Annual Assessment Letter for Joseph M. Farley Nuclear Plant Unit 1 and Unit 2 (NRC Inspection Report 05000348/2012001 and 364/2012001)
ML13063A563
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/04/2013
From: Croteau R
Division Reactor Projects II
To: Lynch T
Southern Nuclear Operating Co
References
IR-12-001
Download: ML13063A563 (8)


Text

March 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 AND UNIT 2 (NRC INSPECTION REPORT 05000348/2012001 AND 364/2012001)

Dear Mr. Lynch:

On February 12, 2013, the NRC completed its end-of-cycle performance review of Joseph M.

Farley Nuclear Plant Unit 1 and Unit 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Farley Unit 1 and Unit 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Farley Unit 1 and Unit 2 during the 1st, 2nd, and 3rd quarters of 2012 was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because of a greater-than-green Security Cornerstone finding. After reviewing Farley Nuclear Plant Unit 1 and Unit 2 performance in addressing the greater-than-green finding, the NRC determined the performance at Farley Nuclear Plant Unit 1 and Unit 2 to be in the Licensee Response Column of the ROP Action Matrix as of October 1, 2012. The NRC determined the performance at Farley Unit 1 and Unit 2 during the most recent quarter was within the Licensee Response Column of the NRC=s ROP Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, the NRC also plans to conduct initial reactor operator license examinations. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections which will be sent via separate, non-publicly available correspondence. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Frank Ehrhardt at (404) 997-4611 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Richard P. Croteau, Director

Division of Reactor Projects

Docket No.: 50-348, 50-364 License No.: NPF-2, NPF-8

Enclosure: As Stated

cc w/encl: (See page 3)

_________________________

X SUNSI REVIEW COMPLETE OFFICE RII:RDP RII:DRP RII:DRP RII:DRP

SIGNATURE CWR /RA for/

FJE /RA/

RPC /RA/

NAME MMiller FEhrhardt WJones RCroteau

DATE 02/29/2013 02/27/2013

02/27/2013

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl:

C. Russ Dedrickson Fleet Support Supervisor Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Cheryl A. Gayheart Plant Manager Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

S. Kuczynski Chairman, President and CEO Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Leigh Perry SVP & General Counsel-Ops & SNC Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

D. G. Bost Chief Nuclear Officer Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Dennis R. Madison Vice President Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

T. E. Tynan Site Vice President Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Mark Williams Commissioner Georgia Department of Natural Resources Electronic Mail Distribution B. D. McKinney, Jr.

Regulatory Response Manager Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

D. W. Daughhetee Licensing Engineer Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

T. D. Honeycutt Regulatory Response Supervisor Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Bradley J. Adams Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

N. J. Stringfellow Licensing Manager Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

L. P. Hill Licensing Supervisor Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

L. L. Crumpton Administrative Assistant, Sr.

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

William D. Oldfield Principal Licensing Engineer Joseph M. Farley Nuclear Plant Electronic Mail Distribution

Todd L. Youngblood Vice President Fleet Oversight Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

(cc w/encl continued next page) (cc w/encl continued)

John G. Horn Site Support Manager Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution

James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution

Mr. Mark Culver Chairman Houston County Commission P. O. Box 6406 Dothan, AL 36302

James L. McNees, CHP Director Office of Radiation Control Alabama Dept. of Public Health P. O. Box 303017 Montgomery, AL 36130-3017

State Health Officer Alabama Dept. of Public Health P.O. Box 303017 Montgomery, AL 36130-3017

Chuck Mueller Manager Policy and Radiation Program Georgia Department of Natural Resources Electronic Mail Distribution Letter to Tom from Richard P. Croteau dated March 4, 2013.

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 AND UNIT 2 (NRC INSPECTION REPORT 05000348/2012001 AND 364/2012001)

Distribution w/encl:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMFarley Resource ROP Assessment Institute of Nuclear Power Operations (INPO)

Farley Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 1 of 2 03/04/2013 07:42:50 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title

MODS

- PLANT MODIFICATIONS INSPECTION 1, 2 02/25/2013 03/01/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 03/11/2013 03/15/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications

RP

- RAD HAZARDS ANALYSIS AND TRANSPORTATION 1, 2 04/15/2013 04/19/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/15/2013 04/19/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 04/15/2013 04/19/2013 IP 71151 Performance Indicator Verification

ISI

- UNIT 2 INSERVICE INSPECTION

04/22/2013 04/26/2013 IP 7111108P Inservice Inspection Activities - PWR

OL EXAM

- INITIAL EXAM PREP

05/20/2013 05/24/2013 V23407 FARLEY/JUNE 2013 INITIAL EXAM AT POWER FACILITIES

OL EXAM

- INITIAL EXAM - WEEK 1

06/17/2013 06/21/2013 V23407 FARLEY/JUNE 2013 INITIAL EXAM AT POWER FACILITIES

OL EXAM

- INITIAL EXAM - WEEK 2

06/24/2013 06/28/2013 V23407 FARLEY/JUNE 2013 INITIAL EXAM AT POWER FACILITIES

ISI

- UNIT 1 INSERVICE INSPECTION

10/07/2013 10/11/2013 IP 7111108P Inservice Inspection Activities - PWR

SGISI

- UNIT 1 SG INSERVICE INSPECTION

10/14/2013 10/18/2013 IP 7111108P Inservice Inspection Activities - PWR

PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 1, 2 11/04/2013 11/09/2013 IP 71152B Problem Identification and Resolution 1, 2 11/18/2013 11/22/2013 IP 71152B Problem Identification and Resolution

HS

- TRIENNIAL HEAT SINK PERFORMANCE 1, 2 01/13/2014 01/17/2014 IP 7111107T Heat Sink Performance

EP

- EP EXERCISE 1, 2 04/07/2014 04/11/2014 IP 7111401 Exercise Evaluation 1, 2 04/07/2014 04/11/2014 IP 71151 Performance Indicator Verification

CDBI

- COMPONENT DESIGN BASES INSPECTION 1, 2 04/14/2014 04/18/2014 IP 7111121 Component Design Bases Inspection 1, 2 05/05/2014 05/09/2014 IP 7111121 Component Design Bases Inspection 1, 2 05/19/2014 05/23/2014 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Farley Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 2 of 2 03/04/2013 07:42:50 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title

CDBI

- COMPONENT DESIGN BASES INSPECTION 1, 2 06/02/2014 06/06/2014 IP 7111121 Component Design Bases Inspection Comments:

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure