jProgress Energy AUG 1 0 2006 Serial: HNP-06-081 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 Shearon Harris Nuclear Power Plant, Unit No. 1 Docket No. 50-400/License No. NPF-63 90-Day Inservice Inspection (ISI) Summary Report Ladies and Gentlemen:

Inaccordance with the Code of Federal Regulations, Title 10, Part 50.55a, Carolina Power and Light Company (CP&L) doing business as Progress Energy Carolinas, Inc., submits the attached Inservice Inspection (ISI) Summary Report for the Harris Nuclear Plant (HNP). This report has been prepared in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, 1989 Edition,Section XI, Article IWA-6220(c). This report includes the inspections performed at HNP during Cycle 13 operations and Refueling Outage No.

13 (RFO-13) of the second 10-year ISI interval.

This document contains no new regulatory commitments.

Please refer any question regarding this submittal to me at (919) 362-3137.

Sincerely, D. H. Corlett Supervisor - Licensing/Regulatory Programs Harris Nuclear Plant DHC/jpy Attachment Progress Energy Carolinas, Inc.

Harris Nuclear Plant P. 0. Box 165 New Hill, NC 27562

HNP-06-081 Page 2 C:

Mr. R. A. Musser, NRC Senior Resident Inspector Mr. C. P. Patel, NRC Project Manager Dr. W. D. Travers, NRC Regional Administrator Mr. J. M. Givens, Jr., NC Department of Labor, Boiler Safety Bureau

Attachment for Serial: HNP-06-081 CAROLINA POWER AND LIGHT COMPANY dba PROGRESS ENERGY CAROLINAS, Inc.

SHEARON HARRIS NUCLEAR POWER PLANT Unit One Inservice Inspection (ISI)

Summary Report For RFO-13 Carolina Power and Light PO Box 1551 Raleigh, NC 27602-1551 Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 Date of Commercial Service May 2, 1987 Document Completion Date August 8, 2006

Attachment for Serial: HNP-06-081 INDEX S UMMA RY .................................................................................................... Section 1 NIS-1 FORM, OWNER'S REPORT FOR INSERVICE INSPECTIONS ......... Section 2 WELD EXAMINATION RESULTS ................................................................. Section 3 COMPONENT SUPPORTS .......................................................................... Section 4 NIS-2 FORMS, REPORT OF REPAIRS AND REPLACEMENTS ................. Section 5

Attachment for Serial: HNP-06-081 SECTION 1 (7 Pages)

SUMMARY

Attachment for Serial: HNP-06-081

SUMMARY

The Shearon Harris Nuclear Power Plant, Unit 1, Ten-Year Inservice Inspection (ISI)

Plan was developed to comply With 1 0CFR50.55a(g), which implements, by reference, the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 1989 Edition with no Addenda.

The following summary report is being submitted pursuant to the reporting requirements of ASME Section XI, Subarticle IWA-6220(c).

This summary report contains the results of the Inservice Inspection (ISI) examinations performed on selected Class I and 2 pressure retaining components and their supports at Harris Nuclear Plant (HNP) from November 17, 2004 to May 16, 2006. The Refueling Outage No. 13 (RFO-1 3) examinations were performed during the third period in the second inspection interval. The typical designation is 2-3-13, (second interval, third period, thirteenth refueling outage). RFO-13 is the second outage of the third inspection period and the final outage of the second interval.

The components selected for examination were from the HNP ISI Program Plan and consisted of piping welds, vessel welds, component welds, component supports, and integral attachments.

ASME Section X1 examinations were completed as scheduled in the HNP ISI Program Plan. The minimum and maximum percentage requirements for examinations completed meet the requirements of ASME Section XI, Tables IWB-2412-1 and IWC-2412-1.

NDE of Welds Summary Nondestructive examinations were performed using Eddy Current (ET), Magnetic Particle (MT), Liquid Penetrant (PT), Ultrasonic (UT), and Visual (V-T) techniques.

Performance Demonstration Initiative (PDI) ultrasonic techniques were utilized where required. The results of the examinations were satisfactory with no rejectable indications noted. Indications identified during examinations were evaluated and documented as applicable on each weld examination data report. Code Case N-460 was invoked where the examination achieved greater than 90% coverage, but less than 100% code coverage. Those welds achieving greater than 90% coverage are considered complete. Weld examinations are summarized in Section 3 of this report.

Attachment for Serial: HNP-06-081 NDE of Welds Summary (continued)

Automated UT, ET, and VT examinations of the reactor vessel welds were performed in accordance with ASME Section XI, 1995 Edition, 1996 Addenda, Appendix VIII as modified by 10 CFR 50.55a. The results of the examinations performed were satisfactory with no rejectable indications noted. Indications identified during examinations were evaluated and documented as applicable on each weld examination data report. In conjunction with the reactor examination, the reactor vessel nozzle-to-pipe dissimilar metal welds were examined using both UT and ET techniques. The dissimilar metal welds were examined with demonstrated techniques, and the results of the examinations were satisfactory with no indications detected.

During RFO-1 3, the reactor vessel head penetrations were examined to satisfy the requirements in Section IV.C.(5)(b) of the First Revised NRC Order EA-03-009 dated February 20, 2004 and to provide a baseline for future examinations. The examinations were conducted in accordance with written procedures and techniques that were demonstrated through the Electric Power Research Institute (EPRI)

Technical Report (TR) 1007831, MaterialsReliabilityProgram:Demonstrationsof Vendor Equipment and Proceduresfor the Inspection of ControlRod Drive Mechanism Head Penetrations(MRP-89) dated September 2003, and Westinghouse internal programs. The volume of the sixty-five penetration nozzles were examined using UT and ET techniques, the interference zone was inspected with 00 UT techniques to assess whether flaws were present. In addition, the ID surface was examined with a supplemental ET technique. The reactor vessel head vent line and the associated J-groove weld were examined using ET techniques. No evidence of primary water stress corrosion cracking (PWSCC) was identified by these examinations. The results of these examinations have been submitted with HNP's 60-day report (HNP-06-080) dated July 14, 2006.

Bare metal visual (BMV) examinations of all dissimilar metal piping butt welds were completed as identified in the EPRI TR 1010087, MaterialsReliability Program:

PrimarySystem Piping Butt Weld Inspection and Evaluation Guidelines (MRP-139) dated August 2005. The locations of the BMV examinations included the six Inconel 82/182 piping welds associated with the pressurizer and the six Inconel 82/182 reactor vessel nozzle-to-pipe welds. These examinations revealed no evidence of boric acid leakage.

BMV examinations of the bottom mounted instrumentation (BMI) of the reactor vessel lower head were performed in RFO-13. Similar examinations were performed during previous refueling outages in accordance with NRC Bulletin 2003-02. Again, no relevant conditions indicative of boric acid leakage were found.

Attachment for Serial: HNP-06-081 NDE of Welds Summary (continued)

Personnel performing the ISI examinations used isometric drawings in conjunction with tagged valves, component supports, points of connection, vessels, wall or floor penetrations, and floor elevations to locate and identify components subject to examination. Permanent component identification reference points were established and marked on the component in accordance with ASME Section XI, Article 111-4000 during Preservice Inspection (PSI). The NDE examination reports, personnel certifications, examination equipment, NDE procedures, calibration standards and the ISI isometrics are listed in the RFO-13 Outage Examination Results Report.

This report is on file and available at the plant site for review upon request.

Component Support and Snubber Examination Summary ASME Section XI component support examinations were completed as scheduled in the HNP ISI Program Plan for outage 2-3-13 (RFO-13). ASME Section X1 component support exams are complete as scheduled for the current ISI interval.

Examination results were satisfactory except for one pipe support. This support was found with an excessive gap between the pipe clamp and the integrally-welded attached pipe lug. The design called for a 1/16" gap, but the as-found gap was approximately 1/8" to 1/4". Engineering evaluated this condition and determined that the support would still perform its required function. This condition was documented in the corrective action program. The condition was not a result of in-service wear, and the gap was corrected by installing a shim plate.

In RFO-13, the Technical Specifications (TS) Augmented Snubber Examination and Testing program included visual examination of 282 snubbers. Four visual examination failures were observed on the Steam Generator (SG) Blowdown system.

Specifically, two snubbers located on the "C" SG normal blowdown path were observed with inadequate settings for their design thermal movement. Engineering evaluated the "as-found" condition and determined that the supports would still perform their required functions because the potential reduction in movement would be limited to approximately 1/32" and would not result in adverse pipe stresses. This condition was corrected by resetting these snubbers to ensure adequate design thermal movement. No other snubbers were found with this condition on the affected pipe. The other two visual examination failures involved two hydraulic SG snubbers, which were observed with low fluid level. The source of the fluid loss was corrected, and the fluid was restored to normal level. In addition to the observations above, two snubbers were found with arc strikes. These snubbers were removed, functionally tested, and found to meet their acceptance criteria. The visual examinations were performed in accordance with the 10-year snubber examination interval described in ASME Operation and Maintenance (OM) Code Case OMN-13, as implemented by applicable plant procedures.

Attachment for Serial: HNP-06-081 Component Support and Snubber Examination Summary (continued)

RFO-1 3 snubber testing activities included functional testing of 37 mechanical snubbers and five large bore hydraulic snubbers in the representative sample plans, and hand-stroke testing of 23 mechanical snubbers in the harsh environment test group. Testing results for the mechanical snubbers in the representative 37 sample plan resulted in two functional test failures. All five hydraulic snubber functional test results were satisfactory. All 23 harsh environment snubbers were observed to stroke freely, so the hand-stroke test results were satisfactory.

The following details are provided for the results of the two functional test failures.

One mechanical snubber failed to properly activate due to a manufacturing defect.

However, the snubber exhibited a smooth stroke with drag values within the acceptance range. The snubber was inspected and found to have inadequate crimping between a guide rod and pipe attachment end. Upon further investigation, the cause was attributed to a manufacturing defect originating from inadequate crimping of the guide rod. The failed snubber was replaced satisfactorily with a pre-tested snubber. Per the applicable code, ASME OM ISTD 1995 Edition with 1996 Addenda, scope expansion on a manufacturing failure is not required. Although not required by the code, another snubber of similar size and application was added to the 37 sample plan and tested. The functional test results for this additional snubber were satisfactory.

The other function test failure involved a snubber on the main steam (MS) piping exiting the "C" steam generator. The snubber passed the activation functional test, however, it seized during its drag test. The snubber was sent to the manufacturer for investigation. The manufacturer found that the snubber had localized fretting damage along an internal worm gear where the snubber is in its normal hot position.

The fretting was evaluated and attributed to low amplitude vibration in a horizontal section of pipe, which may also affect the other two vertical MS pipe systems exiting the other steam generators. In accordance with ASME OM ISTD 1995 Edition with 1996 Addenda, a failure mode group (FMG) was established that encompassed six MS piping snubbers, including the snubber that had a functional test failure. The other five snubbers in the FMG were removed and tested. The additional test results were satisfactory and no additional failures were found. Per ASME OM ISTD 1995 Edition with 1996 Addenda, no scope expansion was required beyond the FMG. The condition was corrected by replacing the failed snubber with a pre-tested snubber.

Component Support Examinations are summarized in Section 4 of this Report.

Attachment for Serial: HNP-06-081 Steam Generator ISI Summary Fifty percent (50%) of the open tubing in all three steam generators (SG) was inspected using ET technology (bobbin exam) during RFO 13. Rotating coil examinations were conducted on approximately 20% of the tubing in the outer tube bundle and blowdown lane regions in all three SGs on the top of the secondary tubesheet (hot and cold leg sides). Twenty percent (20%) of the Row I U-bends were also inspected with rotating coil examinations.

No degraded tubes were identified from the ET data analysis. The examination results for the SGs are classified as C-1 per the Harris Technical Specifications and EPRI NDE Examination Guidelines. Category C-1 has the following criteria: "Less than 5% of the total tubes inspected are degraded tubes and none of the inspected tubes are defective".

System Pressure Tests ASME Class 1, 2 and 3 Pressure Tests were performed during RFO-1 3 in accordance with ASME Section XI, Articles IWA-5000, IWB-5000 and IWC-5000.

Code Case N-533 was invoked to allow insulation removal at bolted connections while the system was not at operating pressure. Relief Request 2RG-009 was invoked to allow evaluation of leakage at bolted connections in lieu of removing one bolt. Relief Request 2RG-010 was invoked to schedule and examine piping welds with a Risk-Informed Program.

Where leakage was identified, it was either evaluated in accordance with Relief Request 2RG-009, or measures were taken to correct the condition. The Pressure Test records and supporting documentation are on file and available at the plant site for review upon request.

Containment Inspections No IWE examinations of the ASME Class MC Components were required or scheduled during RFO-13. However, as a prudent measure, examinations were performed between the moisture barrier and approximately 12" up from the moisture barrier on the liner. No recordable conditions were observed during these examinations. In addition, as follow-up corrective action from the previous outage, the 'A' Containment Spray valve chambers were opened and examined. A VT-I examination was performed on all bolting and nuts of the valve chamber manway.

No recordable conditions were observed during this examination.

No IWL examinations were required or scheduled in RFO-13. However, for information, an ongoing examination of the exterior containment concrete is in progress, and the results of this examination will be reported in a future ISI Summary Report.

Attachment for Serial: HNP-06-081 Repair and Replacement Summary The repair and replacement summary and the attached ASME Section Xl, NIS-2 forms detail the component, system, work order (WO) number, component description and the description of the work order activity. Complete repair and replacement documentation for the specific component is maintained at the plant site as a permanent record and is retrievable through the work request (WR) or WO document package, which is identified on the NIS-2 form. Section 5 of this report provides the repair and replacement documentation.

Attachment for Serial: HNP-06-081 SECTION 2 (3 Pages)

NIS-1 FORM OWNER'S REPORT FOR INSERVICE INSPECTIONS

Attachment for Serial: HNP-06-081 FORM NIS-1 OWNER'S REPORT FOR INSE*VICE INSPECTIONS As required by the Provisions of the ASME Code Rules

1. Owner Proaress Enerav Carolinas. Inc. P.O. Box 1551. Raleiqh, N.C. 27602 (Name and Address of Owner)
2. Plant Shearon Harris Nuclear Plant, 5413 Shearon Harris Rd. . New Hill. N.C. 27562 (Name and Address of Plant)
3. Plant Unit One (1) 4. Owner Certificate of Authorization (if required) N/A
5. Commercial Service Date 5/2187 6. National Board Number for Unit 65
7. Systems/Components Inspected (See Systems listed below and Section 3, 4, 5, and 6)

Manufacturer State or Component or Manufacturer or Installer Province National Appurtenance or Installer Serial No. No. Board No.

Reactor Vessel CB & I T40 NC212410 4 Auxiliary Feedwater CP&L AF N/A 49 Blowdown CP&L BD N/A 44 Chemical & Volume Control CP&L CS N/A 48 Containment Spray CP&L CT N/A 63 Feedwater CP&L FW N/A 54 Excess Letdown Heat Exchanger Atlas NA NC203942 1999 Main Steam CP&L MS N/A 59 Reactor Coolant CP&L RC N/A 55 Residual Heat Removal CP&L RHR NIA 38 Steam Generator - A Westinghouse 12243 NC301552 63 Steam Generator - B Westinghouse 12244 NC301553 64 Steam Generator - C Westinghouse 12245 NC301554 65 Pressurizer Westinghouse 1641 NC212409 W1 1306 Safety Injection CP&L SI N/A 46 Service Water CP&L SW N/A 64 2168-11B7 NC203028 740 RHR Heat Exchanger - 1A-SA Joseph Oat Corp.

Attachment for Serial: HNP-06-081 FORM NIS-1

8. Examination Dates 11117/2004 to 5/16/2006
9. Inspection Period Identification: Third Inspection Period
10. Inspection Interval Identification: Second Inspection Interval
11. Applicable Edition of Section XI: 1989 Edition Addenda: None
12. Date/Revision of Inspection Plan: January 26, 1998/Revision 1
13. Abstract of Examinations and Tests. Include a list of examinations and a statement concerning status of work required for current interval. (See Sections 1, 3 &4)
14. Abstract of Results of Examinations and Tests. (See Sections 1, 3 & 4)
15. Abstract of Corrective Measures. (See Sections 3 &4)

We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization No. (if applicable) N/A Expiration Date NIA Date !~i/2/~OO 7L Signed Progress Energy Carolinas, Inc. By .. f2 ŽZa.,*'-4 Certificate of Inservice Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSBCT of Hartford, CT.

have inspected the components described in this Owner's Report during the period 11117/2004 to 5/16/2006 , and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owner's Report in accordance with the Inspection Plan as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

a Commissions NC1507 Inspqpfr'VSignature National Board, State, Province, and Endorsements Date o0 4

Attachment for Serial: HNP-06-081 SECTION 3 (14 Pages)

WEL13 EXAMINATION RESULTS

Attachment for Serial: HNP-06-081 Completion Code Compliance Summary - 2nd Interval ISI - Code Edition - 1989 TOTAL TOTAL CATEGORY REQUIRED COMPLETE COMMENTS B-A 18 18 B-B 5 5 B-D 30 30 B-E 4 4 4 components containing 115 partial penetration welds B-F 12 12 Risk informed ISI invoked for 3rd Period. 6 welds previously classified as B-F are now R-A B-G-1 256 256 B-G-2 706 706 54 components containing 706 individual bolting items B-H 13 13 B-J 85 85 Risk informed ISI invoked for 3rd Period.

B-K-1 2 2 B-L-1 1 1 B-M-2 7 7 Examination required only when disassembled B-N-1 3 3 Required each Period B-N-2 4 4 B-N-3 1 1 B-O 3 3 C-A 9 9 C-B 11 11 C-C 32 32 C-F-1 88 126 Risk informed ISI invoked for 3rd Period.

C-F-2 25 84 Risk informed ISI invoked for 3rd Period.

R-A 29 32 Risk informed ISI invoked for 3rd Period.

Page 3 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13

1. Owner: Carolina Power and Light dba Progress Energy 4. Owner Certificate of Authorization (If Req.): N/A
2. Plant: Shearon Harris Nuclear Plant 5. Commercial Service Date: May 2, 1987
3. Plant Unit: 1 6. National Board Number for Unit: 65 Summary No. Comp. ID Comp. Desc. Item Procedure Method/ReDort/Results System Dwg/ISO Exam Date Class 1 Category B-E H-02972 II-PZR-01HTRPEN(1-78) VHTRPEN/ B4.20 NDEP-0612 VT VT-06-121 Sat RC-2050 1-ISI-PZR-1 5/11/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-03774 II-RV-001INSTNOZ(1-13) VICINOZ/ B4.13 NDEP-0612 VT VT-06-123 Sat RC-1005 1-ISI-RV-1 5/11/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

Class 2 Category C-F-2 H-02693 II-FW-001FW°FW-704 Pipe to Cap C5.61 NDEP-0301 MT MT-06-019 Sat FW-3050 1-ISI-FW-1 4/17/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

Class 1 Category A600 H-03794 II-RV-001RV-BMI VICINOZ/ A600 NDEP-0612 VT VT-06-020 Sat RC-1005 1-1SI-RV-1 4/10/2006 Comments: Examination performed to requirements of MRP-139. No indications identified.

Class 1 Category B-B H-02980 II-PZR-01LSW.07 VLSW 62.12 B NDEP-0450 UT UT-06-152 Sat RC-2050 1-ISI-PZR-1 4/20/2006 NDEP-0450 UT UT-06-151 Sat RC-2050 1-ISI-PZR-1 4/20/2006 NDEP-0450 UT UT-06-097 Sat RC-2050 1-ISI-PZR-1 4/20/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

Class 1 Category B-D H-03831 II-SG-OOISGA-CLNIR-09-1 VNIR / B3.140 NDEP-0611 VT VT-06-028 Sat RC-3005 1-ISI-SG-1 4/22/2006 H-03846 II-SG-001SGA-HLNIR-09-1 VNIR / B3.140 NDEP-0611 VT VT-06-029 Sat RC-3005 1-ISI-SG-1 4/22/2006 Class 1 Category B-E H-03745 II-RV-001CRD(42-65) VCRDTVW/ 64.12 NDEP-0612 VT VT-06-122 Sat RC-1005 1-ISI-RV-1 5/11/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-03804 II-RV-00IRVHV-66 VCHVP/ B4.11 NDEP-0612 VT VT-06-124 Sat RC-1005 1-ISI-RV-1 5/11/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

Class 1 Category B-F H-02989 II-PZR-O1NSEW-15 VSE/ 65.40 NDEP-0612 VT VT-06-008 Sat RC-2050 1-ISI-PZR-1 4/18/2006 Comments: Examination performed to requirements of MRP-139. No indications identified.

H-02990 II-PZR-01NSEW-16 VSE / 135.40 NDEP-0612 VT VT-06-009 Sat RC-2050 I-ISI-PZR-1 4/18/2006

Page 4 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13

1. Owner: Carolina Power and Light dba Progress Energy 4. Owner Certificate of Authorization (If Req.): N/A
2. Plant: Shearon Harris Nuclear Plant 5. Commercial Service Date: May 2,1987
3. Plant Unit: 1 6. National Board Number for Unit: 65 Summary No. Comp. ID Comp. Desc. Item Procedure Method/Report/Results System Dwg/ISO Exam Date Comments: Examination performed to requirements of MRP-139. No indications identified.

H-02991 II-PZR-01NSEW-17 VSE / B5.40 NDEP-0612 VT VT-06-010 Sat RC-2050 1-lSI-PZR-1 4/15/2006 Comments: Examination performed to requirements of MRP-139. No indications identified.

H-02992 1I-PZR-01NSEW-18 VSE / 85.40 NDEP-0612 VT VT-06-011 Sat RC-2050 1-ISI-PZR-1 4/15/2006 Comments: Examination performed to requirements of MRP-139. No indications identified.

H-02993 1I-PZR-01NSEW-19 VSE/ B5.40 NDEP-0612 VT VT-06-012 Sat RC-2050 1-lSl-PZR-1 4/15/2006 Comments: Examination performed to requirements of MRP-139. No indications identified.

H-02994 I1-PZR-O1NSEW-20 VSE / B5.40 NDEP-0612 VT VT-06-013 Sat RC-2050 1-ISI-PZR-1 4/15/2006 Comments: Examination performed to requirements of MRP-139. No indications identified.

H-03806 II-RV-001 RVNOZAI-N-01 SE Pipe to Nozzle 55.10 NDEP-0612 VT VT-06-115 Sat RC-1005 1-lSI-RV-1 5/6/2006 Comments: Examination performed to requirements of MRP-139. No indications identified.

H-03808 Il-RV-001RVNOZAO-N- Nozzle to Pipe B5.10 NDEP-0612 VT VTo06-116 Sat RC-1005 1-1SI-RV-1 5/6/2006 06SE Comments: Examination performed to requirements of MRP-139. No indications identified.

H-03810 I1-RV-001 RVNOZBI-N-03SE Pipe to Nozzle B5.10 NDEP-0612 VT VT-06-117 Sat RC-1005 1-1SI-RV-1 5/6/2006 Comments: Examination performed to requirements of MRP-139. No indications identified.

H-03812 lI-RV-001RVNOZBO-N- Nozzle to Pipe 85.10 NDEP-0612 VT VT-06-118 Sat RC- 1005 1-lSl-RV-1 5/6/2006 02SE Comments: Examination performed to requirements of MRP-139. No indications identified.

H-03814 II-RV-001 RVNOZCI-N-05SE Pipe to Nozzle B5.10 NDEP-0612 VT VT-06-119 Sat RC-1005 1-ISI-RV-1 5/6/2006 Comments: Examination performed to requirements of MRP-139. No indications identified.

H-03816 II-RV-001RVNOZCO-N- Nozzle to Pipe B5.10 NDEP-0612 VT VT-06-120 Sat RC-1005 1-lSl-RV-1 5/6/2006 04SE Comments: Examination performed to requirements of MRP-139. No indications identified.

Class 1 Category B-G-1

Page 5 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13

1. Owner: Carolina Power and Light dba Progress Energy 4. Owner Certificate of Authorization (If Req.): N/A
2. Plant: Shearon Harris Nuclear Plant 5. Commercial Service Date: May 2, 1987
3. Plant Unit: 1 6. National Board Number for Unit: 65 Summary No. Comp. ID Comp. Desc. Item Procedure Method/Report/Results System Dwg/ISO Exam Dzite H-03180 II-RCP-01RCPA-FBOLT(1- BPHB / B6.180 NDEP-0439 UT UT-06-126 Sat RC-2025 1-ISI-RCP-1 4/19/2006 24)

H-03819 II-RV-001RVNUT(39-58) BNUT/ B6.10 NDEP-0611 VT VT-06-005 Sat RC°1005 1-1SI-RV-1 4/24/2006 H-03822 1I-RV-001RVSTUD(39-58) BSTUD/ B6.30 NDEP-0439 UT UT-06-127 Sat RC-1005 1-1SI-RV-1 4/19/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-03825 II-RV-001RVWSH(39-58) BWASH/ B6.50 NDEP-0611 VT VT-06-006 Sat RC-1005 1-1S!-RV-1 4/24/2006 Class 1 Category B-G-2 H-01817 II-CS-103CS-492-F-01 (4) BFSC/ 87.50 NDEP-0611 VT VT-06-001 Sat CS-2060 1-IS1-CS-103 4/12/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-03183 II-RCP-01RCPA-SBOLT(1- BPSB / 87.60 NDEP-0611 VT VT-06-015 Sat RC-2025 1-ISI-RCP-1 4/19/2006 12)

H-03741 II-RV-001BCONO-C(3) BCONO / 87.10 NDEP-0611 VT VT-06-016 Sat RC-1005 1-ISI-R V-1 4/21/2006 H-03742 II-RV-001BCONO-D(3) BCONO / 87.10 NDEP-0611 VT VT-06-017 Sat RC-1005 1-151-flV.1 4/21/2006 H-03875 II-SG-001SGC-CLMN(1-16) BNUT / 87.30 NDEP-0611 VT VT-06-034 Sat RC-3005 I-ISI-SGR-1 4/27/2006 H-03876 II-SG-001SGC-CLMS(1-16) BBOLT / B7.30 NDEP-0611 VT VT-06-035 Sat RC-3005 1-ISI-SGR-1 4/27/2006 H-03890 II-SG-001SGC-HLMN(1-16) BNUT / 87.30 NDEP-0611 VT VT-06-036 Sat RC-3005 1-ISI-SGR-1 4/27/2006 H-03891 II-SG-001 SGC-HLMS(1 -16) BBOLT / 87.30 NDEP-0611 VT VT-06-037 Sat RC-3005 1-ISI-SG-1 4/27/2006 H-04473 I1-SI-021SI-250 VBB(1-18) BVBB / 87.70 NDEP-0611 VT VT-06-002 Sat SI-2085 1-ISI-SI-21 4/17/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified. Examined in place under tension.

H-04505 II-SI-022SI-252 VBB(1-18) BVBB/ 87.70 NDEP-0611 VT VT-06-003 Sat SI-2085 1-ISI-SI-22 4/17/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified. Examined in place under tension.

H-04538 II-SI-023SI-254 VBB(1-18) BVBB/ 87.70 NDEP-0611 VT VT-06-004 Sat SI-2085 1-ISI-SI-23 4/17/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified. Examined in place under tension.

H-04656 li-SI-026SI-358 VBB(1-16) BVBB / 87.70 NDEP-0611 VT VT-06-097 Sat SI-2085 1-ISI-SI-26 4/27/2006 H-04701 I1-SI-027S1-135 VBB(1-16) BVBB/ 87.70 NDEP-0611 VT VT-06-100 Sat SI-2085 1-ISI-SI-27 4/27/2006 Class 1 Category B-L-1

Page 6 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13

1. Owner: Carolina Power and Light dba Progress Energy 4. Owner Certificate of Authorization (If Req.): N/A
2. Plant: Shearon Harris Nuclear Plant 5. Commercial Service Date: May 2,1987
3. Plant Unit: 1 6. National Board Number for Unit: 65 Summary No. Comp. ID Comp. Desc. Item Procedure Method/Report/Results System Dwg/ISO Exam Date H-03179 II-RCP-01RCPA-CW-01 TPUMPCW / B132.10 NDEP-0611 VT VT-06-078 Sat RC-2025 1-ISI-RCP-1 4/15/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

Class 1 Category B-M-2 H-04647 I1-SI-0261SI-358 INT AVALINT/ B12.50 NDEP-0613 VT VT-06-098 Sat SI-2085 1-ISI-SI-26 4/27/2006 H-04696 lI-SI-0271S1-135 INT AVALINT/ B12.50 NDEP-0613 VT VT-06-101 Sat SI-2080 1-ISI-SI-27 4/27/2006 irl-ss 1 H-03758 lI-RV-001CRDH-54 VCRDHW/ B14.10 NDEP-0201 PT PT-06-022 Sat RC-1005 1-ISI-RV-1 4/21/2006 H-03759 II.RV-001CRDH-55 VCRDHW/ B14.10 NDEP-0201 PT PT-06-023 Sat RC-1005 1-ISI-RV-1 4/21/2006 H-03760 II.RV-001CRDH-56 VCRDHW/ B14.10 NDEP-0201 PT PT-06-024 Sat RC-1005 1-ISI-RV-1 4/21/2006 Class 1 Category F-A H-00835 CS-H-3243 PZR SPRAY LINE FROM F1.1OR NDEP-0613 VT VT-06-075 Sat CS-2060 4/14/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.

H-04991 RC-H-0004 PZR SURGE LINE FROM F1.10R NDEP-0613 VT VT-06-077 Sat RC-2005 4/14/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.

H-05072 RC-H-0862 LOOP 1 CL OUTLET TO F1.10V NDEP-0613 VT VT-06-083 Sat RC-2005 4/11/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.

H-05329 SI-H-0117 ACCUM A INJ LINE TO RCS F1.10R NDEP-0613 VT VT-06-066 Sat SI-2080 4/11/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-05364 SI-H-0189 SIS RES HXTO RCS HL F1.10V NDEP-0613 VT VT-06-086 Sat SI-2080 4/13/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-05369 SI-H-0231 SIS RES HX TO RCS CL F1.10V NDEP-0613 VT VT-06-076 Sat SI-2080 4/14/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

Class 1 Category R-A H-03026-RI ll-RC-022RC-149-3-SW-1 PE,LR / PC,PIPE R1.10 NDEP-0425 UT UT-06-140 Sat RC-2005 1-ISl-RC-22 4/17/2006 NDEP-0425 UT UT-06-098 Sat RC-2005 1-ISl-RC-22 4/17/2006 Comments: Examination performed to requirements of Request for Relief 2RG-01 0, the Risk-informed IS. No indications identified. Exam limited due to inner radius of elbow for 2" on elbow side.

H-03033-RI ll-RC-022RC-149-3-SW-8 PC,PIPE/PE,LR R1.10 NDEP-0425 UT UT-06-141 Sat RC-2005 1-ISI-RC-22 4/17/2006 NDEP-0425 UT UT-06-099 Sat RC-2005 1-1SI-RC-22 4/17/2006

Page 7 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13

1. Owner: Carolina Power and Light dba Progress Energy 4. Owner Certificate of Authorization (If Req.): N/A
2. Plant: Shearon Harris Nuclear Plant 5. Commercial Service Date: May 2, 1987
3. Plant Unit: 1 6. National Board Number for Unit: 65 Summary No. Comp. ID Comp. Desc. Item Procedure Method/Report/Results System Dwg/ISO Exam Date Comments: Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified. Exam limited due to inner radius of elbow for 2" on elbow side.

H-03048-RI ll-RC-022RC-SW-A6 PE,LR/PC,PIPE R1.10 NDEP-0425 UT UT-06-100 Sat RC-2005 1-ISI-RC-22 4/17/2006 Comments: Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.

H-03050-RI II-RC-022RC-SW-B4 PE,LR / PC,PIPE R1i.10 NDEP-0425 UT UT-06-101 Sat RC-2005 1-ISI-RC-22 4/17/2006 Comments: Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.

H-03052-RI lI-RC-022RC-SW-B6 PE,LR/PC,PIPE R1.10 NDEP-0425 UT UT-06-103 Sat RC-2005 1-ISI-RC-22 4/17/2006 Comments: Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.

H-03053-RI II-RC-022RC-SW-C1O PC,PIPE/PE,LR R1.10 NDEP-0425 UT UT-06-104 Sat RC-2005 1-ISI-RC-22 4/17/2006 NDEP-0425 UT UT-06-142 Sat RC-2005 1-ISI-RC-22 4/17/2006 Comments: Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified. Exam limited due to inner radius of elbow for 2" on elbow side.

H-03054-RI lI-RC-022RC-SW-C11 PE,LR / PC,PIPE R1.10 NDEP-0425 UT UT-06-143 Sat RC-2005 1-ISI-RC-22 4/17/2006 NDEP-0425 UT UT-06-105 Sat RC-2005 1-ISI-RC-22 4/17/2006 Comments: Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified. Exam limited due to inner radius of elbow for 2" on elbow side.

H-03055-RI II-RC-022RC-SW-C12 PC,PIPE/PE,LR R1.10 NDEP-0425 UT UT-06-106 Sat RC-2005 1-ISI-RC-22 4/17/2006 NDEP-0425 UT UT-06-144 Sat RC-2005 1-ISI-RC-22 4/17/2006 Comments: Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified. Exam limited due to inner radius of elbow for 2" on elbow side.

H-03057-RI II-RC-022RC-SW-C19 PE,LR/PC,PIPE R1.10 NDEP-0425 UT UT-06-145 Sat RC-2005 1-ISI-RC-22 4/17/2006 NDEP-0425 UT UT-06-128 Sat RC-2005 1-ISI-RC-22 4/17/2006 Comments: Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified. Exam limited due to inner radius of elbow for 2" on elbow side.

H-03059-RI II-RC-022RC-SW-C8 PC,PIPE / PC,RED R1.10 NDEP-0437 UT UT-06-107 Sat RC-2005 1-1S1-RC-22 4/21/2006 Comments: Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.

H-03142-RI Il-RC-027RC-FW-329 PC,SEE/ PC,PIPE R1.10 NDEP-0425 UT UT-06-108 Sat RC-2005 1-ISl-RC-27 4/17/2006 Comments: Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.

H-03144-RI II-RC-027RC-FW-334 PC,SEE/ PC,PB R1.10 NDEP-0425 UT UT-06-109 Sat RC-2005 1-ISI-RC-27 4/17/2006 Comments: Examination performed to requirements of Request for Relief 2RG-01 0, the Risk-informed IS. No indications identified.

Page 8 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13

1. Owner: Carolina Power and Light dba Progress Energy 4. Owner Certificate of Authorization (If Req.): N/A
2. Plant: Shearon Harris Nuclear Plant 5. Commercial Service Date: May 2, 1987
3. Plant Unit: 1 6. National Board Number for Unit: 65 Summary No. Comp. ID Comp. Desc. item Procedure Method/Report/Results System Dwg/ISO Exam Date Class 2 Category C-0 H-03848 Il-SG-001SGA-STHW-02-1 VSTHW/ C1.20 NDEP-0450 UT UT-06-113 Sat RC-3005 1-ISI-SG-1 4/24/2006 NDEP-0450 UT UT-06-154 Sat RC-3005 1-ISr*SG-1 4/24/2006 NDEP-0450 UT UT-06-153 Sat RC-3005 1-ISI-SG-1 4/24/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XA. No indications identified.

H-03850 Il-SG-001SGA-TSTSW VTSTVW / 01.30 NDEP-0450 UT 1 UT-06-158 Sat RC-3005 1-1SI-SG-1 4/26/2006 NDEP-0450 UT UT-06-157 Sat RC-3005 1-lSI-SG-1 4/26/2006 NDEP-0450 UT UT-06-114 Sat RC-3005 1-1SI-SG-1 4/26/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

Class 2 Category C-B H-03828 ll-SG-001SGA-AFWNTSW- VNTVWI / C2.21 NDEP-0450 UT UT-06-161 Sat RC-3005 1-1SI-SG-1 4/26/2006 11-1 NDEP-0450 UT UT-06-160 Sat RC-3005 1-ISl-SG-1 4/26/2006 NDEP-0301 MT MT-06-028 Sat RC-3005 1-ISI-SG-1 4/26/2006 NDEP-0450 UT UT-06-110 Sat RC-3005 1.151-SG-1 4/26/2006 H-03832 II-SG-001SGA-FWNIR-05-1 VNIR / C2.22 NDEP-0458 UT UT-06-1 11 RC-3005 Sat 1-ISI-SG-1 4/26/2006 H-03833 I1-SG-OO1SGA-FWNTSW- VNTVWI / C2.21 NDEP-0450 UT UT-06-112 Sat RC-3005 1-ISI-SG-1 4/26/2006 05-1 NDEP-0450 UT UT-06-155 Sat RC-3005 1-ISI-SG-1 4/26/2006 NDEP-0301 MT MT-06-029 Sat RC-3005 1-ISI-SG-1 4/26/2006 NDEP-0450 UT UT-06-156 Sat RC-3005 I-151-SG-1 4/26/2006 Class 2 Category C-C H-02431 II-FMR-O1FW-H-01061(8) PC,PIPE / PI,LUGN C3.20 NDEP-0301 MT MT-06-014 Sat FW-3050 1-lSI-FW-MS- 4/29/2006 RC-1 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

Class 2 Category C-F-2 H-02689 II-FW-001FW-FW-700 Red. to Cap C5.61 NDEP-0301 MT MT-06-015 Sat FW-3050 1-ISI-FW-1 4/17/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02690 II-FW-001FW.FW-701 Red. to Cap C5.61 NDEP-0301 MT MT-06-016 Sat FW-3050 1-1SI-FW-1 4/17/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

Page 9 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13

1. Owner: Carolina Power and Light dba Progress Energy 4. Owner Certificate of Authorization (If Req.): N/A
2. Plant: Shearon Harris Nuclear Plant 5. Commercial Service Date: May 2, 1987
3. Plant Unit: 1 6. National Board Number for Unit: 65 Summary No. Comp. ID Comp. Desc. Item Procedure Method/Report/Results System Dwg/ISO Exam Date H-02691 II-FW-001 FW-FW-702 Red. to Cap C5.61 NDEP-0301 MT MT-06-017 Sat FW-3050 1-ISI-FW-1 4/17/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02692 II-FW-001FW-FW-703 Pipe to Cap C5.61 NDEP-0301 MT MT-06-018 Sat FW-3050 1-ISI-FW-1 4/17/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02694 II-FW-001FW-FW-705 Pipe to Cap C5.61 NDEP-0301 MT MT-06-020 Sat FW-3050 1-tSI-FW-1 4/17/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02708 II-FW-002AF-13-FW-258 PC,RED / PC,PIPE C5.51 NDEP-0437 UT UT-06-011 Sat AF-3065 1-ISI-FW-2 4/19/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02709 II-FW.002AF-16-1-FW-263 PC,PIPE/PC,PIPE C5.51 NDEP-0437 UT UT-06-012 Sat AF-3065 1-ISI-FW-2 4/19/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-0271 0 II-FW-002AF-16.2-FW-261 PE,LR/PC,PIPE C5.51 NDEP-0437 UT UT-06-013 Sat AF-3065 1-ISI-FW-2 4/29/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02711 ll-FW-002AF-16-2-FW-262 PC,PIPE/PE,LR C5.51 NDEP-0437 UT UT-06-014 Sat AF-3065 1-ISI-FW-2 4/19/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02741 1I-FW-003AF-14.FW-268 PC,VLV / PC,PIPE C5.51 NDEP-0437 UT UT-06-015 Sat AF-3065 1-ISI-FW-3 411912006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02742 II-FW-003AF.17-1.FW-270 PC,PIPE/PE,LR C5.51 NDEP-0437 UT UT-06-016 Sat AF-3065 1-ISI-FW-3 4/19/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02743 II-FW-003AF-17-1-FW-271 PE,LR/PC,PIPE C5.51 NDEP-0437 UT UT-06-017 Sat AF-3065 1-ISI-FW-3 4/19/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02744 II-FW-003AF-17-1-FW-272 PC,PIPE/PC,PIPE C5.51 NDEP-0437 UT UT-06-018 Sat AF-3065 1-ISI-FW-3 4/19/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02794 II-FW-004AF-15-FW-267 PC,RED/ PC,PIPE C5.51 NDEP-0437 UT UT-06-022 Sat AF-3065 1-ISI-FW-4 4/19/2006

Page 10 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13

1. Owner: Carolina Power and Light dba Progress Energy 4. Owner Certificate of Authorization (If Req.): N/A
2. Plant: Shearon Harris Nuclear Plant 5. Commercial Service Date: May 2, 1987
3. Plant Unit: 1 6. National Board Number for Unit: 65 Summary No. Comp. ID Comp. Desc. Item Procedure Method/ReDort/Results System Dwg/ISO Exam Date Comments: Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.

H-02795 lI-FW-004AF-18-FW-280 PE,LR / PC,PIPE C5.51 NDEP-0437 UT UT-06-023 Sat AF-3065 1-ISI-FW-4 4/19/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02796 ll-FW-004AF-18-FW-281 PC,PIPE/ PE,LR C5.51 NDEP-0437 UT UT-06-024 Sat AF-3065 1-lSI-FW-4 4/19/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.

H-02797 11-FW-004AF-18-FW-282 PC,PIPE / PC,PIPE C5.51 NDEP-0437 UT UT-06-025 Sat AF-3065 1-ISI-FW-4 4/19/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.

H-02856 Il-MS-001MS-FW-301 PC,PIPE/PC,PIPE C5.51 NDEP-0437 UT UT-06-050 Sat MS-3020 1-1SI-MS-1 4/22/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.

H-02857 ll-MS-001MS-FW-302 PCPIPE/ PC,VLV C5.51 NDEP-0437 UT UT-06-051 Sat MS-3020 1-ISI-MS-1 4/29/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.

H-02858 ll-MS-001MS-FW-302A PLSW,P/ C5.52 NDEP-0437 UT UT-06-052 Sat MS-3020 1-1SI-MS-1 4/29/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02887 II.MS-001M S-SW-C 11 PC,PIPE / PC,NOZW C5.51 NDEP-0437 UT UT-06-054 Sat NIS-3020 1-IS I-MS-1 4/15/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified. Exam limited due to obstruction from sweep-o-let and permanent pipe support.

H-02888 fl-MS-001MS-SW-C12 PCPIPE/PC,NOZW C5.51 NDEP-0437 UT UT-06-055 Sat MS-3020 1-ISI-MS-1 4/29/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.

H-02889 ll-MS-001MS-SW-C13 PC,PIPE / PC,NOZW C5.51 NDEP-0437 UT UT-06-056 Sat MS-3020 1-1SI-MS-1 4/15/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.

H-02890 Il-MS-0011MS-SW-C14 PC,PIPE/ PC,NOZW C5.51 NDEP-0437 UT UT-06-057 Sat MS-3020 1-1SI-MS-1 4/15/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section X1. No indications identified. Exam limited due to obstruction from sweep-o-let and permanent pipe support.

H-02891 II-MS-001MS-SW-C15 PCPIPE/ PC,NOZW C5.51 NDEP-0437 UT UT-06-058 Sat MS-3020 1-ISI-MS-1 4/15/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified. Exam limited due to obstruction from sweep-o-let and permanent pipe support.

H-02893 Il-MS-0OlMS-SW-C3 PC,PIPE / PC,PIPE C5.51 NDEP-0437 UT UT-06-059 Sat MS-3020 1-1SI-MS-1 4/20/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.

Page 11 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13

1. Owner: Carolina Power and Light dba Progress Energy 4. Owner Certificate of Authorization (If Req.): N/A
2. Plant: Shearon Harris Nuclear Plant 5. Commercial Service Date: May 2, 1987
3. Plant Unit: 1 6. National Board Number for Unit: 65 Summary No. Comp. ID Comp. Desc. Item Procedure Method/ReDort/Results System Dwq/ISO Exam Date H-02894 II-MS-001MS-SW-C30 PBCC,EX/ PC,PIPE C5.51 NDEP-0437 UT UT-06-060 Sat MS-3020 1-1St-MS-1 4/20/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02895 Il-MS-001MS-SW-C34 PBCC,EX/ PC,PIPE C5.51 NDEP-0437 UT UT-06-061 Sat MS-3020 1-1SI-MS-1 4/20/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02896 II-MS-O01 MS-SW-C36 PC,PIPE / PC,PIPE C5.51 NDEP-0437 UT UT-06-062 Sat MS-3020 1-1SI-MS-1 4/20/2006 Currirrrents: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02897 II-MS-001MS-SW-C3A PLSW,P/ C5.52 NDEP-0437 UT UT-06-063 Sat MS-3020 1-1SI-MS-1 4/20/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02898 II-MS-001MS-SW-C4 PBCC,EX/PC,PIPE C5.51 NDEP-0437 UT UT-06-064 Sat MS-3020 1-1SI-MS-1 4/20/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02899 II-MS-001MS-SW-C5 PC,PIPE/ PC,CAP C5.51 NDEP-0437 UT UT-06-065 Sat MS-3020 1-1SI-MS-I 4/25/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02931 II-MS-002MS-FW-680 PC,PIPE / PELR C5.51 NDEP-0437 UT UT-06-092 Sat MS-3020 1-ISI-MS-2 4/21/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02932 II-MS-002MS-FW-681 PC,PIPE / PC,VLV C5.51 NDEP-0437 UT UT-06-093 Sat MS-3020 1-ISI-MS-2 4/21/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.

H-02933 I1-MS-002MS-FW-682 PC,VLV / PC,PIPE C5.51 NDEP-0437 UT UT-06-094 Sat MS-3020 1-ISI-MS-2 4/29/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02934 Il-MS-002MS-FW-683 PC,PIPE / PC,VLV C5.51 NDEP-0437 UT UT-06-095 Sat MS-3020 1-ISI-MS-2 4/29/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-02941 II-MS-002MS-SW-E3 PE,LR / PC,PIPE C5.51 NDEP-0437 UT UT-06-096 Sat MS-3020 1-ISI-MS-2 4/21/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

Class 2 Category F-A H-00242 AF-H-0470 FROM FP B VALVE 1AF-102 F1.20R NDEP-0613 VT VT-06-106 Sat AF-3065 5/2/2006 H-00247 AF-H-0486 FROMFP B VALVE 1AF-81 F1.20R NDEP-0613 VT VT-06-107 Sat AF-3065 5/1/2006 H-00272 BD-H-0166 S/GbCBLDWN TO ISO F1.20R NDEP-0613 VT VT-06-109 Sat BD-3010 4/26/2006

Page 12 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13

1. Owner: Carolina Power and Light dba Progress Energy 4. Owner Certificate of Authorization (If Req.): N/A
2. Plant: Shearon Harris Nuclear Plant 5. Commercial Service Date: May 2,1987
3. Plant Unit: 1 6. National Board Number for Unit: 65 Summary No. Comp. ID Comp. Desc. Item Procedure Method/Report/Results System Dwg/ISO Exam Date H-00274 BD-H-0208 S/G B BLDWN TO ISO F1.20R NDEP-0613 VT VT-06-1C)8 Sat BD-3010 4/26/2006 H-00784 CS-H-1426 RCP B SEAL INJ AT CONT F1.20R NDEP-0613 VT VT-06-11 10 Sat CS-2060 4/29/2006 H-00786 CS-H-2603 RCPASEAL INJ AT CONT F1.20R NDEP-0613 VT VT-06-1111 Sat CS-2060 4/29/2006 H-00792 CS-H-2820 RCPC SEAL INJ AT CONT F1.20R NDEP-0613 VT VT-06-10'4 Sat CS-2060 4/23/2006 H-00800 CS-H-2855 RC S-CEAL INJ AT CONT F1.20B NDEP-0613 VT VT-06-0( 33 Sat CS-2060 C-1-236-1-CS- 4/10/2006 PENE M-11 H-2855 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-00804 CS-H-2860 RCP C SEAL INJATCONT F1.20R NDEP-0613 VT VT-06-059 Sat CS-2060 4/11/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-00818 CS-H-2880 RCP B SEAL INJ AT CONT F1.20R NDEP-0613 VT VT-06-061 Sat CS-2060 C-1-236-1-CS- 4/10/2006 PENE M-10 H-2880 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-01073 FW-H-01 02 FROM PENE M-4 TO S/G A F1.20R NDEP-0613 VT VT-06-062 Sat FW-3050 C-5-261-1-FW- 4/10/2006 H-102 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-01097 FW-H-0491 ESR 97-807 F1.20R NDEP-0613 VT VT-06-112 Sat FW-3050 5/2/2006 H-02406 II-CTP-01 CTPB-H-001 -003 F1.40 NDEP-0613 VT VT-06-084 Sat CT-2070 4/17/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-04937 MS-H-0093 S/G C OUTLET CONN F1.20R NDEP-0613 VT VT-06-113 Sat MS-3020 4/25/2006 H-04938 MS-H-0094 S/G" 0OUTLET CONN' F1.20V NDEP-0613 VT VT-06-114 Sat MS-3020 4/25/2006 H-05075 RH-H-0010 RFR-HX "B(TLE -F61 F1.20V NDEP-0613 VT VT-06-102 Sat RH-2085 4/6/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-05295 SI-H-0022 LOW HEAD INJ TO RCS CL F1.20V NDEP-0613 VT VT-06-082 Sat SI-2080 4/12/2006 Comments: Examination performed to requirements of the 1989 Edition of ASME Section Xi. No indications identified.

H-05352 SI-H-0166 SIS RES HX TO RCS HL F1.20R NDEP-0613 VT VT-06-064 Sat SI-2080 C-1-236-1-SI-H- 4/10/2006 LOOP 1 166 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

H-05386 SI-H-0274 ACCUM TK C INJ LINE TO F1.20B NDEP-0613 VT VT-06-060 Sat SI-2080 C-1-236-1 -SI-H- 4/10/2006 RCSCLLOOP3 274 Comments: Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.

Page 13 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13

1. Owner: Carolina Power and Light dba Progress Energy 4. Owner Certificate of Authorization (If Req.): N/A
2. Plant: Shearon Harris Nuclear Plant 5. Commercial Service Date: May 2, 1987
3. Plant Unit: 1 6. National Board Number for Unit: 65 Summary No. Comp. ID Comp. Desc. Item Procedure Method/Report/Results System Dwg/ISO Exam Date Class 2 Category R-A H-01 184-RI II-AF-008AF-FW-8 PC,PIPE/VSG1A R1.10 NDEP-0437 UT UT-06-001 Sat AF-3065 1-ISI-AF-8 4/26/2006 H-02019-RI II-CT-007CT-FW-31 PC,PIPE/ PC,PB R1.10 NDEP-0425 UT UT-06-002 Sat CT-2070 1-ISI-CT-7 4/12/2006 NDEP-0425 UT UT-06-135 Sat CT-2070 1-ISI-CT-7 4/12/2006 Comments: Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.

H-02430-RI ii-FMR-0 1PF-FW-7 PE,LR/VNOZ1AI RI.10 NDEP-0437 UT UT-06-004 Sat FW-3050 1-181-FW-MS- 4/26/2006 RC-1 Comments: Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.

H-04019-RI II-SI-008SI-FW-449 PCPIPE/PP,FHS R1.10 NDEP-0425 UT UT-06-115 Sat SI-2085 1-ISI-SI-8 4/10/2006 Comments: Examination performed to requirements of Request for Relief 2RG-01 0, the Risk-informed IS. No indications identified.

H-04020-RI II-SI-008SI-FW-450 PC,VLV / PC,PIPE R1.10 NDEP-0425 UT UT-06-116 Sat SI-2085 1-ISI-SI-8 4/10/2006 NDEP-0425 UT UT-06-133 Sat SI-2085 1-ISI-SI-8 4/10/2006 Comments: Examination performed to requirements of Request for Relief 2RG-01 0, the Risk-informed IS. No indications identified. Exam limited due to valve to pipe configuration.

H-04030-RI II-SI-008SI-FW-456 PC,PIPE / PP,FHS R1.10 NDEP-0425 UT UT-06-117 Sat SI-2085 1-ISI-SI-8 4/13/2006 Comments: Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.

H-04041-RI II-SI-008SI-SW-A3 PE,LR / PC,PIPE R1.10 NDEP-0425 UT UT-06-119 Sat SI-2085 1-ISI-SI-8 4/10/2006 Comments: Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.

H-04042-RI II-SI-008SI-SW-A4 PC,PIPE/ PE,LR R1.10 NDEP-0425 UT UT-06-120 Sat SI-2085 1-ISI-SI-8 4110/2006 Comments: Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.

H-04112-RI II-SI-008SI-SW-J4 PE,LR / PC,PIPE R1.10 NDEP-0425 UT UT-06-122 Sat SI-2085 1-ISI-SI-8 4/13/2006 Comments: Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.

H-04626-RI 1I-SI-025SI-SW-D5 PC,PIPE/ PE,LR R1.10 NDEP-0425 UT UT-06-137 Sat SI-2085 1-ISI-SI-25 4/13/2006 NDEP-0425 UT UT-06-136 Sat SI-2085 1-ISI-SI-25 4/13/2006 Comments: Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.

H-04627-RI II-SI-025SI-SW-D6 PE,LR / PC,PIPE R1.10 NDEP-0425 UT UT-06-138 Sat SI-2085 1-ISI-SI-25 4/13/2006 NDEP-0425 UT UT-06-123 Sat SI-2085 1-ISI-SI-25 4/13/2006

Page 14 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13

1. Owner: Carolina Power and Light dba Progress Energy 4. Owner Certificate of Authorization (If Req.): N/A
2. Plant: Shearon Harris Nuclear Plant 5. Commercial Service Date: May 2, 1987
3. Plant Unit: 1 6. National Board Number for Unit: 65 Summary No. Comp. ID Comp. Desc. Item Procedure Method/Report/Results System Dwg/ISO Exam Date Comments: Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.

H-04628-RI II-SI-025SI-SW-D7 PCPIPE/PE,LR R1.10 NDEP-0425 UT UT-06-124 Sat SI-2085 1-1SI-SI-25 4/13/2006 Comments: Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.

H-04629-RI II-SI-025SI-SW-D8 PELR/PC,PB R1.10 NDEP-0425 UT UT-06-125 Sat SI-2085 1-ISI-SI-25 4/13/2006 NDEP-0425 UT UT-06-139 Sat SI-2085 1-ISI-SI-25 4/13/2006 Comments: Examination performed to requirements of Request for Rp.linf PRG-01 0, the Risk-informed IS. No indications identified.

Attachment for Serial: HNP-06-081 SECTION 4 (4 Pages)

COMPONENT SUPPORTS

Attachment for Serial: HNP-06-081 ASME Section Xl Class 1 and 2 Component Support Examination Program Category F-A Item FI.10B Class I Hanger - Box Type Support Support ID Location Exam Type Exam Date Exam Results Examiner None scheduled n/a n/a n/a n/a n/a Category F-A Item FI.1OR Class I Hanger - Rigid Strut Support Support ID Location Exam Type Exam Date Exam Results Examiner RC-H-245 RCB 307'@ PZR VT-3 10/21/2004 SAT GDL SI-H-317 RCB 246' Az-161 R-41' VT-3 10/20/2004 SAT GDL/MDH SI-H-325 RCB 248' Az-160 R-22' VT-3 10/20/2004 SAT GDL/MDH Category F-A Item FI.1OV Class I Hanger - Variable (Spring Can) Support Support ID Location Exam Type Exam Date Exam Results Examiner CS-H-2891 RCB 255' Az-240 R-39' VT-3 10/20/2004 SAT GDL/MDH RC-H-199 RCB 307'@ PZR VT-3 10/20/2004 SAT GDL RC-H-226 RCB 309'@ PZR VT-3 10/20/2004 SAT GDL Category F-A Item F1.20A Class 2 Hanger - Anchor Support ID Location Exam Type Exam Date Exam Results Examiner None scheduled n/a n/a n1a n1a n1a

Attachment for Serial: HNP-06-081 ASME Section Xl Class 1 and 2 Component Support Examination Program Category F-A Item F1.20B Class 2 Hanger - Box Type Support Support ID Location Exam Type Exam Date Exam Results Examiner RH-H-12 (6' ladder) RAB 246' 4'S/39 5MV/E VT-3 5/10/2004 SAT GDL/SAB SI-H-165 RCB 247' AZ-6 R-47' VT-3 10/17/2004 SAT GDL/JDS RH-H-1 85 RAB 240' 2'N/36 9'E/E VT-3 10/24/2004 SAT RPS Category F-A Item F1.20R Class 2 Hanger - Rigid Strut Support Support ID Location Exam Type Exam Date Exam Results Examiner CS-H-2603 RAB 255' 6'N/16 1'W/GY VT-3 5/10/2004 SAT GDL/SAB CS-H-2853 RCB 255' AZ-1 83 R-50' VT-3 10/20/2004 SAT GDL/MDH CS-H-2948 RCB 255' AZ-341 R-48' VT-3 10/20/2004 SAT GDL/MDH Category F-A Item F1.20V Class 2 Hanger - Variable (Spring Can) Support Support ID Location Exam Type Exam Date Exam Results Examiner RH-H-349 RAB 193' 8'N/32 5'W/FZ VT-3 10/23/2004 SAT RPS Category F-A Item F1.40 Class 1 and 2 Equipment Supports Support ID Location Exam Type Exam Date Exam Results Examiner RHR Pump 1B-SB Cooler ( I examination point) - Class 2 lI-RHPC-lB-H-001 RAB 195'N 4'S/34 10'W/FZ VT-3 10/24/2004 SAT GDL RHR Heat Exchanger lB-SB ( 8 examination points ) - Class 2 lI-RHR-0IRHRB-H-001-008 RAB 236' 4'S/36 13'E/E VT-3 10/24/2004 SAT RPS

Attachment for Serial: HNP-06-081 ASME Section Xl Class I and 2 Component Support Examination Program Steam Generator 1B-SN (4 examination points on vertical support columns ) - Class I II-SG-001SGB-H-001-004 RCB 255' Az-265 R-32' VT-3 10/25/2004 SAT SAB Comment: Exam resulting from visual failure in 2-2-11 (RFO11) - loose bolting Category F-A Item F1.40 Class 1 and 2 Equipment Supports - continued Support ID Location Exam Type Exam Date Exam Results Examiner Steam Generator 1B-SN Upper Lateral Support ( 2 examination points including ULS bolting ) - Class 1 II-SG-OOISGB-H-007-008 RCB 302' Az-265 R-32' \/T-3 10/9R22004 SAT NLC!J\IW Comment: Exam resulting from visual failure in 2-2-11 (RFO11) - loose bolting Steam Generator IC-SN Upper Lateral Support ( 2 examination points including ULS bolting ) - Class I II-SG-001SGC-H-007-008 RCB 302' AZ-140 R-32' VT-3 10/28/2004 SAT NLC/JVW Comment: Exam resulting from visual failure in 2-2-11 (RFO11) - loose bolting Reactor Vessel IX-SN Nozzle Supports (6 examination points) - Class 1 II-RPV-01H-001-006 RCB 255' Center VT-3 10/30/2004 SAT M. DUGAN Comment: Exam included in RF012 scope to coincide with ISI visual exams of nozzle welds Comments:

PSI performed on CE-H-11 lAW WO 397803 KMK 10124104 - SAT PSI performed on SW-H-2539 lAW WO 89126 RPS 10/28/04 - SAT

Attachment to Serial: HNP-06-081 SECTION 5 (48 Pages)

NIS-2 FORMS REPORT OF REPAIRS AND REPLACEMENTS

WO# 654038-01 R/R# 03-02-0033 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner CP&L dba Progress Energy Date 06/09/2006 Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 654038-01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System Service Water 5 (a) Applicable Construction Code ASME Section 11 1974 Edition, Winter 1976 Addenda, N-416-2 Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

Expansion Joint Unknown Unknown Unknown 1SW-E051 unknown Repaired Yes Nuts Unknown N/A N/A N/A Unknown Replaced No Nuts Nova N/A N/A N/A 2004 Replacement No Capscrews Unknown N/A N/A N/A Unknown Replaced No Capscrews Nova N/A N/A N/A 2005 Replacement No

7. Description of Work: weld repair of expansion joint
8. Tests Conducted: Hydrostatic [] Pneumatic [I Nominal Operation Pressure ED Other E] Pressure ___psi Test Temp. !_F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet in numbered and the number of sheet is recorded at the top of this form.

9 Sheet 2 of 2 WO# 654038-01

..... R/R# 03-02-0033 S.FORM NIS-2 (Back)

9. Remarks Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this repair conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed *- Z* ,*

  • ISI Coordinator Date A2ZZaQo *.

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut hae ipspected the components described in this K)

Owner's Report during the period of 1/5/2006 to e/A*v/6 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

-4r_,**Commissions NC 1507, ABIN NS

-.*perrs Signature National Board, State, Province, and Endorsements Date *f*,*'

WO# 626371-05 R/R# 05-02-0039 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner CP&L dba Progress Enerqy Date 06/13/2006 Name P.O. Box 1551, Raleigh, N'. 27602-1551 Sheet1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 626371-05 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System Charging System 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of
  • Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

Nut Unknown N/A N/A CS-H-1395 Unknown Replaced No Nut Coloc N/A N/A CS-H-1395 Unknown Replacement No

7. Description of Work: Replaced nuts on support
8. Tests Conducted: Hydrostatic E] Pneumatic El Nominal Operation Pressure El Other El Pressure ____psi Test Temp. _ -F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/22 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet in numbered and the number of sheet is recorded at the top of this form.

V, Sheet 2 of 2 WO# 626371-05 R/R# 05-02-0039 FORM NIS-2 (Back)

9. Remarks Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A ISI Coordinator Date 44 '1/*i2 G Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartforg, Connecticut haveyinspgcted the components described in this Owner's Report during the period of 4..l$ . to

  • /_ /oK. 6.* , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions NC 1507, ABIN NS Ins r's Signature National Board, State, Province, and Endorsements Date 0!1,lb&)

WOOf 672739-02

£ C)~ R/R# 05-02-0041 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner CP&L dba Procress Enerciv Date 06/13/2006 Name P.O. Box 1551, Raleigqh, N.C. 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 672739-02 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System Sampling System 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, N-416-2 Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced,. Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

ISP-200 Target Rock 2 604 None 1984 Repaired Yes 1SP-200 disk Target Rock Unknown N/A None 1984 Replaced No ISP-200 disk Target Rock 1517 or 1531 NIA 92201-I 2004 Replacement No

7. Description of Work: Removed/replaced seal weld and replaced valve disk
8. Tests Conducted: Hydrostatic [] Pneumatic El Nominal Operating Pressure [

Other E] Pressure psi Test Temp. _ F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 WOlf 672739-02 R/R# 05-02-0041 FORM NIS-2 (Back)

9. Remarks. .. ............

- . Applicable Manufacturer's Data Reports to be attached..

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A

. -- - Certificate of Authbrization No. N/A* Expiration Date N/A

  • 1 Signe -l ___________ I~l CnAr~1in~tnr Date 3 ,e 49C Owner or Owner's Designee, Title IqI Coordinator CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have, inspected the components described in this Owner's Report during the period of 4/12/2006 to 7/../,A , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

,0fR.,, 2-1. Commissions NC 1507, ABIN NS J - Kspectores Signature National Board, State, Province, and Endorsements Date Z XAO 0

WOU 680701-01 RIR# 05-02-0056 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner CP&L dba Progress Enerqy Date 06/13/2006 -

Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Sheet 1 of 2 Address

2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO4 680701-01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name.

5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A

4. Identification of System CS - Chemical Volume Control 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 ,.Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No) 1GS-747 disk Unknown Unknown N/A None Unknown Replaced No lCS-747 disk BW/IP International Pump Unknown N/A 40276 1997 Replacement No
7. Description of Work: Replace disk
8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operation Pressure El Other E] Pressure ___psi Test Temp. ___ F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet in numbered and the number of sheet is recorded at the top of this form.

0 Sheet 2 of 2 WO# 680701-01 R/R# 05-02-0056 FORM NIS-2 (Back)

9. Remarks . .-

Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed ,2e-*. v '_.. , . !SI Coordinator Date 1vz 6 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have insppcted the components described in this Owner's Report during the period of 4/20/2006 to A,04iS , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions NC 1507, ABIN NS

  • rSI*e Sig -na ture National Board, State, Province, and Endorsements Date _________

N

~. r.

- WO# 663969-01 R/R# 06-02-0057 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner CP&L dba Proaress Enermy Date 06/15/2006 Name-- -.

Sheet 1 of 2 Address Plant Shearon Harris Nuclear Power Plant Unit 1 Name

- 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WOlf 663969-01 Address Repair Organization P.O. No., Job No., etc.

3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hifl, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System CT - Containment Spray 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No) 1CT-65 disk Rockwell Edwards Unknown N/A None Unknown Replaced No ICT-65 disk Edward Vogt Valve Co AV-82 N/A None 2001 Replacement No 1CT-65 Rockwell Edwards Unknown N/A None Unknown Repaired No
7. Description of Work: remove/replace seal weld, replace valve disk
8. Tests Conducted: Hydrostatic El Pneumatic E] Nominal Operating Pressure LI Other nI Pressure ___psi Test Temp. _ F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 WO# 663969-01 R/R# 06-02-0057 FORM.NIS-2 (Back) -

9. Remarks ___.

Applicable Manufacturer's Data Reports to be attached.

I-CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed 7Z**4-," ,,', .'--, -ie .-- , IS1Coordinator Date Z/

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut h veirspected the components described in this Owners Report during the period of 2/14/2005 to 4 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

alc;, A Commissions NC 1507, ABIN NS

, llnsketor's Signature National Board, State, Province, and Endorsements Date.

K-,

.~

WO# 462410-01 R/R# 06-02-0058 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner CP&L dba Proaress Enerav Date 06/15/2006 Name P.O. Box 1551, Raleigqh, N.C. 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd.. New Hill. N.C. 27562-0165 WO# 462410-01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy_ Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd.. New Hill. N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A

.4. Identification of System CT - Containment Spray 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989 , Addenda N/A

6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

ICT-26 Nuts Unknown N/A N/A None Unknown Replaced No I CT-26 Nuts Southern Fasteners N/A N/A None 2001 Replacement No 1CT-26 Studs Unknown N/A N/A None Unknown Replaced No 1CT-26 Studs Nova N/A N/A None 2005 Replacement No

7. Description of Work: Replace studs and nuts
8. Tests Conducted: Hydrostatic E] Pneumatic El Nominal Operating Pressure [l Other E] Pressure___psi TestTemp. 2F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 0 WO# 462410-01 R/R# 06-02-0058 FORM NIS-2 -2 (Back)

a. "
9. Remarks Applicable Manufacturer's Data Reports to be attach'ed.. - -" -

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or~replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed , - l~i (r-rd~riinftrr Date /*-*(..)6 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut h ve ipspected the components described in this Owner's Report during the period of 4/28/2005 to ., and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

  • 'O* 07,&,"* Commissions NC 1507, ABIN NS

ý V*spector's Signature National Board, State, Province, and Endorsements Date 1,0d*

K>

4 1

, WO# 458295-01 R/R# 06-02-0125 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner -CP&L dba Proaress Eneray Date 06/15/2006 Name P.O. Box:1551, Raleigh, N.C. 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 458295-01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System CS - Chemical Volume Control 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No) 3SW1.5-168SB-1 Unknown None 64 None Unknown Replaced Yes 3SW1.5-168SB-1 Dubose National Energy 187461 NA 455374 1993 Replacement No Services 187461___A_455374 19_eaem't N
7. Description of Work: Replace piping to cooler 1CS-CSIP
8. Tests Conducted: Hydrostatic ] Pneumatic [ Nominal Operating Pressure [

Other [] Pressure _psi Test Temp. .___F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 WO# 458295-01 R/R# 06-02-0125 FORM NIS-2 (Back)

9. Remarks Code Case N-416-2 used Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE.

We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed *.*__#", *, . ISI Coordinator Date 4Z*.2.

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut haye igspected the components described in this Owner's Report during the period of 9/15/2003 to ,,&,AA$,t. , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions NC 1507, ABIN NS In ec rSsignature National Board, State, Province, and Endorsements Date--,74

WO# 445179-01 R/R# 06-02-0138 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner CP&L dba Progress Energy Date 07/26/2006 Name P.O. Box 1551, Raleicqh, N.C. 27602-1551 Sheet l of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 445179-01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System MS - Main Steam 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None' Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989, Addenda N/A-
6. Identification of Components Repaired or R6placed and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No) 1MS-44 Crosby N57374-01-0006 834 None 1980 Replaced Yes 1MS-44 Crosby N57374-O0-0018 856 None 1980 Replacement Yes Stud Unknown N/A N/A None Unknown Replaced No Stud T&T Enterprises N/A N/A ABK 1998 Replacement No Nut Unknown N/A N/A None Unknown Replaced No Nut Nova N/A N/A 2G3E1 2002 Replacement No
7. Description of Work: Replace safety valve
8. Tests Conducted: Hydrostatic E] Pneumatic El Nominal Operating Pressure Z Other [] Pressure .___psiTest Temp. °F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 WO# 445179-01 R/R# 06-02-0138 FORM NIS-2 (Back)

9. Remarks Form NV-1 attached

..... Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE*.

We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A _______ " _ Expiration Date N/A ISI Coordinator Date 7,/2Ie/2 Sinned v

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance CompanV of Connecticut of Hartford, Connecticut havy in pected the components described in this Owner's Report during the period of 5/2/2006 to Z/Ž-. / .& . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

__(___ _ _ _ Commissions NC 1507, ABIN NS J Inspector's Signature National Board, State, Province, and Endorsements Date 7//04

WO# 447876-01 R/Rff 06-02-0140 Lb £;:

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner CP&L dba Prowress Enerqy Date 06/27/2006 Name P.O. Box 1551, Raleigh, N.C. 27602-1551 - Sheet 1 of 2. .

Address

2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 447876-01 Address .Repair Organization P.O. No., Job No., etc.

Work Performed By Progress Energy

3. Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A A..dres Address . ,... "Expiration Date N/A
4. Identification of System MS - Main Steamr 5 (a) Applicable Construction Code ASME Section II11974 Edition, Winter 1976 Addenrda, None Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989 , Addenda NIA
6. Identification of Components Repaired or Replaced and Replacement Components Repaired. ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No) 1MS-45 Crosby N57374-01-0001 829 None 1980 Replaced Yes 1 MS-45 Crosby N57374-00-0009 837 None 1980 Replacement Yes
7. Description of Work: Replace safety valve
8. Tests Conducted: Hydrostatic [] Pneumatic E] Nominal Operating Pressure 0 OtherE] Pressure psi Test Temp. _ F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 o "

WO 447876-01

-. R/R9 06-02-01f406 FORM NIS-2 (Back)

9. .Remarks ,iJr-/ p /eAI

'. * .... . Aniplicable Manufacturer's Data Reports to be attached.

A r-CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code, Section Xl.

Type Code Symbol Stamp N/A

. -1Gertificate of Authorization-No.-N/A . .......... ........... ... Expiration Date N/A' . -

Signed: 4, J

-,', ISI Coordinator Date &' 74- ? 6 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have ijspected the components described in this Owner's Report during the period of 5/2/2006 to Z4/ A.y..,4 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions NC 1507, ABIN NS ns*,ctor's Signature National Board, State, Province, and Endorsements Date '

' .}.i~ . I

~14d ~

r CROSBY VALVE a GAGE COMPANY CRQ 3 WR ENTHAM, MASS FEJ)RM NV-I rOR'SAF8:TY AN' 4tArE:TYUF;I.IIP VAI.VF*.S O.C.-44C As. requizred byv tle I'fovI~iamns! 44? I. AWEF Coil. Rtubs!

DATA IREPOIRT Saft~v and Safely Iteh(.f Valves

, , ro;v. V .. _v

& Gj __C j., 3_Ke.ndrick .L ._ ren tha!pn, .._HA 0209.3 N-u11'r and Afldlri%s HA\ *.t-'." r(c~r ,. * ............N4064) Contraict ot ... !t11/28/73 DIU . .. " 1., 1*.'Ima rdl No..f37 o Pr Fbasco Services Inc.. 2 Rector St.,

.-..~ -,. Room 840, New York, New York _____ ., ,. NY-435038 Carolina Power & L.ight - Shearon Harris Nuclear Power Plant Name and Addless New 1111, Wake County N. CaroLina
,
-.' . *.. .:A, :' 11;ýIit - -

\1,r 4

~ 4 rII~,2N-R9SA-1 ' 573174-00-0009 N! _irit 1rInN.D-C-57374 Rev. I)

Rel 00 63 ____--1L-90.13. 1b'/hr saxt ... 11  !ý 1. ;('~rr 57 S .P I S5.)

  • I/'.

2 ~ tOL21971 A.ed~TU Wintcr 1972 Nqflq0q-32-001 3 ASME S~A 10 5

9091 7-33-0015 ASME ASME SA193 Gr. B6 N90087-52-nl3!,!

A!XE SA182 Gr. F31.6 N90911-32-001 1 N91 167-31-0001 ASE SA182 Type 316 N909 I 0008 1 ... i..K'72q5-32-0001 ASME SA105 1

i N93335-3!,-0085 ASHE SA193 Gr. B6 N572 () 9 - 4~: -0198H 893895-60-0341I A-*.M...SAI 93..Cr. 11.6 I _________

,,' *"'/'t

,,*,0 42.Si NX2_780-L'O87 A`N't I A 6 11-7.~

K5729532-000 0

41S.:m, K514-5-21noo'

e. ozler VIINm, ... i ' h  :~.S~'m Bot nnt Stud ~90l3ASME SA193 Gr. B7 Bonnet Nut 1490914s ASflE SA194 C..211 a

in-li t Stud 1490915 ASM' SA193 Ci'. Vl

_n 0

C

.iL/~/Z... ~ Cro;by Valve & Co;~(:. '-.-

e Cer:lficalv: -if Atithi:riza,:n..'~, 1.878 - trb r 30, 19801 CERTIFICATE O)F Sli'~Kp  :-O I re-, tre Vf's~seI Wif'P(:t('ts aind tbeLState (I I:,.inc. 'aif___

Factory IMtjlS~e-itjrod nl!.

ins~iecir'd the equimJuent flescrailici in thin:: Data. Reji'.ra im.. .. ~ '.~.5:,.

11-Mmint  !,, -'.:da nv with 2h 31;icn m':l: .W I . -.*.' s (I.

) stmh,

  • 5*~ i gm lIit:u t Ii,s It.% .Iys er I f ica [e. niz l'.!.hr tile -I '-md!;

..! .. .I' *(:. -1.-* t T.' .. ':

the .inspIc~tor nt.r hisa cmuisic.-er sialI 1:e' ltaI.* ;:; ;,~~"':av for :mn% ..-.. ~ . .

i!Iiog o a lims of an' *:icid alImlmi frism' (it c nn ic -t'C:b:m Ih

! ;z ',."

0 j IL2AL 'i::.'n',4ii~u~i~ 1 ZZ~7I

  • Arktjright-..Ioustoz Manufacturer.,; Mutual Nsrfl;ince (:o~mwiny - Mutil Boiler & Mach1inery Division.

WO# 224489-01 R/R# 06-02-0141 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner CP&L dba Progress Energqy Date 06/12/2006 Name P.O. Box 1551. Raleigh, N.C. 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 224489-01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System Charging System 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No) 1CS-750 disk Unknown Unknown N/A Unknown Unknown Replaced No 1CS-750 disk FlowServe 14332-10 N/A 07350 2006 Replacement No
7. Description of Work: Replaced valve disk
8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operation Pressure 12 Other El Pressure ___psi Test Temp. _ F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet in numbered and the number of sheet is recorded at the top of this form.

Sheet 2 of 2 WO# 224489-01 R/R# 06-02-0141

.: 'FORM NIS-2 (Back).

9. Remarks /9ow7* e.. .

Applicable Manufacturer's'Data Reports'to0be attached'.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A

  • .<.----*,e.,*

_ISI Coordinator Date 6,/ ,0--

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this *,..ji Owner's Report during the period of il=,! tooO, to re.a, , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or nnected with this inspection.

, -- A, ý2 w -Commissions NC 1507. ABIN NS National Board, State, Province, and Endorsements

.1

'I

/

/ FORM N-2 CERTIFICATE HOLDERS' DATA REPORT FOR IDENTICAL

/ NUCLEAR PARTS AND APPURTENANCES*

As Required by the Provisions of the ASME Code,Section III Not to Exceed One Day's Production Pg. 1 of 2

1. Manufactured and certified by Flowserne Corporation/ 1900 South Saunders Street, Raleiih NC 27603 (Name and Address of NPT Certificate Holder)
2. Manufactured for Progress Energv Carolinas, Inc/ PO Box 870 Raleigh,. N.C. 27602 (Name and Address of Purchaser)
3. Location of Installation CP&L CENTRAL RECV & DED FAC /5413 Shearon Harris Rd. Zone 17A, New Hill, N.C. 27562 (Name and Address)
4. Type: SII-D-9957BW16-(I) ASME SA479 N/A N/A 2006 Rev. A (natl. spec. no.) (tensile strength) (CRN) (year btalt)

(drawing no.)

1974 Sumnmer, 1976 1 N/A

5. ASME Code,Section III, Division 1:

(ediion) (addenda date) Idass) (Code Case no.)

N/A Revision N/A Date N/A

6. Fabricated in accordance with Const. Spec. (Div. 2 only) only)

(no.)

7. Remarks: Disk for 1 1/2" & 2" 15001/ Y PATTERN PACK-LESS GLOBE VALVE S.0. 371 69 N/A Min. design thickness (in.) PER#4 Dia. ID (ft & in.) NIA Length overall (ft & in.) N/A
8. Nom. Thickness (in.)
9. When applicable, Certificate Holders' Data Reports are attached for each item of this report:

Part or Appurtenance National Part or Appurtenance National Serial Number Board No. Serial Number Board No.

In Numerical Order In Numerical Order (2) 14332-10 N/A (26)

(27)

(28)

(29)

(5)

(30)

(6) (31)

(7) (32)

(8) (33)

(9) (34)

(10) (35)

(11) (36)

(12) (37)

(13) (38)

(14) (39)

(15) (40)

(16) (41)

(17) (42)

(18) (43)

(19) (44)

(20) (45) .

(21) (46)

(22) (47)

(23) (48)

(24) (49)

(25) (50) psi. lemp. F. Hydro. Test pressure N/A At temp. 'F Design pressure

.Supplemental information in form of lists, sketches or drawings may be used provided (1) size is 8-1/2" x 11'. (2) information in items 2 and 3 on this Data Report is included on each sheet. (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

/

7

/

FORM N-2 (Back-Pg. 2 of 2)

Certificate Holder's Serial Nos. 14332-1 CERTIFICATION OF DESIGN Design specification certified by R.C Rossi P.E. State NC 'Reg. no. 11504 Design Report certified by " P.E. State Reg. no.

CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and that this (these) PARTS Conforms to the rules of construction of the ASME Code,Section III, Division 1.

NPT Certificate of Authorization N1563 Expires 11/26/2006 No.

Date z Name Flowserve, Corporation Signed-,

(NPT C,**ikate HlAder) (a-hmized repesentatie)

CERTIFICATE OF INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB CT of Hartford, Connecticut have inspected these items described in this Data Report on 7- 1 I C-?.- , and state that, to the best of my knowledge and belief, the Certificate Holder has fabricated these parts or appurtenances in accordance with the ASME Code,Section III, Division 1. Each part listed has been authorized for stamping on the date shown above.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the equipment described in this Data Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with thi ion.

Date 2- 1c;:  :'Signed -- .Commissions C / Eo.. at aZ.

X(Authoried Irnpedtor) (Nar 13d.(~id. Endorsements) and state. prv.and n.

12)

6 WO# 307816-01 R/R# 06-02-0145 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS

-  :- As Required by the Provisions of the ASME Code Section XI

1. Owner CP&L dba Proqress Enerqv Date 06/14/2006 Name P.O. Box 1551. Raleilh. N.C. 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 307816-01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill. N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System Fire Protection 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No) 1FP-347 huts Unknown N/A N/A N/A Unknown Replaced No 1FP-347 nuts Dubose National Energy N/A N/A NIA 1992 Replacement No Services 1FP-347 studs Unknown N/A N/A N/A Unknown Replaced No 1FP-347 studs Nova N/A N/A N/A 2000 Replacement No
7. Description of Work: replace studs and nuts
8. Tests Conducted: Hydrostatic E] Pneumatic El Nominal Operating Pressure El Other [] Pressure ___psi Test Temp. _ F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 WO# 307816-01 R/R# 06-02-0145 FORM NIS-2'(Back) "..

K>

9. Remarks.

Applicable Manufacturer's Data Reports Applicable Manufacturer's-

........... po to be to be... att attached.

CERTIFICATION OF COMPLIANCE .

We certify that the statements made in the report are correct and this replacement conforms to the rules of the

"-. . repair or~replacement .

ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A .... .. . -  :- - Expiration Date N/

Signed"! I-ql (nnrr1inntnr Date , '/,*4O6 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut havy ins ected the components described in this U Owner's Report during the period of 9/13/2002 to 4L' ..11 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions NC 1507, ABIN NS Jnslictor's Signature National Board, State, Province, and Endorsements Date A

WO#f 683981-01 R/R# 06-02-0146 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner CP&L dba Progress Energy Date 06/14/2006 Name .
  • - P.O. Box 1551, Raleigh, N.C. 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 683981-01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System CS - Chemical Volume Control 5 (a) Applicable Construction Code ASME Section III 1974 Edition,. Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufaclurer Serial No. Board No. Identification Built Or Replacement (Yes or No)

CS-H-2609 nuts Unknown N/A N/A None Unknown Replaced No CS-H-2609 nuts Coloc Industries N/A N/A None Unknown Replacement No

7. Description of Work: Replace lock nuts
8. Tests Conducted: Hydrostatic El Pneumatic E] Nominal Operating Pressure El Other El Pressure _.psi Test Temp. ____F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 WO# 683981-01 R/R# 06-02-0146 FORM NIS-2 (Back)

9. Remarks .

Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Sign 14 IC1 rn er;nn#^r Date 64 Z, (a Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of !Y/-, V1/d, to A.L _, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

, - F ,,

  • 0Commissions NC 1507, ABIN NS

% "-- lnt., Ks- ignature National Board, State, Province, and Endorsements Date *________

K)

WO# 684258-01 R/R# 06-02-0147 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner CP&L dba Progress Energy Date 06/15/2006

.. . .. Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Sheet 1 of 2 Address

2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 684258-01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New, Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date NIA
4. Identification of System CS - Chemical Volume Control 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

CS-H-2820 nuts Unknown N/A N/A None Unknown Replaced No CS-H-2820 nuts Coloc Industries N/A N/A None Unknown Replacement No

7. Description of Work: Replace lock nuts
8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operating Pressure El Other E] Pressure _ psi Test Temp. °F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of22 WO# 684258-01

. ,......::.:._r;,-:i

,!I:~~~~.... . .... ..........

.. -:.'..........v . : . ,RR

-.. 0-2 14 I n... ". ' .,. R/R# 06-02-0147

. ... -... - FORM NIS-2 (Back) .

9. Remarks ............ ..

Applicable Manufacturer's Data Reports to be attaghed. . .

- "A CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replaerrient &onforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A __"_" Expiration Date N/A Signed

  • 4" . iSI Coordinattor Date 6_/1 -. c20i6 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut haveinspected the components described in this Owner's Report during the period of 4/24/2006 to J/514. , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

______. _______,_Commissions NC 1507, ABIN NS

- spqttor's

, Signature National Board, State, Province, and Endorsements

~%-g

WO# 683983-01

  • d....

R/R# 06-02-0148 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner CP&L dba Prowress Enermy Date 0611512006 Name P.O. Box 1551, Raleiqh, N.C. 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1

-- Name 5413 Shearon Harris Rd.. New Hill, N.C. 27562-0165 WO# 683983-01 Address Repair Organization P.O. No., Job No., etc.

3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd.. New Hill. N.C. 27562-0165 Authorization No. N/A Address .

Expiration Date N/A

4. Identification of System CS - Chemical Volume Control 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

CS-H-1 426 nuts Unknown NIA N/A None Unknown Replaced No CS-H-1426 nuts Coloc Industries N/A N/A 'None Unknown Replacement No

7. Description of Work: Replace lock nuts
8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operating Pressure El Other E] Pressure ___psi Test Temp. QF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 19 WO# 683983-01 R/R# 06-02-0148 FORM NIS-2 (Back)

9. Remarks

. Applicable Manufacturer's Data Reports to be attached.'

CERTIFICATION OF COMPLIANCE.

We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed *- ISI Coordinator Date 4 r ztýý I 49 6 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut havy inspected the components described in this Owner's Report during the period of 4124/2006 to 441.,ng , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

-- (9 Commissions NC 1507, ABIN NS SInsp-tor's _-_* __

Signature National Board, State, Province, and Endorsements DateA

Sa10 I WO# 844649-01 R/R# 06-02-0149 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of tfle ASME Code Section XI

1. Owner CP&L dba Progress Enerqy Date 06/15/2006 Name P.O. BOx 1551, Raleiqh, N.C. 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 844649-01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System BD - Steam Generator Blowdown 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

BD-H-0589 nuts Unknown N/A N/A None Unknown Replaced No BD-H-0589 nuts Coloc Industries N/A N/A None Unknown Replacement No

7. Description of Work: Replace lock nuts
8. Tests Conducted: Hydrostatic E] Pneumatic El Nominal Operating Pressure El Other E] Pressure __psi Test Temp. 2F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

0 Sheet 2 of 2 WO# 844649-01 R/R# 06-02-0149

. " . FORM NIS-2 (Back)..

9. Remarks Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed *

  • ISI Coordinator te_ 6 Z'*,/6-o Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut havq insl0ected the components described in this Owner's Report during the period of 5/2/2006 to j/'t , , and state that to the best of my U

knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

_ 2,_ ___ _ __ _ Commissions NC 1507, ABIN NS

. aJnsp- tor's Signature National Board, State, Province, and Endorsements Date __/___ __

V 1

'> g. WO# 684256-02 R/R# 06-02-0150 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner CP&L dba Proqress EneMy Date 06/15/2006 Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WOf 684256-02 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System CS - Chemical Volume Control 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None__ Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 ,Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

CS-H-3193 nuts Unknown N/A N/A None Unknown Replaced No CS-H-3193 nuts Coloc Industries N/A N/A None Unknown Replacement No

7. Description of Work: Replace lock nuts
8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operating Pressure El Other E] Pressure .. psi Test Temp. -F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 WO# 684256-02 R/R# 06-02-0150 FORM NIS-2 (Back)

9. Remarks

- Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair.or replacement ,

ASME Code,Section XI."

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Sinned v,*;j, IRI r.nnrrlinntnr Date e,),

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut havy inspected the components described in this Owner's Report during the period of 4/26/2006 to &/A3 & , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions NC 1507, ABIN NS SSignature National Board, State, Province, and Endorsements Date &1=1/6.

K-,

b ~'

WO# 417764-02 R/R# 06-02-0152 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.. Owner .CP&L dba Progress Energy -Date 06/16/2006 Name

  • P.O. Box 1551, Raleigh, N.C. 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 417764-02 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress EnergY/y Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System CS - Chemical Volume Control 5 (a) Applicab!e Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989, Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No) 1CS-CSIPC007 Unknown None 64 None Unknown Replaced Yes piping_

1CS-CSIPC;007 Dubose National Energy 187461 N/A 455374 1993 Replacement No Services 1N51e n piping

7. Description of Work: Replace piping on oil cooler
8. Tests Conducted: Hydrostatic El Pneumatic E] Nominal Operating Pressure [

Other E] Pressure ____psi Test Temp. -_F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 WO# 417764-02 R/R# 06-02-0152 FORM NIS-2 (Back)

9. Remarks Code Case N-416-2 used Applicable Manufacturer's Data Reports to be attached:

CERTIFICATION OF COMPLIANCE- -

We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair orsreplacement.. . ..

ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A .... Expiration Date N/A Signed , _ z', Qe- - _. ' ISI Coordinato r Date *,* 51Zm c Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut havpe ipected the components described in this Owner's Report during the period of 2/12/2004 to 20_k.d, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

c7'iM4L,, Commissions NC 1507, ABIN NS IpEtor's Signature National Board, State, Province, and Endorsements Date / A"4

WO# 417768-01 0 R/R# 06-02-0153 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the'ASME Code Section Xl

1. Owner CP&L dba Progress Energy Date 06/16/2006.

-Name

-P.O. Box 1551, Raleigh, N.C. 27602-1551 Sheet 1 of 2 .

Address 2.-Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 417768-01 Address Repair Organization P.O. No., Job No., etc.

3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System CS - Chemical Volume Control 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No) picspinPC:009 Unknown None 64 None Unknown Replaced Yes piping______ _________ __

1CS-CSIPC:009 Dubose National Energy 187461 NIA 455374 1993 Replacement No piping Services 187_61___ 4 419 Rea nt N

7. Description of Work: Replace piping on oil cooler
8. Tests Conducted: Hydrostatic El Pneumatic El Nominal Operating Pressure [

Other [3 Pressure ____psi Test Temp. _ F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

V?

Sheet 2 of 2 WOH 417768-01 R/R# 06-02-0153 FORM NIS-2 (Back)

9. Remarks Code Case N-416-2 used Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A I~l flnnrdin~tnr Date /6/-!ý Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut havensgected the components described in this Owner's Report during the period of 2/16/2004 to * /d , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions NC 1507, ABIN NS

,)nsV:&tor;sSignature National Board, State, Province, and Endorsements Date A0 ,

WO# 683979-01 t*

R/R# 06-02-0172 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner CP&L dba Progress Enerqy Date 06/30/2006 Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WOf* 683979-01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System SW - Service Water 5 (a) Applicable Construction CodeASME Section III 1974 EditionWfnter 1976 Addenda, N6ne Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built -Or Replacement (Yes or No) 1SW-H-178 Progress Energy N/A NIA None 2006 Repaired No 1SW-H-2034 Progress Energy N/A N/A None 2006 Repaired No 1SW-H-2035 Progress Energy N/A N/A None 2006 Repaired No 1SW-H-2038 Progress Energy N/A N/A None 2006 Repaired No
7. Description of Work: Modify supports in accordance with EC 60449
8. Tests Conducted: Hydrostatic Ii Pneumatic E] Nominal Operating Pressure El Other El Pressure . psi Test Temp. -_

F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 0 WO# 683979-01 R/R# 06-02-0172 FORM NIS-2 (Back)

9. Remarks

.Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this repair- coriforms to the'rules of the repair or replacement ASME Code,Section XI. .. .. ..

Type Code Symbol Stamp N/A Certificate of-Authorization No.:N/A .................-.. . .Expiration Date N/A.

Signed ".," -'---t--, 1 ISI Coordinator Date . 1C.c Ownrer or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut havQ irjspected the components described in this Owner's Report during the period of 4/25/2006 to 7/./Z &, , and state that to the best of my Q~ I knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and.corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions NC 1507, ABIN NS

-np~or's Signature National Board, State, Province, and Endorsements Date *,/

0 e WOf# 779141-01 R/R# 06-02-0158 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner CP&L dba Progress Energy Date 06/23/2006 Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd.. New Hill. N.C. 27562-0165 WO# 779141-01 Address * . Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy .. Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd.. New Hill. N.C. 27562!-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System CS - Chemical Volume Control 5 (a)'Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, Nonre Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No) 1CS-752 Unknown Unknown Unknown None Unknown Replaced Yes 1CS-752 Velan 5429 364 None 1981 Replacement Yes
7. Description of Work: Replace valve
8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operating Pressure M Other El Pressure ___psi Test Temp. QF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 WO# 779141-01 R/R# 06-02-0158.-

FORM NIS-2 (Back)

9. Remarks Manufactures data report attached.

Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed *-e-4 . .<e - 11 Coordinator Date 1 00 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National'Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut havq ins cted the components described in this K.-~

Owner's Report during the period of 4/17/2006 to 4/',p 70*g , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

___2 _ _ __Al.

. I Iniectors Signature Commissions NC 1507, ABIN NS National Board, State, Province, and Endorsements Date

WO#f 686993-05 R/R9 06-02-0161 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner CP&L dba Progress Energy
1. Owner CP&L dba Progress Ener-qy Date 06/23/2006 Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Sheet 1 of2 .

... . Address

2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd.. New Hill, N.C. 27562-0165 wo# 686993-05 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System CS - Chemical Volume Control 5 (a) Applicable Construction Code AS ME Section Iii 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired. ASME Code Name of Name of MIrnufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

Lock nut Unknown N/A N/A None Unknown Replaced No Lock nut Coloc N/A NIA None 2001 Replacement No

7. Description of Work: Replace lock nuts
8. Tests Conducted: Hydrostatic E] Pneumatic ii Nominal Operating Pressure Ii Other E] Pressure _psi Test Temp. _ F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

a Sheet 2 of 2 WOU 686993-05 R/R# 06-02-0161 FORM NIS-2 (Back)

9. Remarks Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date NIA Signed -e__

'. SISCoordinator Date X>- z e Owner or Owner's Designee. Title Drdinator CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 9127/2005 to 7/.1 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising fr m or connected with this inspection.

, 117r ,

-spector's Signature Commissions NC 1507, ABIN NS National Board. State, Province, and Endorsements Dale

WO# 686993-01 3 o0- .... RIRff 06-02-0162 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner CP&L dba Proaress Enerav Date 06/23/2006 Name P.O. Box 1551. Raleiah. N.C. 27602-1551 Sheet 1 of 2

. . Address

2. Plant Shearon Harris Nuclear Power Plant Unit 1...

..- Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WOlf 686993-01 Address Repair Organization P.O. No., Job No., etc.

3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill. N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System CS - Chemical Volume Control 5 (a)Applicable Construction CodeASME SectionIlli 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No) 1CS-752 valve Unknown Unknown Unknown N/A Unknown Replaced Yes disc 1CS-752 valve Unknown Unknown Unknown N/A Unknown Replacement Yes disc
7. Description of Work: Replace valve disk
8. Tests Conducted: Hydrostatic El Pneumatic El Nominal Operating Pressure I]

Other [] Pressure . psi Test Temp. °-F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

0 Sheet 2 of 2 WO# 686993-01 R/R# 06-02-0162

'FORM NIS-2(Back)  : '7"

9. Remarks Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A .

Ceirtifiate-of Authorization No. N/A . .... Expiration' Date N/A Signed ISI Coordinator Date .L ,/ Z a/ 6...

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut. have inspected the components described in this Owner's Report during the period of 9/27/2005 to W" , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

,2AU ,,.b Commissions NC 1507, ABIN NS National Board, State, Province, and Endorsements

o v. WO# 736719-01 R/Rff 06-02-0163 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner CP&L dba Proaress Enerav Date 06/2312006 Name .- -

P.O. Box 1551, Raleigh, N.C. 27602-1551 Sheet 1 of2 2 Address

2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 736719-01 Address Repair Organization P.O. No., Job No.,-etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd.. New Hill' N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System CC - Component Cooling Water 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI UJtilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No) 1CC-CCWA Pacific Pump 49865 49273- 72091-AD unknown Replaced No Inboard seat plate PacifimpIGHG 79Uo epd 10C-CCWA*

Inboard seal plate Pacific Pump unavailable D15535 ;72091-15-AO Unknown Replacement No 1CC-CCWA Outboard seal Pacific Pump 49872 49273 72091-12-AL Unknown Replaced No plate ITG41 1CC-CCWA Outboard seal Pacific Pump 49871 49273-rTG4 72091-9-Al Unknown Replacement No plate

7. Description of Work: Replace inboard and outboard seals plates
8. Tests Conducted: Hydrostatic El Pneumatic [I Nominal Operating Pressure [

Other El Pressure psi Test Temp. _ F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 WO# 736719-01 RIR# 06-02-0163 FORM NIS-2 (Back)

9. Remarks Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement coniorms to the rules of the*

repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A _ Expiration Date N/A v

ISI *oordinator Date "-7. //o/v Sinned.

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut havy9 ispected the components described in this Owner's Report during the period of 7/25/2005 to TAI/A , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

61 ,*Commissions NC 1507, ABIN NS J Inspector's Signature National Board, State, Province, and Endorsements Date 7//.& o

WON 680761-01

  • R/Rft 06-02-0170 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
1. Owner CP&L dba Proaress Energy Date 06/27/2006 Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name .

5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO4 680761 -01 Address Repair Organization P.O. No., Job No., etc.

Work Performed By Progress Energy Type Code Symbol Stamp N/A 3.

Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address. .Expiration Date N/A

4. Identification of System CS - Chemical Volume Control 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of"Section Xl Utilized for Repairs or Replacements 1989, Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No) 10S-284 Unknown Unknown Unknown None Unknown Repaired Yes
7. Description of Work: weld repair of seal weld
8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operating Pressure [

Other [] Pressure .psi Test Temp. 917 NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of22 ,

WOl# 680761-01 R/R# 06-02-0170 FORM NIS-2 (Back)

9. Remarks "____ "_"

Applicable Manufacturer's Data Reports to be attached.

-CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this repair conforms to the rules of the*

repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A

  • Certificate of Authorization No. N/A Expiration Date N/A Signed ;S,, -
  • Ie4 I1 Coordinator Date ",. "..,.)

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut haveirspected the components described in this Owner's Report during the period of 4/26/2006 to 7/1/- A I,, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions NC 1507, ABIN NS

-rns-ctor's signature National Board, State, Province, and Endorsements Date 14

a g 0c4 WO# 633285-01 R/R# 66.-0,;Z -0/-7.9' FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner CP&L dba Prooress Enerav Date 07/19/2006 Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Sheet 1 of 2 . . .

Address

2. Plant . Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd.. New Hill. N.C. 27562-0165 WO# 633285-01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System 2060-Chemical and Volume Control 5 (a) Applicable Construction Code ASME Section III1974 Edition. Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Re'placed and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other -. Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

Valve Copes Vulcan Model D-166123 None lCS-7 1980 Replaced Yes Valve Copes Vulcan Model D-166123 None lCS-7 1980 Replacement Yes

7. Description of Work: Replace Valve Trim for Valve Repair
8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operating Pressure M Other E] Pressure .psi Test Temp. OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8t/2 in. X 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

0 Sheet 2 of 2 WO# 633285-01 R/R#

FORM NiS-2 (Back)

9. Remarks Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this repair conforms to the rules of the repair or replacement ASME Code, Section Xl.

Type Code Symbol Star A Certificate o thor tion No1*NA Expiration Date N/A Signed I Coordinator Date 07/19/2006

-Oner or ler's Den e, Title CE"IýTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 4/30106 to 7/7/06 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

_,_ __ ___ ___--__Commissions NC 1507, ABIN NS

( Inspector's Signature National Board, State, Province, and Endorsements Date 0711912006

0 WO# 685088-03 R/R# 06 - 0.2 -0/I?"

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner CP&L dba Progress Energy Date 0711912006 Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Sheet I of 2

- .Address

2. Plant Shearon Harris Nuclear Power Plant Unit .1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 685088-03 Address Repair Organization P.O. No., Job No., etc.

-3. Work Performed By Progress Energy Type Code Symbol Stamp NIA Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. NIA Address Expiration Date N/A

4. Identification of System 3065 - Auxiliary Feedwater 5 (a) Applicable Construction Code ASME Section III 1974 Edition- Summer '76 Add, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced. Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

Hanger Coloc Industries None None 73286296 1980. Replaced No Hanger Coloc Industries None None 73286296 1999 Replacement No

7. Description of Work: Replaced Coloc Nuts on Hanger
8. Tests Conducted: Hydrostatic [] Pneumatic LI Nominal Operating Pressure EL Other E] Pressure .. psi Test Temp. OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

,. * ° Sheet 2 of 2 WO# 685088-03 R/R#

FORM NIS-2 (Back)

9. Remarks Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate olAultiion. N/A Expiration Date N/A Signed-A I _- ISI Coordinator Date 07/1912006

%1 -v "~Owner or'15wner'(lesinee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 4/30/06 to 7/17106 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

__ _ _ _ _ _ _ _ Commissions NC 1507, ABIN NS

, 1 Inspectors Signature National Board, State, Province, and Endorsements Date 07119106

WO# 205083-01 R/R9 6 -0o2 - .VP/CY FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner CP&L dba Progress Enerqy Date 07/22/2006 Name P.O. Box 1551, Raleigh, N.C. 27602-1551 She6t 1:of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 205083-01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date NIA
4. Identification of System 3020- Main Steam 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

Valve ccl None None 1MS-62 1980 Replaced Yes Valve ccl 138165 None None 1998 Replacement No

7. Description of Work: Replaced plug assembly in valve
8. Tests Conducted: Hydrostatic E] Pneumatic El Nominal Operating Pressure [

Other E] Pressure __psi Test Temp. -_

F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 WO# 205083-01 R/R#

J _, "

FORM NIS-2 (Back)

9. Remarks Form N-2attached .

." - '" *" Applicable Manufacturer's Data Reports to be atta6hnd. . .

CERTIFICATION OF COMPLIANCE.

We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol S /A Certificate zution . N/A "__Expiration Date N/A Signee i ,-A (A d ISI Coordinator Date 07/24/2006 I . ... *r'rr7'A ,n r'*f o trif* En TitI.

i - biW~-r~nrsi CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 10/30/04 to 7/22/06 . , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

_-- ____,________-_Commissions NC 1507, ABIN NS J Inspector's Signature National Board, State, Province, and Endorsements Date n7/I94!9flAn

Form N-2 FORM N-2 CERTIFICATE HOLDERS' DATA REPORT FOR IDENTICAL NUCLEAR PARTS AND APPURTENANCES*

As Required by the Provisions of th ASME Code,Section III Not to Exceed One Day's Production Pa. 1 of 2

1. Manufactured and certified by C C I, 22591 Avenida Empresa, Rancho Santa Margarita.CA 92688 (name and address of Certificate Holder)
2. Manufactured for' "CAROLINA POWER & LIGHT COMPANY, P.O. BOX 1551, RALEIGH, NC 27602 (name and address of purchaser)
3. Location of installation CAROLINA POWER & LIGHT. CRDF-H03, STATE RD 1134. NEW HILL NC 27562 (name and address)
4. Type 327100003 SA182-FI1 70.000 PSI N/A 1998 (drawing no.) (matl spec. no.) (tensile strength) (CRN) (year built)
5. ASME Code.Section III, Division 1: 1974 WINTER 1976 2 N/A (edition) (addenda date) (class) (Code Case no.)
6. Fabricated in accordance with Const. Spec. (div. 2 N/A ReA4on N/A Date N/A only)

(no.)

7. Rem-arks FOR ATMOSPHERIC DUMP VALVES' CCI PROJECT 100221. PRODUCTION ORDER 138165
8. Nom. thickness (in.) 2.685" Min. design thickness 2.669' Dia. I D (M9 In.) 2.63' Length overall (ft & 11.1"

_ (n.) in.)

9. When applicable, Certificate Holders! Data Rerports are attached for each item of the this report:

Part or Appurtenance National Pant or Appurtenance National Board No.

Serial Number Board No. Serial Number in Numerical Order in Nurhedcal Order (1.) 138165 N/A (2M.) *I.

(2.) ____________ ___________ (27.)

+

(3.)______ ________ ___________ _ (28.)

+

(4.) ____________ ___________ (29.)

(5.) ____________ ___________ (30.)

(31.)

(32.)

(33.)

(34.)

(35.)

(36.)

(10.) ___________ __________ (37.)

(38.)

(17.) (39.)

(40.)

(41.)

(213.)__________ __ (42.)

(43.)

(25.) (44.)

(16.) (45.)

(17.) (46.)

(47.)

(20.) ____________

(48.)

(49.)

(50.)

10. Design pressure 1185 psi Temp. 600 Deg. F Hydro test pressure N/A at temp. Deg.

I

'Supplemental information in the form of lists. sketches, or drawings may be used provided (1) size is 8 112 x 11. (2) information in hems 1 through 4 on this DataReport is included on each sheet. (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

This form (E00037) may be obtained from the Order Dept.. ASME. 22 Law Drive. Box 2300. Fairfield. NJ 07007-2300.

Form N-Z FORM N-2 (Back - Pg. 2 of 2)

Certifcae Holders Serial No. 138165 Throug 138165 h

CERTIFICATE OF DESIGN Design Specification certified by ALGIRDAS CESNAVICIOS EP.F Slate NC Reg. no. 7549 Design Report

  • certified by N/A P.E. Slate N/A Reg. no. N/A (when applicable)

CERTIFICATE OF COMPUANCE We certify that the statements made in this report are correct and that this (these) PLUG conforms to the rules of construction of the ASME Code. Section 11,Division 1.

NPT Certificate of Authorizaton N-2696 Expires JUNE 7,2003 No. _

Date 0-7"_ b_.. Name CCI Sig (NPT Certificale Holder) Moie prsntative)

CERTIFICATE OF INSPECTION I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of CALIFORNIA and employed by HARTFORD STEAM 8OILER INSPECTION AND INSURANCE COMPANY of HARTFORD. CONNECTICUT have inspected these items described inthis Data Report on 17Z-27. Z" oe , and state that to the best of my knovAedge and belief. the Certificate Holder has fabricated these parts or appurtenances inaccordance wlAl ASME Section I11. Divoin 1. Eacn part listed has been authotiied for stamping on the date shown above.

By signing this certificate. neither the Inspector nor his employer makes waranty.expressed or implied, concerning the equipment described in this Data Report. Futhermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage orJoss of any kind arising from or connected with this inspection.

Date _______4D Signed_________ Commissions__1-?

(Autt~onzeo Inspector) (Nat I 8d. (jrV;-ud&ng encXwsement) ancl state or prov, w4 no.)

WOP 680707-01 R/R# t96 -O 1;t -*

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner CP&L dba Proqress Enerqy Date 07/25/2006 Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WOf11680707.01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System 3010 - Steam Generator Blowdown 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

Pipe Southwest Fab None None 2BD4-7SN-1 1980 Replaced Yes Pipe U.S. Steel None None Heat # B86365 1999 Replacement No Sockolet Bonney Forge None None Heat P468 2000 Replacement No

7. Description of Work: Replace Piping & Sock-o-let
8. Tests Conducted: Hydrostatic E] Pneumatic [] Nominal Operating Pressure [

Other E3 Pressure psi Test Temp. __.__F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/22 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 WO# 680707-01 FORM'NIS-2 (Back)

9. Remarks Code Case N-416-2 Applicable Manufacturer's Data Reports to.be attached. .

CERTIFICATION OF COMPLIANCE '

We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement .

ASME Code,Section XI.

Type Code Symbol St N/A Certificatee r*b/!!.ation . N/A Expiration Date N/A Signed /'"t4-) ISI Coordinator Date 07/25/2006 Owner or Owner's Dsign, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 4/21/06 to 7/25/06 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

, /2.,., Commissions NC 1507, ABIN NS Inspector's Signature National Board, State, Province, and Endorsements Date 07/25/2006

WO# 684264-02 1 R/R# O6-oa; 20 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner CP&L dba Proqress Enerov Date 07/25/2006 Name P.O. Box 1551, Raleigqh, N.C. 27602-1551 Sheet 1 'of 2 Address ---
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 684264-02 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N4.C. 27562-0165 Authorization No. N/A Address Expiration Date NIA
4. Identification of System 3020 - Main Steam 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None . Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

Hanger Daniels Construction MS-H-92 None None 1980 Replaced Yes Stud T&T Enterprises None None Heat Code AQO 2001 Replacement No Lock Nuts Southern Fastners None None None 2004 Replacement No

7. Description of Work: Replace Studs and Nuts after Hanger removal/replacement
8. Tests Conducted: Hydrostatic E] Pneumatic [] Nominal Operating Pressure [

Other E] Pressure psi Test Temp. -IF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 WO# 684264-02 R/R#

FORM NIS-2 (Back)

9. Remarks Applicable Manufacturer's Data Reports to be attached. .  :. . .

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the, repair or replacement ASME Code,Section XI.

Type Code Symbol S N/A.

Certificate ization No !NA Expiration Date N/A Signed IS Coordinator Date 07/25/2006 Owner or Owner's D;sianke. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 7/10/06 to 7/10/06 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

_____ (La,-__ , Commissions NC 1507, ABIN NS J )Kspector's Signature National Board, State, Province, and Endorsements Date (7/25/2006

0 WO# 684264-01 RIR# 60~ -o*33 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner CP&L dba Progress Energy Date 07/26/2006 Name P.O.Box 1551, Raleigh, N.C7 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 684264-01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address.. , ..

Expiration Date N/A

4. Identification of System 3020 - Main Steam 5 (a) Applicable Construction Code ASME Section Ill 1974 Edition - Summer '76 Add, None Code Case, (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 ,Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

Hanger Coloc Industries None None Part# 72614902 1980 Replaced No Hanger Coloc Industries None None 72614902 2001 Replacement No

7. Description of Work: Replaced Coloc Nuts on Hanger
8. Tests Conducted: Hydrostatic [] Pneumatic E] Nominal Operating Pressure El Other E] Pressure _psi Test Temp. ____F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

a Sheet 2 of 2 WO# 684264-01 R/R#

FORM NIS-2-(Bac'k)

C.

9. Remarks Applicable Manufacturer's Data Reports to be :attached.

.

  • i .
  • C.:

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol St N/IA Certificate o4 Aut rization o. N/A '" Expiration Date N/A Sianed IAVe, t, ISI Coordinator Date 07/26/2006 Own~er or Owne D9nee. Title Owner'*D*gnee, Title

  • f * -- O*er or CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 4/25/06 to 7/10/06 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions NC 1507, ABIN NS

( ,/ Inspector's Signature National Board, State, Province, and Endorsements Date 07126/2006

f WO# 629850-01

.,.: R /R# 0 4 -OP, -O -A,4 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner CP&L dba Prociress Energy Date 07/27/2006 Name 7 P.O. Box 1551, Raleigh, N.C. 27602-1551 Sheet I 'of 2

.. . Address

2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 629850-01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd.. New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System 2085 - Low Head Safety Injection 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

Valve Crosby N56904-00-0056 None 1RH-7 1980 Replaced Yes Valve Plug Alloy Stainless lit Code EVR None Part# 72519832 1989 Replacement No Stud Nova None None HI.# 229801 1999 Replacement No Stud Guyon Alloys None None Ht# A19234 1986 Replacement No Heavy Hex Nut Nova None None Ht# G3967 2005 Replacement No Heavy Hex Nut Texas Bolt None None Ht# 852348 1990 Replacement No

7. Description of Work: Valve plug was replaced along with new studs and nuts
8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operating Pressure [

Other E] Pressure ___psi Test Temp. OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 WO# 629850-01 FORM NIS-2 (Back)* -

... plicable Manufacturers Data Reports tobe...

9. Remarks Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code, Section Xl.

Type Code Symbol Stamp N/A Certificate o AuLI orriz~ioa"n No. N/A Expiration Date N/A K .A ISI Coordinator Date 07127/2006 Sinned V Owner or Owner'_Djignee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of -4/26/06 to 7/27/06, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

, d.,I Commissions NC 1507, ABIN NS J t/ Inspector's Signature National Board, State, Province, and Endorsements Date 07127/2006

WOlf 462413-01 R/R# ..-..-...- 3, FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner CP&L dba Progress Energy Date 05/18/2006

.... Name P.O. Box 1551, Raleigh. N.C. 27602-1551 Sheet 1 of 2

. Address

.2. .Plant Shearon Harris Nuclear Power Plant . - Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 " WO# 462413-01 Address Repair Organization P.O. No., Job No., etc.

3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon'Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address.

Expiration Date N/A

4. Identification of.System Containment Spray 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

Studs Unknown None None lCT-71 body to bonnet Unknown Replaced No

___"_studs Studs Dubose Natl Energy None None 1CT-71 body to bonnet 1992 Replacement No Services studs Nuts Unknown None None 1CT-71 body to bonnet Unknown Replaced No nuts Nuts Southern Fasteners & None None 1CT-71 body to bonnet 2001 Replacement No Supply Inc nuts

7. Description of Work: replacement of body to bonnet studs and nuts
8. Tests Conducted: Hydrostatic El Pneumatic El Nominal Operation PressureX Other E] Pressure ____psi Test Temp. -_

F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet in numbered and the number of sheet is recorded at the top of this form.

4. .  :

Sheet 2 of 2 WO# 462413-01 R/R# 03-02-0033 FORM NIS-2 (Back)

9. Remarks Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conformS to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A .

Certificate of Authorization No. N/A Expiration Date N/A Signed * ,,4 , .IRIr .. .rdina.

tor Date-Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut haye in pected the components described in this Owner's Report during the period of 1/25/2006 to 0 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

,Zý , (20* Commissions NC 1507, ABIN NS

-Insp r, Signature National Board, State, Province, and Endorsements Date_______

9 WO# 692515-01 R/R#06-O01-0239

?C FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner CP&L dba Proaress Enerav Date 07128/2006 Name P.O. Box 1551. Raleiah. N.C 27602-1551 Sheet I of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 "I Name 5413 Shearon Harris Rd.. New Hill. N.C. 27562-01 65 WO# 692515-01 Address Repair Organization P.O. No., Job No.. etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A .
4. Identification of System 2005 - Reactor Coolant 5 (a) Applicable Construction Code ASME Section III 1977 Edition, Summer'78 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Buill Or Replacement (Yes or No)

Snubber Pacific Scientific 17482 None None 1981 Replaced -. Yes Snubber .Pacific Scientific 18626 None None 1983 Replacement Yes'

7. Description of Work: Replaced Snubber with Pre-tested Replacement Snubber
8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operating Pressure E]

Other [D Pressure __ psi Test Temp. OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 WO# 692515-01

. . I C, R/R# 06-01-0239 FORM NIS-2 (Back)

9. Remarks 'Code Case 1644-7; NF-1 attached Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to ihe rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed orwne'sesin-ee,,T ISI Cnordin~ tor Date 07/31(2006 Owner or Owner's Designee. Title ISI Coordina CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 7/28106 to 7/28/06 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section X1.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

4 Commissions NC 1507, ABIN NS Inspector's Signature S National Board, State, Province, and Endorsements Date 071-1112 1718

IILo WOlf 567698-01 R/R# 06-02-0287 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner CP&L dba Proaress Eneray Date 08/03/2006 Name P.O. Box 1551, Raleigh, N.C; 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd.. New Hill. N.C. 27562-0165 WO# 567698-01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System MS - Main Steam 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

Valve plug Control Components Unknown None 1MS-60 Unknown Replaced No Valve plug ccl 600220 None 1MS-60 2005 Replacement No

7. Description of Work: Replace Valve Plug
8. Tests Conducted: Hydrostatic E] Pneumatic rl Nominal Operating Pressure El Other F] Pressure _psi Test Temp. _____F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 WO# 567698-01 R/R# 06-02-0287

._FORM NIS-2 (Back)..

K.~-

9. Remarks I Applicable Manufacturer's Data Reports to be attach6d.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A I__ ._I_

. Expiration Date N/A.

IRI ronndinator Date 08/03/2006 Sinned Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, theundersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and KI Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 4/14/2006 to ______/_ _ _ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

t Commissions NC 1507, ABIN NS a-- Inspector's Signature National Board, State, Province, and Endorsements Date g1*/i.

Form N-2 FORM N-2 CERTIFICATE HOLDERS' DATA REPORT FOR IDENTICAL NUCLEAR PARTS AND APPURTENANCES*

As Required by the Provisions of th ASME Code,Section III

........... Not to Exceed One Day's Production . Pa. I of 2

1. Manufactured and certified by C C 1.22591 Avenida Empresa, Rancho Santa Margarita, CA 92688

- . (name and address of Certificate Holder)

2. Manufactured for CAROLINA POWER &LIGHT COMPANY, P.O. BOX 1551, RALEIGH, NC 27602 ..

(name and address of purchaser)

3. Location of installation CAROLINA POWER &LIGHT. CRDF.H03.STATE RD 1134. NEW HILL, NC 27562

. (name and address) 4.Type 327100003 SA182-Fll 70.000 PSI N/A 2005 (drawing no.) (mat'l spec. no.) (tensile strength) (CRN) (year built)

5. ASME Code. SectionIll. Division!: 1974 WINTER 1976 2 N/A (edition) (addenda date) (class) (Code Case no.)
6. Fabricated In accordance with ConsL Spec. (div. 2 N/A Revision NIA Date N/A only)

(no.)

7. Remarks '"FOR ATMOSPHERIC DUMP VALVES CCI PROJECT 108135. SFC 600220,
8. Nom. thickness 2.685' Min. design thickness 2.669' Dia. ID (ft & tn.) 2.63* Length overall (ft & 11.1" (in.J _ _,-__-_-(in.) in.)
9. When applicable. Certificate Holders' Data Rerports are attached for each item of the this report:

Part or Appurtenance National Part or Appurtenance National Serial Number Board No.' Serial Number Board No.

In Numerical Order in Numerical Order (1.) 600220 N/A (26.)

(2.) (27.).

(3.) (28.)

(4.) (29.)

(5.) (30.)

(6.) (31.)

(7.) (32.)

(8.) (33.)

(9.) (34.)

(10.) (35.)

~1 (11.) m (36.)

(12.) (37.)

~1 (13.) ~1 (38.)

(14.) (39.)

(15.) (40.)

(16.) (41.)

(17.) (42.)

(18.) ~1-(43.)

(19.) .9 (44.)

1~

(20.) II9 (45.)

(21.) .9-(46.)

(22.) (47.)

(23.)

(24.)

(25.)

___________________________ J._______________ (48.)

(49.)

(50.)

. i

10. Design pressure 1185 psi Temp. 600 Deg. F Hydro test pressure NIA at temp. Deg.

f

'Supplemental information in the form of lists. sketches, or drawings may be used provided (1) size is 8 12 x 11. (2) information in items I through 4 on this OataReport Isincluded on each sheet. (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

This fcrm (E00037) may be obtained from the Order Dept.. ASME. 22 Low Drive. Box 2300. Fairfeld. NJ 07007-2300.

Form N'J2 FORM N-2(Back-Pg. 2 of 2)' ..-. - .

Certificate Holder's Serial No. 600220 Through 600220 CERTIFICATE OF DESIGN. -.

Design Specification certified by ALGIRDAS CESNAVICIOS P.E. State iNC: Reg. no. 7549 Design Report' certified by NIA .. P.E. Stale N/A Reg. no. NIA

. .(when applicable)

CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and that this (these) PLUG conforms to the rules of construction of the ASME Code,Section III, Division 1.

NPT Certificate of Authorization N-2696 Expires AUGUST 14, 2006 No.

Date "N Name CC I Signed (NPT Certificate Holder) C ((Auorized represetative)

CERTIFICATE OF INSPECTION I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of CALIFORNIA and employed by HSBICT of HARTFORD, CONNECTICUT have inspected these items described in this Data Report on _A/'1 t4 Z, c/_ i-I Z g,. ; , and state that to the best of my knowledge and belief, the Certificate Holder has fabricated these parts orappurtenances in accordance with ASME Section Ill. DivIsfon 1.

Each part listed has been authorized for stamping on the date shown above.

By signing this certificate, neither the inspector nor his employer makes warranty, expressed or Implied, conceming the equipment described in this Data Report. Futhermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or ss of any kind arsing from or connected with this inspection.

Date -3/ 7-Z t; Signed Cmmissions /Zt-&14 i4.

(Auftorize-d Inspector)- (Nat I Bd. Cincluding endorsemenQ and state or prov.. and no.)

4 WO# 224491-03 R/R# 06-02-0290 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. -Owner *CP&L dba Progress Energy Date 08/03/2006 Name P.O. Box 1551, Raleigh, I.;. 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit I -

Name 5413 Shearon Harris Rd.,New Hill, N.C. 27562-0165 WO# 224491-03 Address Repair Organization P.O. No., Job No., etc.

3. Work Performed By Progress Energy, Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A*.

Address Expiration Date N/A

4. Identification of System CS - Chemical Volume Control 5 (a) Applicable Construction Code ASME Section 1111974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section- XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

Valve . Unknown Unknown Unknown 1CS-749 Unknown Replaced Yes Valve Kerotest NU-1 1-24 13926 1CS-749 1977 Replacement yes

7. Description of Work: Replace valve
8. Tests Conducted: Hydrostatic E] Pneumatic El Nominal Operating Pressure [

Other E] Pressure _ psi Test Temp. _ F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/22 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 WO# 224491-03 R/R# 06-02-0290 FORM NIS-2 (Back)

9. Remarks NPV-1 form attached i cdlcI- fae A 14/16-2 4/

Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed  ! eeen., ISI Coordinator Date 08/03/2006 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have, inspected the components described in this Owner's Report during the period of 4/23/2006 to ,*/)/ -, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

, f,. ý Commissions NC 1507, ABIN NS

"/ Inspector's Signature National Board, State, Province, and Endorsements Date___ _____

. Sho 1 of 2 i**?'.:.*'!*~Ma M*u*mc * *rt.3 lnfeui, -. Corp. Pit tsburgh; P*

". .T A7c ,  ?;nut-,u,Cr) ..

%f .

'1*:'..'* 2. Mc,-r ,ctured (or Dur Power Gop*.i f-sr(Ne amn,',e,.?- of fruith*vr c. Owner)

  • ..-.. 'o*"n :* f I*:ot*'*, Caawb.-"uc~~rPo-wer' Stati ont..... Newp.,-ort SC (Namn' *-i A~ddrexa

~(inch?

-mp or V.-Ove. .. rnin3l In:et Sizc -Cuio site

"( ,," "No.. (0 Fdnuf ,'z' (c) Candin

'S* .6 No. Snrizl ne.istrftien (d) Drawing (0f Nzt*f. (tl} Yet-r yr No. No. No. (a) C!afm Dd. No. Built

*' *I Globe

-___3Globe .,!.5 NU

  • Q- _-_ ."  ! __-D--CA-D-Q -( * . .0_!__lm 3_,QL9__08__ _1922_, 9 _.

' ?.../kD

..(4) "Globe Jbi* CO9+++

____94_ .(j)__ i 1J39) 1___19i7_ '2aL (0; Giobm Y_'n.. ~---

t. ___/L_._ A*_D_- .~9O.21Li____.._1_,j.j____?.*7 Gl~ob*Z PIZ I

"- e

  • A .h * !-.. _:... _ l~,___*LD.9q 4__

_q.-..

=*. __.1_ 2 3*_.9 _,_6____..__

,5.__9.72.__

-' tic; G. ,1._*.. . ilil.=:.c~.. L.__....____!

'/ ^,___________ _--. __,7 - 0 L= _- j ____I. _.__.'. . .3.2 (5ri3f d2*¢Hpti.n vf servce for which.equipmc-rt wa8 dcsi*e*rv)

""G."e ._z.-.--- r- p _ _650 F or Velve Prossure Clas s-I '

<~~~ ~~ S..(:.

um)

(e.rn~p ¢tca-.r ) . .

__ 3. P:.r*urc Pc:£trmrnq PiC,.C

.Azrk N10. ylm'riai scic. No. Mcnufacturer Remarks

('hi _ _ _ _ _ _ _ _ _ _ _ t _ __ _ -- _ _ _ _ _ _ _ _ _

Lj" 7= L-k r-. )

-1 Fo

.m_ -. -- 4IQN JP-- L .'. . .

yoe__-

1oy-ord o

-. f'is

( for._ Sop __;-,-(SU*""[Fra."d_ o_______ 7.*_L_~~e*_

-_*i-itomr 1.___ _

2___ _*..-__*_....

2________ 5____

on________

thsdtn

.I___.___-_.__._

qc! sicldd-)ncc set 1.i nd()echset sn m erdad u brofs _

(I) For menuoIf., operated valves only.

I O*.-j

'"-* " S~~upp'cmnnt.1- *h,,et* in form o' lNat.'. :ctchcs ,.r ctrn~ving.' may be uzed providod (1) .,sze Is 8-1/2" x 11'. (2) information in O"

.: item.';~1, 2 *nd 5 on this (de;t. r*.';o. i'sicluded or each sheat, and (3} each shaet is numberod and number of a~'et*

'

  • 13Iroc'**red ot top ci this form.

.4 i./**.;zZ*:T$  ;*`***tp**?i.. *..... . .. *f*l *. * +.** . *  :

r..'.:*-,+:*3,**..*;*

t*++*pmL,,,......."". .:..*.::.:,:.*::*.*':,', *'**+**`` .-N~:*:+``9:*f*W

  • 5:.;"*i~r.``*:-"4 .4'. . 4'*4

F*', v. n-' l.e. -'.4 i . Io

-- --------- T U~~~~ N o.-c-N0 lm~k FO'" NN141119:

- st

-}O~*r j - i cua~ue ~ r~

-isf- __________ ________

dinnt __

p-972) _ I s____

A_________-C(7y . .

i . =E','FICATE OF COM4PLIANCE V,'2;ecert:iN! that the "consr.'=C9n Of the A Cede <ME _,;c'e-ntisrp.t**crc royer Plnt .d that this Pump. 0r .valve, entmnsrd Components. Section_.

conforms I.. Edition _. to 'the 4 erules of

7~~C l _,

.. '=:* ,: I j,.b 0uS h L I expre3 10/28/77 I

,.)  ! Ml*'

I~~~~N) ~ le

. zI F A rl, aN oF DECSIGN Deign t:t Ic PE ; nc{6tCor R* byt -AA 3:7"'v *!s5 rep,: fciass 1 only) c., file c" Ker-otest Manufacturing Corp..

WIb te scmeredb in aesifn r- Fthatsayet, cfomstohereso "ia cFE e .'C thReg.

znzlysfs czsified o (1,c dSt-esz t-:c. 4 GD o V .

i saII i,t SECOTION III 3,  ?.nSiyntureiot equiiecLst npr ,nase only.

-- CEERTIFICATE OF SPOP INSPE-CTION'-

1,--c!n Ibhetheundersigrivd, intnOr ho'ding s s*! ,,'ania a vatid commission issued by the Nationai The and Board ofbyBoiler znd etp'oye'. Hartford Steam Pressure Vessel 1oile Inspectors M Cb ll}-artford,, Connecticut h... inspecTed the pumr.p, or valve, described in this Data Repori on e runot . 19-77 zn stale tht to the best c! my knowledge and belif, the Manufacturer has con-stvled this pump, or vahve, in accoidance with the ASME Code. Section IlL.

ay signing this certificae, ;.either the Inspector nor his employer makes any warrznty, expressed or implied, concerning V the equipment described in this Data Repcrt. Furthermore. neither the Inspector nor his employer shall be liable in any

\i 6 mnanner for any personal i."uy or prca*-,,, dainzae or a loss of any kind arising from or connected with this inspection.

F~e ruary 2j ,L I.-'-.--- -Pd.4 S.-- I,.* .o*.

I,{I*,#prcto,)

/

Commi-..ions '\ -___ __

't kd.. Stal., Prov. and No.1 Ill~~N

7.

~SUP? U-1 -UT SHEV'

-- IV-1

._C~ __Pi2t, , PA ( J 62699) ti ... zt -uredny,.

,i u--actu-inj L

Compiny 2.

2 nn.ifacturcd for Diuike Power Caot' lRoard

,.nu I'actu rers' DNawn

':;M~

"No.

(2) CA-D-99g9-(1) .

  • a '-.+-.-.,.. 13,.923__

. A-D-99O9*-(.) i -

"O 2)mi -;-_.

  • ii~i.3) ~4:;j' ~ CA -D.9CK)i

.. 3,923

("U' - ---.

2

U' 3-ig (14 ,
-I--<: '-- -1 ) 1

-- GA-DQO~-~.

213,924

-_____ _ _ 3,927-

": ""(sc)+ i )1 " +-.+" ' Cv,-D-g99,9-,1 __

_ -_ -~. -. ,.,

.. -~1*,925 ..2)

) __ ____ ___

(..2.  : A,-e<e-

~-

__ __ _ ____ ____13,926

.1 , 2

- .7 V

, .o, v,.

""

  • 8) ',+U-++v".'u ., "

SECTION Ilk<,

a WOl#684262-01 R/R# 06-02-0291 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner CP&L dba Prociress Enerciv Date 0810312006 Name P.O. Box 1551. Raleiah. N.C. 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO9 684262-01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System 3010- Steam Generator Blowdown 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989-, Adderida'N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

Stud Nova None None Heat# 224939 1995 Replacement No Nut Coloc Ind. None None Heat Code 2H568 2005 Replacement No

7. Description of Work: Removed Hanger and replaced studs and nuts
8. Tests Conducted: Hydrostatic E3 Pneumatic E] Nominal Operating Pressure El Other E] Pressure __.psi Test Temp. ___-F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 WO# 684262-01 R/R# 06-02-0291

.*.. - * . FORM NIS-2 (Back)- .. . .

9. Remarks..........-" "-

Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in'the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed /-.1,----0Mý I* - nnrdin:tnr Date 08/03/2006 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 4/12/06 to 8/3/06 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

o, Commissions NC 1507, ABIN NS SIn:spector's Signature National Board, State, Province, and Endorsements Date 08/03/2006

.:WO# 684263-01 RIR# O06-ot-O2-9A FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner -CP&L dba Proqress Eneri'V Date 08/03/2006 Name P.O. Box 1551. Raleiqh, N.C. 27602-1551 Sheet 1 of 2 Address. . .
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 684263-01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System 3010 - Steam Generator Blowdown 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or. Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component' Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

Hanger Bergen-Paterson None None 1-BD-H-00208 1980 Replaced No Stud Nova None None Heat# 224939 1995 Replacement No Nut Coloc Ind. None None Heat Code 2H568 2005 Replacement No

7. Description of Work: Removed Hanger and replaced studs and nuts
8. Tests Conducted: Hydrostatic El Pneumatic El Nominal Operating Pressure E]

Other E] Pressure psi Test Temp. OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/22 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2

.WO# 684263-01 R/R#

FORM NIS-2 (Back)

9. Remarks Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION.OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed , ISI Coordinator Date 08/03/2006 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 4/12/06 to 8/3/06_, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions NC 1507, ABIN NS sSignature. National.Board, State, Province, and Endorsements Date 08/031/2006

WO# 853779-02 R/R#06-02-0293 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner CP&L dba Progress Energy Date 08/04/2006 Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Sheet 1 of 2 Address
2. Plant Shearon Harris Nuclear Power Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 853779-02 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By Progress Energy Type Code Symbol Stamp N/A Name -- - .

5413 Shearon Harris Rd. New Hill. N.C. 27562-0165 Authorization No. N/A Address Expiration Date N/A

4. Identification of System BD - Steam Generator Blowdown 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

Snubber Pacific Scientific 37188 N/A BD-H-529 1980 Repaired Yes

7. Description of Work: Snubbers's 'L' dimension was reset. This work required the removal and subsequent rewelding of the telescoping tube fillet weld.
8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operating Pressure El Other El Pressure __ _psi Test Temp. __F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

9 Sheet 2 of 2

.R/R# 06-02-0293

. , M...-N , (Back)

- *... .. ..... .. FORM NIS-2 (Back)' '-'.*-.-. *!:

9. Remarks..........

Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE-We certify that the statements made in the report are correct and this .- repair conforms to the rules of the repair or replacement ASME Code, Section X1.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed *2ee--*4'.--------,.---L ISI Coordinator Date C, Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 5/8/2006 to 0711 4 ., and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

It 1 & Commissions NC 1507, ABIN NS J Inspector's Signature National Board, State, Province, and Endorsements Dn~t

9 WO# 853779-01 R/R# 06-02-0294 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1. Owner CP&L dba Proaress Eneray Date 08/04/2006

. .Name P.O. Box 1551. Raleiah. N.C. 27602-1551 Sheet 1 of 2

.. Address

2. Plant Shearon Harris Nuclear Power.Plant Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 WO# 853779-01 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed By 'Progress Energy Type Code Symbol Stamp N/A Name
  • 5413 Shearon Harris Rd.. New Hill. N:C. 27562-0165 Authorization No. N/A Address Expiration Date N/A
4. Identification of System BD - Steam Generator Blowdown 5 (a) Applicable Construction Code ASME Section I 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 , Addenda N/A
6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board No. Identification Built Or Replacement (Yes or No)

Snubber PSA Unknown N/A BD-H-196 1980 Repaired Yes

7. Description of Work: Snubbers's 'L' dimension was reset. This work required the removal and subsequent rewelding of the telescoping tube fillet weld.
8. Tests Conducted: Hydrostatic El Pneumatic E] Nominal Operating Pressure E]

Other E] Pressure __ psi Test Temp. _ F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Sheet 2 of 2 WO# 853779-01 R/R# 06-02-0294 FORM NIS-2 (Back)

9. Remarks Applicable Manufacturer's Data Reports to be attached.

CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this repair conforms to the rules of the repair or replacement ASME Code,Section XI.

Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed - II.,'.Coordinator I51 Date ,..,.. -7)(,

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have irspected the components described in this Owner's Report during the period of 5/8/2006 to S -, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

ti Commissions NC 1507, ABIN NS Inspectors Signature National Board, State, Province, and Endorsements Date K~