HNP-06-073, Day Special Report Steam Generator Tube Plugging During RFO-13
| ML061360488 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 05/05/2006 |
| From: | Corlett D Progress Energy Carolinas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| HNP-06-073 | |
| Download: ML061360488 (3) | |
Text
Progress Energy MAY 0 5 2006 Serial: HNP-06-073 U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 15-DAY SPECIAL REPORT STEAM GENERATOR TUBE PLUGGING DURING RFO-13 Ladies and Gentlemen:
In accordance with Technical Specification 4.4.5.5.a of the Harris Nuclear Plant (HNP), Carolina Power and Light Company doing business as Progress Energy Carolinas, Inc., provides the attached 15-day special report, which reports the number of tubes plugged in each steam generator (SG) following the completion of a SG tube inservice inspection conducted during a refueling outage (RFO-13) in April 2006.
The complete results of the SG tube inservice inspection conducted during RFO-1 3 will be submitted to the NRC within 12 months of completion as required by Technical Specification 4.4.5.5.b. provides the 15-day special report identifying the number of tubes plugged in each steam generator during RFO-1 3.
Please refer any question regarding this submittal to Mr. Dave Corlett at (919) 362-3137.
Sincerely, Supervisor - Licensing/Regulatory Programs Harris Nuclear Plant DHC/jpy Progress Energy Carolinas, Inc.
Harris Nuclear Plant
£'
cL47 P.O. Box 165 fe (I
-7 New Hill, NC 27562
HNP-06-073 Page 2 Attachments:
- 1. 15-Day Special Report Number of Tubes Plugged in Each Steam Generator During RFO-13 c:
Mr. R. A. Musser, NRC Senior Resident Inspector Mr. C. P. Patel, NRC Project Manager Dr. W. D. Travers, NRC Regional Administrator to SERIAL: HNP-06-073 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 15-DAY SPECIAL REPORT NUMBER OF TUBES PLUGGED IN EACH STEAM GENERATOR DURING RFO-13 Technical Specification 4.4.5.5.a of the Harris Nuclear Plant (HNP) requires that within 15 days following the completion of each inservice inspection of steam generator (SG) tubes, the number of tubes plugged in each steam generator shall be reported to the Commission in a Special Report pursuant to Specification 6.9.2 (10 CFR 50.4).
Number of Tubes Plugged Steam Generator A
B C
Current (RFO-13) 2 0
0 Cummulative (through April 2006) 3 1
3 Al-1 of 1