 1998 Notice of Violation from Insp on 980111-0212.Violation Noted:While Performing Maint on 1A Centrifugal Charging Pump,Maint Personnel Violated Requirements of FNP-0-M-001, Rev 13 IR 05000348/19980011998-03-23023 March 1998 Insp Repts 50-348/98-01 & 50-364/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-013, on 980308,util Declared NOUE Due to High River Level & Subsequent Flooding.Licensee Established Constant Communications W/Early,Ga & Houston County,Al.Resident Inspectors Are Monitoring Licensee Activities1998-03-0909 March 1998 PNO-II-98-013:on 980308,util Declared NOUE Due to High River Level & Subsequent Flooding.Licensee Established Constant Communications W/Early,Ga & Houston County,Al.Resident Inspectors Are Monitoring Licensee Activities IR 05000348/19970151998-02-0909 February 1998 Insp Repts 50-348/97-15 & 50-364/97-15 on 971130-980110. No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20198N9961997-12-29029 December 1997 Insp Repts 50-348/97-14 & 50-364/97-14 on 971019-1129. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20198N9481997-12-29029 December 1997 Notice of Violation from Insp on 971019-1129.Violation Noted:As Early as June 1985,licensee Identified Degradation of Cork Seal Between Containment & Auxiliary Bldg Walls, Condition Adverse to Quality IR 05000348/19970131997-11-20020 November 1997 Partially Withheld Insp Repts 50-348/97-13 & 50-364/97-13 on 971021-24 (Ref 10CFR73.21).Major Areas Inspected:Physical Security Program for Power Reactors ML20199H1281997-11-17017 November 1997 Notice of Violation from Insp on 970907-1018.Violations Noted:Battery Capacity After Svc Test Was Inadequate & Check Valve V003 & V002D F & H Were Not Flow Tested in Manner That Proves That Disk Travels to Seat on Cessation ML20199H1541997-11-17017 November 1997 Insp Repts 50-348/97-11 & 50-364/97-11 on 970907-1018. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000348/19970071997-10-10010 October 1997 Insp Repts 50-348/97-07 & 50-364/97-07 on 970825-29.No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program,Including Problem Identification & Resolution IR 05000348/19970101997-10-0606 October 1997 Insp Repts 50-348/97-10 & 50-364/97-10 on 970803-0906. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20211Q9391997-10-0606 October 1997 Notice of Violation from Insp on 970803-0906.Violation Noted:As of 970906 Licensee Installed One 1-inch Thick Wrap of Kaowool on Sides & Bottoms of Raceways BDE-9 & BDE-15, Carrying Train B Charging Pump Power Cable in Fire Area IR 05000348/19970121997-09-26026 September 1997 Insp Repts 50-348/97-12 & 50-364/97-12 on 970818-22. Violations Noted.Major Areas Inspected:Review of Fire Protection Program Activities to Support Design Basis of Silicone Foam Fire Barrier Penetration Seals ML20211K8161997-09-26026 September 1997 Notice of Violation from Insp on 970818-22.Violation Noted: Noted:Nrc Identified That Licensee Failed to Correctly Translate Applicable Design Specfication Input Requirements for Kaowool Electrical Raceway Fire Barrier Sys at Plant IR 05000348/19970081997-08-28028 August 1997 Insp Repts 50-348/97-08 & 50-364/97-08 on 970622-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20217R2021997-08-28028 August 1997 Notice of Violation from Insp on 970622-0802.Violation Noted:On 970616,most of M&TE Used Onsite Did Not Have Written & Approved Calibration Procedures PNO-II-97-039A, on 970720,Hurricane Danny Downgraded to Depression.Storm Disipated Without Reaching Farley Nuclear Plant.Farley Nuclear Plant Experienced Light Rain W/Both Units Remaining at Full Power1997-07-21021 July 1997 PNO-II-97-039A:on 970720,Hurricane Danny Downgraded to Depression.Storm Disipated Without Reaching Farley Nuclear Plant.Farley Nuclear Plant Experienced Light Rain W/Both Units Remaining at Full Power PNO-II-97-039, on 970718,response Was Made to Hurricane Danny.Region II State Liason Officer Has Been in Contact W/Fema & State of Al.Plant Staff Taking Precautionary Measures in Preparation for High Wind Conditions1997-07-18018 July 1997 PNO-II-97-039:on 970718,response Was Made to Hurricane Danny.Region II State Liason Officer Has Been in Contact W/Fema & State of Al.Plant Staff Taking Precautionary Measures in Preparation for High Wind Conditions IR 05000348/19970061997-07-18018 July 1997 Insp Repts 50-348/97-06 & 50-364/97-06 on 970511-0621.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20148K6431997-06-0909 June 1997 Notice of Violation from Insp on 970330-0510.Violation Noted:On 970321,facility Licensee Physician Determined That Licensed Operator Eyesight No Longer Met Min Stds Required by 10CFR55.33(a)(1) as Measured by Std of ANSI/ANS-3.4-1983 ML20148K6511997-06-0909 June 1997 Insp Repts 50-348/97-05 & 50-364/97-05 on 970330-0510. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19972011997-05-13013 May 1997 Insp Repts 50-348/97-201 & 50-364/97-201 on 970127-0314.No Violations Noted.Major Areas Inspected:Engineering, Auxiliary Feedwater Sys,Component Cooling Water Sys & Sys Interface Design Review ML20196G4241997-05-0606 May 1997 Notice of Violation from Insp Completed on 970314.Violation Noted:Prior to 970314,licensee Failed to Prescribe Documented Instructions or Procedures to Implement Listed Activities Affecting Quality of Operation of PRF Sys ML20138J6661997-04-28028 April 1997 Insp Repts 50-348/97-03 & 50-364/97-03 on 970216-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support,Including Health Physics IR 05000348/19973001997-04-22022 April 1997 Exam Repts 50-348/97-300 & 50-364/97-300 on 970324-27.Exam Results:Two of 5 Applicants Passed Exam.One Was Grades as Marginal Pass ML20137U6021997-04-0202 April 1997 Insp Repts 50-348/97-04 & 50-364/97-04 on 970125-0314. Violations Noted.Major Areas Inspected:Detailed Esfs Review & Walkdown of Units 1 & 2 PRF Sys,Including Associated Surveillance Test & Sys Design Requirements ML20140B7851997-03-17017 March 1997 Notice of Violation from Insp on 970105-0215.Violation Noted:Test Engineer Failed to Comply W/Procedural Requirements of FNP-1-STP-124.0 During Performance Testing of Plant Penetration Room Filtration Sys Train a ML20140B7921997-03-17017 March 1997 Insp Repts 50-348/97-01 & 50-364/97-01 on 970104-0215. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000348/19960151997-02-0303 February 1997 Insp Repts 50-348/96-15 & 50-364/96-15 on 961124-970104.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134G3961997-01-24024 January 1997 Insp Repts 50-348/96-14 & 50-364/96-14 on 961209-13.No Violations Noted.Major Areas Inspected:Biennial Emergency Preparedness Exercise 1999-09-02
[Table view] |
Inspection Report - Farley - 1988014 |
---|
|
|
Text
_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ . _ _ .-. _
_ - _ _ , _ _ -
.-' .
'
.
pa nuou 3*. ~' t UNITED STATES
.
g g NUCLEAR REGULATORY COMMISSION o e REGION ll
. 101 MARIETTA ST. ,,,,, ATLANTA. GEORGIA 30323 Report Nos.: 50-348/88-14,50-364/88-14 Licensee: Alabama Power Company 600 North 18th Street Birmingham, AL 35291-0400 Docket Nos.: 50-348, 50-364 License Nos.: NPF-2, NPF-8 Facility Name: Farley 1 & 2 Inspection Conducted- April 11-15, 1988 Inspectors: . [, %h .f- /O-68 R. W. Newsdme Date Signed
J. L. Colef sw $
[j" (
G /O-AA Date Signed Approved by: ,
t J. J. Blake, ChTef
-
AAT7 M r;
k g
[///k[
Date Signed Materials and Processes SectMn Division of Reactor Safety SUMMARY Scope: This routine, announced inspection was in the areas of Unit 1 inservice inspection (ISI) activities including the remote ultrasonic (UT) examination of the reactor vessel welds, manual nondestruutive examination (NDE) conducted on the balance of plant piping welds and components, and the eddy current (EC)
examinations conducted on the steam generator (SG) tubing. A review of the Unit 1, first interval, hydrostatic test program was conducted to determine system testing completeness and a commitment agreed to by the licensee as a result of the December 1987, Unit 2, through wall crack in the Loop B safety injection system (SIS) w'as addresse Results: No vic:ations or deviations were identifie PDR ADOCK 05000348 g DCD
. . . - - -
.-
.
.. .
.
.
REPORT DETAILS Persons Contacted Licensee Employees
- R. Coleman, Systems Performance Supervisor
- S. Fulmer, Supervisor, Safety Audit and Engineering Review
- D. Hartline, Systems Performance Enoineering Supervisor
- C. Levy, General Plant Engineer
- Shipman, Assistant General Manager, Support
- G. Waymire, General Plant Engineer Other licensee employees contacted included engineers, technicians, security force members, and office personne Other Organizations J. Campbell, ISI Coordinator, Westinghouse Electric Corp. (W)
K. Jones, Southern Company Services (SCS) Level III D. Kunek, Reactor Vessel ISI Level III, W NRC Resident Inspector
- Bradford, Senior Resident Inspector
- Attended exit interview Exit Interview The inspection scope and findings were sumarfzed on April 15, 1988, with those persons indicated in paragraph 1 above. The inspectors described the areas inspected and discussed in detail the inspection findings. No dissenting comments were received from the licensee. The following new items were identified during this inspection:
(0 pen) Inspector rollowup Item (IFI) 50-348/88-14-01, Final l
Disposition of Reactor Vessel Indications, Paragraph 5.b.(1)(a).
(0 pen) IFI 50-348/88-14-02, Valve QV198 is Incorrectly Identified on CVCS Dw D-175039 Revision 22 Sheet 2, Paragraph 6 a.
l (0 pen)IFI 50-348/88-14-03, Second Interval Hydrostatic Test Scheduling, Paragraph 6.b.
l (0 pen) IFI 50-348/88-14-04, Clarification of Relief Request Approval
'
for Service Water Piping, Component Cooling Piping, and Chemical and Volume Control System Piping, Paragraph 6 b.
I
l E
_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ . .. __-_ - ____-- --___ _ __________-_ _-__ ____ -_ _ _ _ _ _ _ _
-
l
-
. .
.
p
The licensee did. identify some material as proprietary during this inspection, but this material is not included in this inspection repor NOTE: An alphabetical tabulation of acronyms and abbreviations used in this report is listed in Paragraph . Licensee Action on Previous Enforcement Matters This subject was not addressed in the inspectio . Unresolved Items Unresolved items were not identified during this inspectio . Inservice Inspection (ISI) - Nondestructive Examinations (NDE) Unit 1 The inspectors examined documents, activities and records as indicated below to determine whether ISI was being conducted in accordance with applicable procedures, regulatory requirements, and licensee commitment The applicable codes for ISI are the American Society of Mechanical Engineers Boiler and Pressure Vessel (ASME B&PV) Code, Section XI, 1974 Edition with addenda through Summer 1975 for the first interval, third period, outage number three and the ASME B&PV Code, Section XI,1983 Edition with Summer 1983 addenda for -the second interval, first period, outage number on Westinghouse (W) is the ISI contractor and Southern Company Services (SCS) is providing the licensee's technical overview of the ISI activities. Conam Inspection Services personnel are conducting a second review of all Steam Generator EC examination data, Review of Procedures Unit 1 and 2 (73052)
(1) The inspectors reviewed the procedures indicated below to determine whether the procedures were consistent with regulatory requirements and licensee commitment The procedures were also reviewed in the areas of procedure approval, requirements for qualification of NDE personnel and compilation of required records; and if applicable, division of responsibility between the licensee and contractor personnel if contractor personnel are involved in the ISI effor Procedure ID Title FNP-ISI 47 (R-0) Manual Ultrasonic Examination of Welds In Vessels FNP-ISI-206 (R-0) Manual Ultrasonic Examination of Welds FNP-154-ALA (R-1) Remote Inservice Inspection of Reactor Vessels
<
'
': .
'
.
.
Procedure ID Title
~
(cont'd)
FNP-ISI-70 (R-0) Magnetic Particle Examinations FNP-ISI-11 (R-0) Liquid Penetrant Examination FNP-DOC-101(R-0) Preservice And Inservice Examination Procedure Documentation MRS 2.4.2-APC-6 (R-3) Digital Multi-Frequency Eddy Current Inspection of Preservice
,
and Inservice Heat Exchanger Tubing ALA-1 (R-0) Data Analysis Test Program (2) The inspectors reviewed the UT procedures to ascertain whether they had been reviewed and approved in accordance with the licensee's established QA procedures. The procedures were reviewed for technical adequacy and for conformance with the ASME Code, Section V, Article 5 and other licensee committments/
requirements in the following areas: type of apparatus used; extent of coverage of weldment; calibration requirements; search units; beam angles; DAC curves; reference level for monitoring discontinuities; method for demonstrating penetration; limits for evaluating and recording indications; recording significant indications; and, acceptance limit (3) The inspectors reviewed EC procedures MRS-2.4.2 APC-6 and ALA-1 for technical content relative to: multichannel examination equipment is specified; method of examination is specified including probe speed during inspection; method of calibration ard calibration sequence; description of colibration reference standard; applicable criteria for test data interpretation and indication reporting parameters; and, acceptance criteri (4) The inspectors reviewed PT procedure FNP-ISI-11 to ascertain whether it had been reviewed and approved in accordance with the licensee's established QA procedures. The above procedure was I- reviewed for technical adequacy and conformance with the ASME
,
Code Section V, Article 6, and other licensee committments/
l requirements in the following areas: specified method;
'
penetrant material identification; penetrant materials analyzed for sulfur; penetrant materials analyzed for total halogens; acceptable pre-examination surface; drying time; method of penetrant application; surface temperature; solvent removal; surface drying prior to developing; type of developer; examination technique; evaluation technique; and procedure l
requalificatio .
._ __ _ .
.- . !
. .
i (5) The inspectors reviewed MT procedure FNP-ISI-70 to ascertain whether it had been reviewed and approved in accordance with the licensee's established QA procedure The procedure was reviewed for technical adequacy and for conformance with the ASME Code Section V, Article 7, and other licensee commitments /
requirements in the following areas: examination method; contrast of dry powder particle color with background; surface temperature; suspension medium for wet particles; viewing conditions; examination overlap and directions; pole or prod spacing; current or lifting power (yoke); and, acceptance criteri b. Observation of Work and Work Activities Unit 1 (73753)
The inspectors observed work activities and reviewed certification records of equipment, materials and NDE personnel which had been and will be utilized during the required ISI examinations during this outage. The observations and reviews conducted by the inspectors are documented belo (1) The inspectors observed calibration activities and the in-process. ultrasonic examinations being conducted on portions of the welds indicated below. The observations were compared with the applicable procedures and the Code in the following areas: availability of and compliance with approved Non-destructive Examination (NDE) procedure; use of knowledgeable NDE personnel; use of NDE personnel qualified to the proper level; type of apparatus used; extent of coverage of weldment; calibration requirements; search units; beam angles; DAC curves; reference level for monitoring discontinuities; method of demonstrating penetration; limits of evaluating and recording indications; recording significant indications; and, acceptance limits.
,
Weld ID Sketch Description Exam. Code 3 ALA-1-0101 Reactor Vessel Middle 1974S75 Shell Course Lon Weld 4 ALA-1-0101 Reactor Vessel Middle 1974S75 Shell Course Long. Weld 6 ALA-1-0101 Reactor Vessel Lower 1974S75 Shell Course Long. Weld 16 ALA-2-4101 9" Main Steam Pipe Weld 1983S83
_ .-______ -______-__-_ - _ - _ _ -
'
- .
'
.
.
Weld ID Sketch Description Exam. Code 17 ALA-2-4101 9" Main Steam Pipe Weld 1983S83 18 ALA-2-4101 9" Main Steam Pipe Weld 1983S83 19 ALA-2-4101 9" Main Steam Pipe Weld 1983S83 20 ALA-2-4101 9" Main Stram Pipe Weld 1983S83 (a) While observing the RV weld inspections, the inspectors observed data being recorded relative to a small indication located at approximately 255" below the RV flange, adjacent to Weld #6, one of the two lower shell course longitudinal welds. The da a was being recorded in order to establish the orientation and dimensions of the indication necessary in order to determine the accepta-bili ty o'f the indication relative to the acceptance criteria in ASME B&PV Code Section XI. This particular indication appeared to be very near the interface between the RV ferritic steel plate base material and the stainless steel cladding on the inside surface of the R Subsequent discussions with AP, SCS, and W personnel disclosed that an additional small indication had been noted during the Weld #6 examination. This indication is located approximately 323" below the RV flange, some 48" below the other indicatio Further discussions with the licensee disclosed that during this inspection, volumetric indications were detected during the examination of Weld #7, the other lower shell course longitudinal weld. Also, indications were detected during an ISI examination in 1984, in the Loop 2, outlet nozzle-to-shell weld, designated as Weld 21 on drawing ALA-1-1100, and this weld is scheduled to be examined during this inspectio The licensee has decided to enlist the aid of an additional ultrasonic inspection system, UDRPS, to assist in the
! indication dimensioning and positioning process because the ir.dications adjacent to Weld 6 appear to be very near the l
'
clad /basemetal interface and may have to be declared surface indications under the standards for evaluation in l the ASME B&PV Code and may possibly fall into a rejectable l categor Also, the licensee wishes to utilize the UDRPS I to better characterize the indications noted in Weld 21.
t
!
l
_
-
-
l
. .
.
'
Not all of the RV weld examinations had been completed by the end of this inspection and the final dimensioning and subsequent disposition of the dctected indications had not been completed. The inspectors informed the licensee that in order to track and later review the final disposition of the currently known indications and any other indications that might be identified during the remaining RV examinations, that the following item would be opened and identified as IFI 50-348/88-14-01, Fina l Disposition of Reactor Vessel Indication (b) In association with the examinations of the reactor vessel welds utilizing the W remote examination tool, the inspectors reviewed the "Reactor Vessel Examination Program Plan" to confirm the extent of weldment coverage, calibration requirements, search units, search unit overlap requirements, beam angles, DAC curves, reference level for indication detection, and indication recording limit (c) The circumferential examination of Welds 16 thru 20, on Sketch ALA-2-4101, required the use of a 30 shear wave examination because a 45 sound beam does not extend to the I.D. of the pipe due to the ratio of pipe 0.0 /I.D. ard the thickness of the pipe wall. The inspectors observed and independently verified the ultrasonic equipment calibration on calibration Block Number ALA-030 with the 30 shear wave probe and observed portions of the circumferential examination of these welds with the 30 shear wav (2) The inspectors conducted an ultrasonic verification examinaticn, using W equipment, on portions of Weld 16, Sketch ALA-2-410 The examination was performed in order to evaluate the technical adequacy of the ultrasonic examination procedure being used by
- the licensee's contractor to perform ultrasonic examinations and to assess the validity of the information being reported by the ultrasonic examiners, The verification examination indicated
! that the procedure used to conduct the examinations appears to l be adequate for the application and the reported information compared favorably with the verification examinatio (L) The following listed ultrasonic equipment and materials certification records were reviewed:
Ultrasonic Instruments l
Manufacturer /Model Serial No.
i
! Sonic /NK-1 784523 l
l l
l t
. . .. . - . . . .. . .
-
-
'
l
. .
.
'
Manufacturer /Model Serial N Sonic /MK-1 00890E Sonic /MK-1 07853E The inspectors reviewed spectrum analysis data for the ultrasonic transducers tabulated below:
Size Frequency Serial N .5 2.25 MHz Y8003 .25 MHz Y11572 .25 MHz Y11575 .0 MHz C02600 .25 MHz 53734 Size Frequency Serial ?! .75 2.25 MHz T-2230
.75 1.0 MHz T-2234
.375 2.25 MHz 031255
.75 5.0 MHz J19135
.25 2.25 MHz M17430 Ultrasonic Couplant Batch 8767, Sonotrace 40 Ultrasonic Calibration Blocks, ALA-030, ALA-RV-5, ALA-RV-7, ALA-24, and ALA-2 ,
(4) The inspcetors reviewed the below listed liquid penetrant materials certification records to ascertain if the sulfur and halogen content of the material was within acceptable content limit Materials Batch Number Liquid Penetrant 85LO45 Cleaner / Remover 87K046, 87L009 Developer 85M035 (5) The inspectors reviewed documentation indicating that a ten pound lift test had been performed on magnetic particle AC yoke 4309 and a review of negnetic particle material certification records for Batch Numbers 86G028 and 85B028 indicated the sulfur and halogen content of the material was within acceptable content limit . _ . _ . - . .
-
-
l
. .
.
(6) The inspectors observed the Eddy Current activities indicated belo The observations were compared with the applicable procedures and the Code in the following areas: method for maximum sensitivity is applied; method for determining materials permeability; method of examination has been recorded; examination equipment has been calibrated using the applicable calibration reference; amplitude and phase has been established with the use of the applicable calibration reference and is recalibrated at predetermined frequency; required coverage of steam generator tubes occurs during the examination; acceptance criteria is specified or referenced and is consistant with the procedure or the ASME Code; and, results are consistant with acceptance criteri (a) In-process tube data acquisition and an equipment calibration verification for SG-C, was observed for the following steam generator tubes:
SG-A SG-B SG-C Tube ID Tube ID Tube ID Row Column Method Row Column Method Row Column Method 15 61 RPC 6 49 Bo Bo RPC 6 48 Bo Bo RPC 8 92 Bo Bo . 53 RPC 3 92 Bo Bo RPC 3 83 Bo Bo RPC 3 82 Bo Bo Bo Bo Bo Bo Bob.
(b) The inspectors observed the in-process EC data analysis and evaluation, and equipment calibration verification checks, being conducted by W (primary) and Conam (secondary) on the below listed SG tubes:
W Evaluation SG-A SG-B SG-C Tube ID Tube ID Tube ID Row Column Type Row Column Type Row Column Type 2 54 RPC 4 65 Bo x1 2 55 RPC 4 64 Bo x1 2 56 RPC 4 63 Bo x1
- __ . . _ _ .. _
_ . _ . , - - _ . -
_
1 :
.
. .
.
'
SG-A SG-B SG-C Tube ID Tube ID Tube ID (cont'd)
Row Column Method Row Column Method Row Column Method 2 59 RPC 3 93 Bo x1 2 60 RPC 3 92 Bo x1 2 61 RPC 3 91 Bo x1 2 62 RPC 3 90 Bo x1 2 63 RPC 3 89 Bo x1 2 64 RPC 3 88 Bo x1 2 65 RPC 4 51 Bo x1 2 66 RPC 4 50 Bo x1 2 67 RPC 4 49 Bo x1 2 68 RPC 4 48 Bo x1 2 69 RPC 3 71 Bo x1 3 70 Bo x1 3 69 Bo Conam Evaluation SG-A SG-C Tube 10 Tube ID Row Column Type Row Column Type 2 15 RPC 16 70 8x1 2 17 RPC 4 68 8x1 2 18 RPC 7 68 8x1 2 19 RPC 13 68 8x1 2 21 RPC 15 68 8x1 2 22 RPC 16 68 8x1 2 23 RPC 19 68 8x1 25 68 8x1 31 68 8x1 40 68 8x1 31 6S 8x1 28 66 8x1 16 66 8x1 (c) While observing the evaluation activities for the above listed tubes, the inspectors jointly evaluated a sample of the data with both the primary and secondary analyst No significant discrepancies were note (d) Certification records for EC calibration standards Z4420,
!
Z5180, and tube support ring Z5181 were reviewed for l material type, correct fabrication, and artificial flaw location / size, l
,
- :
. .
.
(7) The inspector reviewed the qualification documentation for the below listed W and Conam examiners in the following areas:
employar's name; person certified; activity qualified to perform; effective period of certification; signature of employer's designated r.>presentative; basis used for certification; and annual visual acuity, color vision examination, and periodic recertificatio Method - Level Company Examiner UT PT MT EC VT - 1 - 2 - 3 - 4
- - -
Conam DMC - - -
III -
Conam MAG - - -
IIA - - - -
Conam CLG - - -
IIA - - - -
Conam MJM - - -
IIA - - - -
Conam JPT - - -
IIA - - - -
W WFS - - -
III - - - -
U TEG - - -
IIA - - - -
W VL - - -
IIA - - - -
W BC - - -
III - - - -
W EPL - - -
IIA - - - -
W JJC - - -
IIA - - - -
9 LDL - - -
III - - - -
9 JVK - - -
II - - - -
U DMM - - -
I - - - -
W BJA II II II -
II - II -
W RPL I - - - - - - -
W RAH III - - - - - - - DK III - - - - - - -
U GP II - - - - - - -
W TJW II - - - - - - -
W HMA I I I - I I I I l
W RSC I II II -
I I I I U WWM II II II -
II II II II W GAM II II II -
II II II II W RLS III III - -
II - II - Inservice Inspection, Data Review and Evaluation, Unit 1 (73755)
(1) Records of completed balance of plant welds and component nondestructive examinations were selected and reviewed to ascertain whether: the method (s), technique and extent of the examination complied with the ISI plan and applicable NDE procedures; findings were properly recorded and evaluated by qualified personnel; programmatic deviations were recorded as
-
-
. 1
.
.
l
.
required; personnel, instruments, calibration blocks and NDE materials (penertants, couplants) were designated. Records ;
I selected for this review are listed belo Sketch N Item / Weld ID NDE Method ALA-1-5200 R. C. Pump B UT Seal House Flange ALA-2-4101 5 UT ALA-2-4101 4 MT ALA-2-4101 28 MT ALA-2-4500 9 UT ALA-2-4500 10 UT ALA-2-4500 11 UT ALA-2-4500 12 UT ALA-2-4500 24 UT ALA-2-4500 44 UT ALA-2-4101 21 UT ALA-2-4101 22 UT ALA-2-4101 23 UT ALA-2-4101 24 UT ALA-2-4101 25 UT ALA-2-4500 13 UT ALA-1-5200 Bolts - 890, 742, MT 797, 751 ALA-2-4508 36 PT ALA-2-4508 54 PT ALA-2-4508 44L1 PT ALA-2-4508 44L2 PT (2) Steam Generator Tubing Eddy Current Examination Data Review (a) The inspectors reviewed records of the eddy current examinations indicated belo The reviews were compared with the applicable procedures and the Code in the following areas: the multichannel Eddy Current examination equipment has been identified; material permeability has been recorded; method of examination has been recorded; and, results art consistent with acceptance criteri .
.
. .
.
'
SG-A SG-8 SG-C TuSe To Tube 10 Tube 10 Row Column ,Tye Row Column h Row Column- _ Type 19- 8 Bo ' 3 Bo Bo Bo Bo Bo Bo Bo Bo Bo Bo Bo Bo Bo Bo Bo Bo Bo Bo Bo Bo RPC 31 50 RPC 20 26 RPC 15 19 RPC 7 28 RPC 3 27 RPC 13 27 RPC 24 37 RPC 12 48 RPC 4- 18 8x1 7 23 8x1 11 29 8x1 (b) At the conclusion of the NRC inspection all examinations had.not been completed. The inspectors discussed the EC program and status with the licensee and the preliminary EC examination status for the steam generators is listed belo SG-A SG-B SG-C Tubes with reportable 38 27 28 indications Possible tubes to be plugged 3 1 20 Tubes Scheduled Bo x1 665 680 655 RPC 131 94 123 Tubes Analyzed Bo x1 659 151 443 RPC 147 0 0 i
Within the areas inspected, no violations or deviations were identifie . ISI First Interval Hydrostatic Test Program Review - Unit 1 (73051)
(73052) (73755)
,
The Alabama Power Company ISI program for the Farley Nuclear Plant Unit 1 is conducted in accordance with requirements of Paragraph 4.0.5.a.2 of the l Technical Specifications, which in turn invokes the requirements in
- 10CFR50.55a(g). 10 CFR 50.55a(g) requires that piping and components of
! boiling and pressurized water reactor plants be examined and pressure
!
l
. _ . . . .
.
- .
.
.
~
tested to the requirements of Section XI of the ASME Code and that the examinations and tests be completed during each of four ten-year intervals. The ten-year intervals are calculated from the start date of commercial operation of the facilit The date of commercial operation for Farley Unit 1 is December 1,1977, and the first interval examinations and testing should have been completed in 1987. However, since Section XI of the ASME Boiler and Pressure Vessel Code allows extension of the interval of up to one year so that the interval can be made to correspond to a plant's outage schedule, the final completion date allowed by the code fer the first interval examination and testing on Unit 1 will be December 1, 1988. However, the licensee's hydrostatic program for the first interval was complete and testing in progress this outage was for the first period of the second interva The inspector reviewed the ISI program for ASME Code Class 1, 2 and 3 components, the ten year inspection plan for ASME Class 1 and 2 components, the ten year inspection plan for ASME Class 3 components and six hydrostatic test procedures. Test procedure interfaces of systems were confirmed and select relief requests were also examined to determine if the licensee had invoked the relief granted as requeste The six ASME Class 2 hydrostatic test procedures listed below were reviewed for technical content and the hydrostatic boundaries were re-established on drawings using the procedure's valve line-up sheets to verify test completenes Test N Procedure N Description of Test Hydro No. 8 FNP-1-STP-16 CVCS Low Pressure Letdown Hydro No. 9 FNP-1-STP-16 VCT, Connecting Lines and Charging Pumps Suction Hydro No. 11 FNP-1-STP-160.11 Letdown Line from 600 PSI Piping to VCT Hydro No. 13 FNP-1-160,13 Train 8 Main Steam, Main Feedwater, Aux. Feedwater, S/G Blowdown and Chemical Inspection Hydro No. 15 FNP-1-STP-160.16 Train A Containment Spray Hydro No. 17 FNP-1-STP-160.17 Train B Containment Spray The inspectors review of Alabama Power Company's hydrostatic program, plans and procedures for Class 1 and 2 components revealed that the licensee had fulfilled their 1st interval commitments as delineated in l their progra First interval plans accurately implemented the program, i
-_ .
'
'
. .
.
.
procedures were well written, valve lineup sheets listed all valves within the test and second verifications of the valve positions were performe Test boundary changes required because of the mode of operation were reconcile Responsible test personnel were knowledgeable of their systems and test requirements and final test records were complete and auditabl However, the inspectors review did reveal two findings that the licensee was requested to take action on because they affected the second interval program. These findings and the initial verbal licensee responses are as follows: Valve QV-198 was listed in first interval plan as a test boundary valve. This valve was identified on Drawing D-175039 as QV-19 Further review revealed the plan to be accurate and the drawing to be in erro This drawing error was also carried over to the second interval drawings. The licensee committed to revise the drawing to clarify the valve's identificatio The licensee's action will be tracked with Inspector Followup Item 50-348/88-14-02, Valve QV-198 is Incorrectly Identified on CVCS Drawing 0-175039 Rev. 22 Sheet The inspector reviewed the second interval plan to determine if the tests performed during the first interval, to the 1974 Edition of the ASME Code, were scheduled correctly with the requirements of the 1983 Edition of the Code that will be used for the second interval test The inspectors discovered that the tests were not scheduled in accordance with Table IWC-2500-1, Note 5, of the 1983 Edition of the Cod The licensee stated that the seccnd interval tests were scheduled as delineated in the plan to prevent too many tests falling in the last period of the interva The licensee however, agreed that a relief request or plan modification was applicable and agreed to take appropriate corrective action. This item will be tracked with Inspection Followup Item 50-348/88-14-03, Second Interval Hydrostatic Test Schedulin In addition to the above, the inspectors reviewed the program and relief requests for Class 3 components. The review of relief requests was conducted only on Class 3 components because the licensee had requested relief from the hydrostatic test requirements on the entire Class 3 program with the exception of portions of the auxiliary feedwater system and portions of the chemical and volume control systam. The inspector's review revealed that the actual relief requests were not definitive and lacked technical basis. In addition, NRC's Safety Evaluation Report for the service water, component cooling water, and chemical and volume control systems was written such that, it appeared to the inspectors that the NRC reviewer had not granted relief to the extent requested in the progra The licensee contacted the inspectors by telephone on April 18, 1988, and stated that NRC (NRR) would be contacted to determine whether the extent of the relief requested for these systems, had been grante Clarification would also be requested of the Safety Evaluation
_ _ _ _- ___- __ -_ _ __ _ _ _ _ _
_ _ _
_-
'
' '
-
. .
.
.
-
,
.
Report relief request approvals for items nine and ten of the repor This item will be tracked with Inspector Followup Item 50-348/88-14-04, Clarify Relief Request Approval for Service Water Piping, Component Cooling Piping and Chemical and Volume Control System Pipin Within the areas examined, no violation or deviation was identifie . Independent Inspection Unit 1 Licensee's Unit 1 commitment relative to the SIS cracked weld in Unit ~
(Refer to NRC report 50-348, 364/87-36 for specific details)
During the review of original fabrication radiographs for all similar system welds in the SIS Unit 1, a possible indication was noted in Weld Loop 3, as shown on Isometric /Grinnel Spool Number EG686/JF-16-38. (Same as weld #3 shown on ISI isometric drawing ALA-143). The licensee agreed to radiograph this weld during the next Unit 1 scheduled outage. Weld D, Loop 3, was radiographed and these film and associated documentation was reviewed by the inspectors. The radiographs reviewed did not show any evidence of the possible indication noted previously. This commitment is considered fulfille . Acronyms and Abbreviations ,
AC - Alternating Current AP -
Alabama Power ASME - American Society of Mechanical Engineers B&PV - Boiler and Pressure Vessel Bob. - Bobbin Coil CVCS - Chemical Volume Control System DAC - Distance Amplitude Curve EC -
Eddy Current Exam.- Examination ID -
Identification I.D. - Inside diameter IFI - Inspector Followup Item ISI - Inservice inspection MHz - Megahertz MT - Magnetic Particle Test NDE -
Nondestructive Examination N Number NPF - Nuclear Power Facility NRC - Nuclear Regulatory Commission NRR - Nuclear Reactor Regulation 0.D. - Outside diameter PT - Liquid penetrant QA - Quality Assurance R -
Revision
\
_ _ , _ _ . - - _ - _ . _ _ _ - . _ _ _ _ , . . _ . . _ _ _ _ . , _ . , , . _ ,
.c
'
- ,
-
,
.
.
R.C. - Reactor Coolant RPC - Rotating Pancake Coil RV - Reactor Vessel SCS - Southern Company Services SG -
Steam Generator SIS - Safety Injection System UDRPS - Ultrasonic Data Recording and Processing System UT -
Ultrasonic VCT -
Volume Control Tank VT -
Visual W - Westinghouse Electric Corporation