ML20151N881

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Repts 50-348/88-09 & 50-364/88-09 on 880321-24 (Ref 10CFR2.790 & 73.21).Violation Noted.Major Areas Inspected:Security Organization,Records,Repts,Testing, Maint,Locks,Keys,Combinations & Physical Barriers
ML20151N881
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/13/1988
From: Mcguire D, Thompson D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20151N832 List:
References
50-348-88-09, 50-348-88-9, 50-364-88-09, 50-364-88-9, NUDOCS 8804260034
Download: ML20151N881 (1)


See also: IR 05000348/1988009

Text

"'

"

, . SAFEGUARDS INFORMATION )

- UNITED STATES

E gp H00q'q ^

NUCLEAR REGULATORY COMMISSION

o REGION 18

'[

g j 101 MARIETTA STREET,N.W.

  • 2 ATLANTA, G EoRot A 30323

'+9 . . . . . ,o

APR 191988

Report Nos.- 50-348/88-09 and 50-364/88-09

Licensee: Alabama Power Company

600 North 18th Street

Birmingham, AL 35291-0400

Docket Nos.: 50-348 and 50-364 License Nos.: NPF-2 and NPF-8

Facility Name: Farley 1 and 2

Inspection Conducted: March 21-24, 1988

Inspector: . F . MW L/f/3 f8f

D.7hofn ' son , hy$ical Security Inspector Date Signed

Approved by: - ,_ __

j /3

D. R. McGuir'e, Chief, Physical Security Section Uate / Signed

Nuclear Materials Safety and Safeguards Branch

Division of Radiation Safety and Safeguards

SUMMARY

Scope: This routine, unannounced physical security inspection examined:

Security Organization; Records and Reports; Testing and Maintenance; Locks,

Keys and Combinations; Physical Barriers - Protected Area; Physical Barriers

- Vital Areas; Access Control - Personnel; Access Controls - Vehicles;

Detection Aids - Protected Area; Alarm Stations; and Physical Protection

Safeguards Information. In addition, a review and evaluation of pertinent

security documentation was conducted in an attempt to substantiate several

allegations relating to improprieties in security force operations.

Results: There was one violation of regulatory requirement and one licensee

identified violation noted during the inspection.

- Failure to secure safeguards information when unattended.

- Failure to ensure an authorized individual had a badge before granting

access to a protected area. (Licensee Identified Violation)

, S.FEc 3 ONTAINS

UPCH

PACS g3 SEPAy,IICH THISO M

SAFEGUARDS INFORMAT!ON

8804260034 880419

PDR ADOCK 05000348

O DCD