HNP-03-020, January 2003 Monthly Operating Report for Shearon Harris

From kanterella
Jump to navigation Jump to search
January 2003 Monthly Operating Report for Shearon Harris
ML030520122
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/05/2003
From: Caves J
Carolina Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
HNP-03-020
Download: ML030520122 (4)


Text

CP&L A Progress Energy Company Serial: HNP-03-020 FEB 0 5 2003, United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLY OPERATING REPORT

Dear Sir or Madam:

In accordance with Technical Specification 6.9.1.5 for Progress Energy Carolinas, Inc's (alternately known as Carolina Power and Light Co.) Harris Nuclear Plant, the report of operating statistics and shutdown experience for the month of January, 2003 is provided.

Sincerely, John R. Caves Supervisor, Licensing and Regulatory Programs Harris Nuclear Plant SGR/sgr Enclosure c:

Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)

Mr. L. A. Reyes (NRC Regional Administrator, Region II)

Mr. C. P. Patel (NRC Project Manager, HNP)

Harris Nuclear Plant 5413 Shearon Harris Road New Hill, NC 27562

United States Nuclear Regulatory Commission Page 2 bc:

Mr. Stephen Carr Mr. W. F. Conway Mr. G. W. Davis Mr. R. J. Duncan HI Mr. K. N. Harris Ms. T. A. Hardy (PE&RAS File)

Mr. C. S. Hinnant Mr. H. L. James Mr. R. D. Martin Mr. T. C. Morton Mr. W. S. Orser Mr. J.Scar-.-

Mr. J. M. Taylor Mr. B. C. Waldrep Mr. W. G. Wendland (American Nuclear Insurers)

Licensing Files (2)

Nuclear Records

Enclosure to Serial HNP-03-020 Page 1 of 2 OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 050-400 Shearon Harris Nuclear Power Plant February 4, 2003 Charles L. George (919) 362-2937 REPORTING PERIOD

1. Design Electrical Rating:

(MWe-Net)

2.

Maximum Dependable Capacity:

(MWe-Net)

3.

Number of Hours the Reactor Was Critical:

4.

Number of Hours the Generator Was On Line:

5.

Unit Reserve Shutdown Hours:

January, 2003 (Month/Year)

MONTH 941.7 900 744.0 744.0 0

697,798_

YEAR TO DATE N/A N/A 744.0 744.0 0

CUMULATIVE N/A N/A 118,723.1 117,692.9 0

6.

Net Electrical Energy (MWHI:

697,798 99,260,311

I Enclosure to Serial HNP-03-020 Page 2 of 2 APPENDIX B UNIT SHUTDOWNS DOCKET NO.

050-400 UNIT NAME Shearon Harris Nuclear Power Plant DATE February 4, 2003 COMPLETED BY Charles L. George TELEPHONE (919) 362-2937 REPORTING PERIOD January, 2003 (Month/Year)

IYPE F: FORCED S: SCHEDULED INIA DURATION (T-TCT TPSR' AI/A PIFARNO" (1*

IN/A METHOD OF SHUTTING rAWM fI N/A CAUSE/CORRECTIVE ACTIONS (Y,,,

dd (H....O,.

.RS

.)'

REA-*

N

.I N.,*-

v

  • t-.

,,,,.+IVJLII

  • TI A
  • ,I A

WT!

iil I N/A

SUMMARY

There were no significant events to report for the month of January, 2003. The 'plant operated at 100% for the entire reporting period.

(1) Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C -Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method:

I - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

NO.

II I

p II-DATE (vvmmdd)

INI/i IN/

1 III N/A

ý N/A I

'b