Notice of Violation from Insp on 990308-10.Violation Noted: from Time of Receipt of Alarm Until Arrival at Three Different Vital Areas,Response Objective & Physical Security Plan Were Not Met
ML20210H159
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/23/1999
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20210H135 List:
References
50-348-99-09, 50-364-99-09, NUDOCS 9908030291
Download: ML20210H159 (8)


Text

E .,,--

7 NOTICE OF VIOLATION L Southem Nuclear Operating Company, Inc. Docket Nos. 50-348, 50-364 Farley Nuclear Plants, Units 1 and 2 License Nos. NPF-2, NPF-8

- EA 99-172 l-  : During an NRC inspection conducted March 8-10,1999, a violation of NRC requirements was identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions, NUREG-1600, the violation is listed below:

Facility Operating Licenses NPF-2, Amendment 90, and NPF-8,' Amendment 83, dated November 22,' 1991, require the licensee to fully implement and maintain in effect all provisions of the Commission approved physical security, guard training and qualificatica, and safeguards contingency plans including amendments made pursuant to the provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

10 CFR 73.55(a) requires licensees, in part, to have a physical protection system designed to protect against the design basis threat of radiological sabotage. Section 73.55 also requires, in part, that licensees have an onsite physical security protection

!- system and security organization with capabilities to achieve this general objective.

Section 1.3 of the Physical Security Plan, Revision 0, dated September 29,1997, defines an armed response individual whose primary duty, in the event of attempted radiological sabotage, is to respond, armed and equipped, to delay or prevent such an act.

Section 7.1.2 of the Physical Security Plan, Revision 0, dated September 29,1997, provides that under normal conditions, from the time of receipt of an alarm until arrival at any vital area, security force members have sufficient time to intercept and engage an adversary force.

Contrary to above, on two occasions on March 9,1999, from the time of receipt of an alarm until arrival at three different vital areas, the response objective of 10 CFR 73.55 l and the Physical Security Plan were not met in that security force members failed to intercept and engage a mock adversary force to protect against radiological sabotage.

i This is a Severity Level IV Violation (Supplement Ill).

Pursuant to the provisions of 10 CFR 2.201, Southem Nuclear Operating Company is required to submit a written statement of explanation to the U.S. Nuclear Regulatory Commission, ATTN:  ;

Document Control Desk, Washington, DC 20555 with a copy to the Regional Administrator, Region ll, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days from the date of the letter transmitting this Notice of Violation (Notice).

This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full Enclosure 1 w a

Notice of Violation 2 compliance will be achieved. Your response may reference or include previous docketed correspondence, if the correspondence adequately addresses the required response. If an adequate reply is not received within the time specified in this Notice, an order or a Demand for j information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending the response time.

1

. Because your response will be placed in the NRC Public Document Room (PDR), to the extent  !

possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction. However, if you find it necessary to include such information, you should clearly indicate the specific information that you desire not to be placed in the PDR, and provide the legal basis to support your request for withholding the l information from the public.

In accordance with 10 CFR 19.11, you may be required to post this Notice within two working days.

Dated this 23rd day of July 1999 at Atlanta, Georgia

\ )

, pF-15-2995,~.832EPti. FWJM (E HRC FMLEt TO 14045624983 " 02 Timeline-FNP Security Initial Condition: Prior to 1200 hrs. on March 11, the Foot Patrol responder was posted for approx. 75% of the time at the current location of the new static response post inside the Main Protected Area.

Wednesday, March 10,1999 1100-1130 hrs. -NRC exit 1130-1200 hrs. (approx.) -FNP management discussion ofissues.

1230-1430 hrs.(approx.) -Security group personnel & Jerry Sims discuss strategy & nptions 1506-1523 hrs -Tour of diesel b1dg. by Sims, Dyar, Leach, to evaluate possible barrier enhancements and other strategies.

1600-1800 hrs. (approx.) -Began drafting Response Plan revision Thursday. March 11,1999 0600-0900 hrs (approx.) -Discussed proposed Response Plan changes with Security staff and supervision.

0900-1100 hrs. (approx.) -FinalW strategy & response changes incoqmrating new response posts and new strategies.

1200 hrs. Posted rww response post inside Main Protected Area. Briefed on new duties. I Briefed other affected response posts on revised strategy.

Disseminated new response requirements in the form of a directive, to all personnel. Personnel begin signing offimmediately.

Security personnel were trained on the new requirements on the 11* if they were on duty or as soon as they returned to duty. Approximately 80% of Security personnel were trained March 11, 12, a13. The rsmainder were trained thcreafter as they reported for duty.

1 L

l l

I I

-2 3 j

SNC 3 (cc w/encls cont'd)

J. D. Woodard Executive Vice President Southern Nuclear Operating Company, Inc.-

l P. O. Box 1295 Birmingham, AL 35201-1295 State Health Officer Alabama Department of Public Health 434 Monroe Street Montgomery, AL 36130-1701 1 l

M. Stanford Blanton Balch and Bingham Law Firm P. O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201 Chairman Houston County Commission P. O. Box 6406 Dothan, AL 36302 Rebecca V. Badham SAER Supervisor Southern Nuclear Operating Com?any l P. O. Box 470 Ashford, AL 36312 Distribution w/encls:

L. Plisco, Ril P. Skinner, Ril ,

A. Boland, Ril J. Lieberman, OE M. Padovan, NRR PUBLIC NRC Resident inspector U. S. Nuclear Regulatory Commission dyhl 7388 N. Stete Highway 95 W

[/

Columbia, AL 36319 g

  • SEE PREVIOUS CONCURRENCE m

/p'F,pt ,4 SEND TO PUBLIC DOCUMENT ROOM? (YES) / ll OFF3CE Ril:PR$1. . Ri l lDRLk. Ril:DRS RII:EICS MA RII:DRP.

Signature E) ]gthd W{ h I {,j,l V NAME *LHMES:tj *KBARR, i BMALLETT *SSPARKS

  • EVANS *LPLISCI' DATE 4]33/99 1 # /99 1]Je3 /99 / /99 A /99  % % /99 COPYT MES/ NO NEd NO 6ES } NO YES NO $ESl NO #fs) No V V V v -

4 e

  • l SNC 4 II OFFICE OE 2, Signature  %# g NAME *JLIEBESAu, If DATE W /99'i%,2 I/ /99 COPY? 'kES) NII.ECF YES NO OFFICI AL RECORD MY DOCUMENT NAME:S:\DRS\PSB\Faritr1.wpd i

I i

SNC 4 Distribution w/ encl:

L. Plisco, Rll P. Skinner, Ril A. Boland, Ril -

J. Lieberman, OE M. Padovan, NRR PUBLIC NRC Resident inspector U. S. Nuclear Regulatory Commission 7388 N. State Highway 95 Columbia, AL 36319 9sES.{RETiod SEND TO PUBLIC DOCUMENT R00M7 YES ll OFFICE RII:DRS R!l:DRS RII:DRS RIl:EICSt ORA RII:DRP Signature $ M My h NAME LHAYES KBARR BMALLETT SSIARKS EVANS LPLISCO DATE / /99 / /vP / /99 1 / 9 /99 / /99 / /99 COPY? YES No YES NO YES NO 6ES1 NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME:M:\ENFOP.CE\99 CASES \99172F AR.DIR\F ARLTR1.WPD cfLWW

, & tlYM &

/ '

11 0FFICE 98 Signature i NAME JL1EBERMAN DATE / /99 / /99 COPY? YES NO YES NO

1 Distribution w/ enc!:

L. Plisco, Rll P. Skinner, Rll A. Boland, Rll J. Lieberman, OE M. Padovan, NRR

PUBLIC NRC Resident inspector U. S. Nuclear Regulatory Commission 7388 N. State Highway 95 Columbia, AL 36319 l

i

  • SEE PREVIOUS CONCURRENCE SEND TO PUBLIC DOCUMENT R00M7 YES ll OFFICE RII:DRS RII:DRS Ril:DRS RJREICS , ORA R!l:DRP Signature M

NAME *LHAYES *KBARR BMALLETT RKS

  • EVANS *LPLISCO DATE / /99 / /99 / /99 1/63/99 / /99 / /99 COPY? YES NO YES NO YES N0 dS) NO YES NO YES NO l

OFFICE qed 1 ild f) b6 DATE 1/L"$/99 / /99 COPY? YES NO YES NO OFflCIAL RECORD COPY DOCUMENT NAf4EI:\?Nf 0RCE\99 CASES \99172FAR.DIR\F ARLEY.WPD l

2

L SNC 4 Distribution w/ encl:

L. Plisco, Ril P. Skinner, Ril

-G. Repp, RH h/

A. Boland, Rl

-J.Lki;rmar;,[I. OE - M . FA D *

-JrZimmerm:n, NRRd PUBLIC NRC Resident inspector U. S. Nuclear Regulatory Commission 7388 N. State Highway 95 Columbia, AL 36319 l

SEND TO PUBLIC DOCLMENT R00M7 YES ll OFFICE WI pl $ ,RII:DRS RII:DRS RII:EICS ORA RII:QPP ,

Signature JD p4V NW P NAME 'LHAYESL t;3ARR BMALLETT AB0 LAND EVANS LP Sch i DATE Y/A /99 1 / 1 /99 / /99 / /99 i/ IP/769 7 / L /99 COPY? '6ES) NO *dEd NO YES NO YES NO YES 50 ) YES M OFFICIA M ECORD COPY D E UMENT NAME:M:\ ENFORCE \99 CASES \99172FAR.DIR\FARLTRI.WPD II 0FFICE OE ORA Signature NAME JLIEBERMAN LREYES  !

DATE / /99 / /99 COPY? YES NO VES NO i

.