HNP-03-094, July 2003 Monthly Operating Report for Shearon Harris Nuclear Power Plant
| ML032330422 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 08/12/2003 |
| From: | Caves J Progress Energy Carolinas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| HNP-03-094 | |
| Download: ML032330422 (4) | |
Text
a~o Progress Energy AUG 203 Serial: BNP-03-094 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 W
SiMARPN A
NUCLEAR POWERflAY-,
DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLY OPERATING REPORT
Dear Sir or Madam:
In accordance with Technical Specification 6.9.1.5 for Progress Energy Carolinas, Inc's (alternately known as Carolina Power and Light Co.) Harris Nuclear Plant, the report of operating statistics and shutdown experience for the month of July 2003 is provided.
1,.
-,z
'Sincerely, f
^' t$
J
/ ~A
-r~i>r,-.
.~.........
-S 3 l7O
/,Th>C Rsstsz+
,Ce
>^
John R. Caves Supervisor, Licensing and Regulatory Programs Harris Nuclear Plant SGR Enclosure D
c:
Mr. R. A. Musser (NRC Senior Resident Inspector, HNP)
Mr. L. A. Reyes (NRC Regional Administrator, Region II)
Mr. C. P. Patel (NRC Project Manager, HNP),
3 reio-sss
- Caois i
t; t. i
.a.
- at
-f ll2c!
larris Nuclear Plaht.
a i '
a.
In ' ;
r P.O. Bx 165 New Hill, NC 27562
If United States Nuclear Regulatory Commission Page 2 bc:
Mr. Tom C. Bell Mr. Stephen Carr Mr. W. F. Conway Mr. G. W. Davis Mr. R. J. Duncan II Mr. K. N. Harris Mr. C. S. Hinnant Mr. H. L James Mr. R. D. Martin Mr. T. C. Morton
M WS.Orser Mr. J. Scarola Mr. J. M. Taylor Mr. B. C. Waldrep Mr. W. G. Wendland (American Nuclear Insurers) licensing Files (2)
Nuclear Records
Enclosure to Serial HNP-03-094 Page 1 of 2 OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 050-400 Shearon Harris Nuclear Power Plant August 7, 2003 Charles L. George (919) 362-2937 REPORTING PERIOD July 2003 (Month/Year)
- 1. Design Electrical Rating:
(MWe-Net)
- 2. Maximum Dependable Capacity:
(MWe-Net)
- 3. Number of Hours the Reactor Was Critical:
- 4.
Number of Hours the Generator Was On Line:
- 5. Unit Reserve Shutdown Hours:
MONTH 941.7 900.0 744.0 744.0 0.0 YEAR TO DATE N/A N/A 4,509.6 4,447.5 0.0 CUMULATIVE N/A N/A 122,488.7 121,396.4 0.0
- 6. Net Electrical Energy (MWH):
675,487.0 4,029,627.0 102,592,140.0
V-e 4
Enclosure to Serial HNP-03-094 Page 2 of 2 APPENDIX B UNIT SHUTDOWNS s Nuclear Power Plant DOCKET NO.
050-400 UNIT NAME Shearon Han DATE August 7, 20 COMPLETED BY Charles L. G TELEPHONE (919) 362-29 REPORTINI 13 orge
~7 PERIOD July 2003 (Month/Year)
SUMMARY
- There were no significant report for the month of July 2003. The pl full power for the entire reporting period.
(1) Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License EA F - Administrative G - Operational Error (Explain)
H - Other (Explain)
,vents to nt operated at (2) Method:
- Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) amination