IR 05000348/1998014
| ML20199C950 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 01/08/1999 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20199C940 | List: |
| References | |
| 50-348-98-14, 50-364-98-14, NUDOCS 9901190222 | |
| Download: ML20199C950 (2) | |
Text
.
.
.
-
..
-.. -
!
o
.o i U. S. NUCLEAR REGULATORY COMMISSION
^
REGION 11 Docket Nos:
50-348,50-364 License Nos:
50-348/98-14,50-364/98-14 Licensee:
Southern Nuclear Operating Company, Inc.
Facility:
Farley Nuclear Plant Location:
7388 N. State Highway 95 Columbia AL 36319 Dates:
December 7-10,1998 inspector:
L. Hayes, Safeguards Specialist Approved by:
George A. Belisle, Chief Specialinspection Branch Division of Reactor Safety 9901190222 990108 PDR ADOCK 05000348 G
PDR SAFEGUARDS INFORMA;TICh'
^
___
.
!
,
contains sensfttve NM
[
hformaten. %Sen separa*od from
!
Cn::::.rcl::ti:cocumen:Is cacentroted
-
-
.
-
.
-
. -
.
,
.... EXECUTIVE SUMMARY FARLEY NUCLEAR PLANT NRC inspection Report Nos. 50-348/98-14,50-364/98-14 The licensee was effectively discontinuing access to those employees who were
,
.
favorably terminated and was meeting the commitments in the Physical Security Plan
'
for searches of materials. (tiection S1.4).
The licensee was testing and maintair.ing security related equipment as required by
.
the Physical Security Plan and procedures. Security related equipment was being promptly and appropriately repaired. (Section S2.1).
The licensee appropriately replaced and raised the locks on the Vehicle Barrier
.
System active barriers to minimize potential tampering and the capability to use hand tools to defeat the locks. (Section 2.5).
Compensatory measures observed and reviewed through documentation were within
.
the requirements of the licensee's Physical Security Plan. (Section S2.6).
A target set analysis and subsequent physical protection strategy currently ernployed
.
by the licensee may not be valid in order to fulfill Physical Security Plan requirements.
,
(Section S4.2).
i The licensee's security training program met the provisions of the Training and
.
Qualification Plan. (Section SS.1).
l
!
,
(
-
SAFEGUARCS INFORMAT!CN
_m..w e p docurnent * CDCO...
~"
'"