b C7 Progress Energy JUN 0 9 2005 SERIAL: HNP-05-072 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50400/LICENSE NO. NPF-63 MONTHLY OPERATING REPORT Ladies and Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Plant, Carolina Power &

Light Company, doing business as Progress Energy Carolinas, Inc., is providing the enclosed report of operating statistics and shutdown experience for the month of May 2005.

Sincerely, David H. Corlett Supervisor, Licensing/Regulatory Programs Harris Nuclear Plant DHC/mgw Enclosure C:

Mr. R. A. Musser (NRC Senior Resident Inspector, HNP)

Mr. C. P. Patel (NRC Project Manager, HNP)

Dr. W. D. Travers (NRC Regional Administrator, Region II)

I Progress Energy Carolinas. Inc.

Harris Nuclear Plant P. 0. Box 165 Nev Hill, NC, NC 27562

Enclosure to Serial HNP-05-072 Page I of 2 OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 050-400 Shearon Harris Nuclear Power Plant June 2, 2005 Michael S. Matheny (919) 362-2335 REPORTING PERIOD May 2005 (Month/Year)

1. Design Electrical Rating:

(MWe-Net)

2.

Maximum Dependable Capacity:

(MWe-Net)

3. Number of Hours the Reactor Was Critical:
4.

Number of Hours the Generator Was On Line:

5.

Unit Reserve Shutdown Hours:

MONTH 941.7 900.0 700.6 694.0 0.0 YEAR TO DATE N/A N/A 3,579.6 3,573.0 0.0 CUMULATIVE N/A N/A 137,470.4 136,293.5 0.0

6.

Net Electrical Energy (MWH):

577,180.0 3,253,742.0 116,061,607.0

Enclosure to Serial HNP-05-072 Page 2 of 2 APPENDIX B UNIT SHUTDOWNS DOCKET NO.

050-400 UNIT NAME Shearon Harris Nuclear Power Plant DATE June 2, 2005 COMPLETED BY Michael S. Matheny TELEPHONE (919) 362-2335 REPORTING PERIOD May 2005 (MonthfYear)

TYPE METHOD OF DATE F: FORCED DURATION SHUlTlING CAUSE/CORRECTIVE ACTIONS NO.

(yymmdd)

S: SCHEDULED (HOURS)

REASON (1)

DOWN (2)

COMMENTS 05-01 050501 F

50.0 A

2 The manual reactor trip was due to the loss of the "B" feedwater train caused by the "B" condensate pump failed motor shaft. The motor was replaced with a spare motor. Required repairs were made to the condensate pump. The unit was returned to service on 05/03/05 and operated at approx. 50% power while repairs were being completed. The unit returned to 100% power on I

05/08/05.

SUMMARY

There was one forced manual scram during the month of May 2005. Details of this event will be reported in LER 2005-002-00 (due 06/30/05).

(1) Reason:

(2) Method:

A - Equipment Failure (Explain)

I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)