HNP-06-081, Submittal of Inservice Inspection Summary Report for Harris Nuclear Plant
| ML062300078 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 08/10/2006 |
| From: | Corlett D Carolina Power & Light Co, Progress Energy Carolinas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| HNP-06-081 | |
| Download: ML062300078 (122) | |
Text
jProgress Energy AUG 1 0 2006 Serial: HNP-06-081 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 Shearon Harris Nuclear Power Plant, Unit No. 1 Docket No. 50-400/License No. NPF-63 90-Day Inservice Inspection (ISI) Summary Report Ladies and Gentlemen:
In accordance with the Code of Federal Regulations, Title 10, Part 50.55a, Carolina Power and Light Company (CP&L) doing business as Progress Energy Carolinas, Inc., submits the attached Inservice Inspection (ISI) Summary Report for the Harris Nuclear Plant (HNP). This report has been prepared in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, 1989 Edition,Section XI, Article IWA-6220(c). This report includes the inspections performed at HNP during Cycle 13 operations and Refueling Outage No.
13 (RFO-13) of the second 10-year ISI interval.
This document contains no new regulatory commitments.
Please refer any question regarding this submittal to me at (919) 362-3137.
Sincerely, D. H. Corlett Supervisor - Licensing/Regulatory Programs Harris Nuclear Plant DHC/jpy Attachment Progress Energy Carolinas, Inc.
Harris Nuclear Plant P. 0. Box 165 New Hill, NC 27562
HNP-06-081 Page 2 C:
Mr. R. A. Musser, NRC Senior Resident Inspector Mr. C. P. Patel, NRC Project Manager Dr. W. D. Travers, NRC Regional Administrator Mr. J. M. Givens, Jr., NC Department of Labor, Boiler Safety Bureau
Attachment for Serial: HNP-06-081 CAROLINA POWER AND LIGHT COMPANY dba PROGRESS ENERGY CAROLINAS, Inc.
SHEARON HARRIS NUCLEAR POWER PLANT Unit One Inservice Inspection (ISI)
Summary Report For RFO-13 Carolina Power and Light PO Box 1551 Raleigh, NC 27602-1551 Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 Date of Commercial Service May 2, 1987 Document Completion Date August 8, 2006
Attachment for Serial: HNP-06-081 INDEX S U M M A RY....................................................................................................
Section 1 NIS-1 FORM, OWNER'S REPORT FOR INSERVICE INSPECTIONS......... Section 2 WELD EXAMINATION RESULTS.................................................................
Section 3 COMPONENT SUPPORTS..........................................................................
Section 4 NIS-2 FORMS, REPORT OF REPAIRS AND REPLACEMENTS................. Section 5
Attachment for Serial: HNP-06-081 SECTION 1 (7 Pages)
SUMMARY
Attachment for Serial: HNP-06-081
SUMMARY
The Shearon Harris Nuclear Power Plant, Unit 1, Ten-Year Inservice Inspection (ISI)
Plan was developed to comply With 1 0CFR50.55a(g), which implements, by reference, the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 1989 Edition with no Addenda.
The following summary report is being submitted pursuant to the reporting requirements of ASME Section XI, Subarticle IWA-6220(c).
This summary report contains the results of the Inservice Inspection (ISI) examinations performed on selected Class I and 2 pressure retaining components and their supports at Harris Nuclear Plant (HNP) from November 17, 2004 to May 16, 2006. The Refueling Outage No. 13 (RFO-1 3) examinations were performed during the third period in the second inspection interval. The typical designation is 2-3-13, (second interval, third period, thirteenth refueling outage). RFO-13 is the second outage of the third inspection period and the final outage of the second interval.
The components selected for examination were from the HNP ISI Program Plan and consisted of piping welds, vessel welds, component welds, component supports, and integral attachments.
ASME Section X1 examinations were completed as scheduled in the HNP ISI Program Plan. The minimum and maximum percentage requirements for examinations completed meet the requirements of ASME Section XI, Tables IWB-2412-1 and IWC-2412-1.
NDE of Welds Summary Nondestructive examinations were performed using Eddy Current (ET), Magnetic Particle (MT), Liquid Penetrant (PT), Ultrasonic (UT), and Visual (V-T) techniques.
Performance Demonstration Initiative (PDI) ultrasonic techniques were utilized where required. The results of the examinations were satisfactory with no rejectable indications noted. Indications identified during examinations were evaluated and documented as applicable on each weld examination data report. Code Case N-460 was invoked where the examination achieved greater than 90% coverage, but less than 100% code coverage. Those welds achieving greater than 90% coverage are considered complete. Weld examinations are summarized in Section 3 of this report.
Attachment for Serial: HNP-06-081 NDE of Welds Summary (continued)
Automated UT, ET, and VT examinations of the reactor vessel welds were performed in accordance with ASME Section XI, 1995 Edition, 1996 Addenda, Appendix VIII as modified by 10 CFR 50.55a. The results of the examinations performed were satisfactory with no rejectable indications noted. Indications identified during examinations were evaluated and documented as applicable on each weld examination data report. In conjunction with the reactor examination, the reactor vessel nozzle-to-pipe dissimilar metal welds were examined using both UT and ET techniques. The dissimilar metal welds were examined with demonstrated techniques, and the results of the examinations were satisfactory with no indications detected.
During RFO-1 3, the reactor vessel head penetrations were examined to satisfy the requirements in Section IV.C.(5)(b) of the First Revised NRC Order EA-03-009 dated February 20, 2004 and to provide a baseline for future examinations. The examinations were conducted in accordance with written procedures and techniques that were demonstrated through the Electric Power Research Institute (EPRI)
Technical Report (TR) 1007831, Materials Reliability Program: Demonstrations of Vendor Equipment and Procedures for the Inspection of Control Rod Drive Mechanism Head Penetrations (MRP-89) dated September 2003, and Westinghouse internal programs. The volume of the sixty-five penetration nozzles were examined using UT and ET techniques, the interference zone was inspected with 00 UT techniques to assess whether flaws were present. In addition, the ID surface was examined with a supplemental ET technique. The reactor vessel head vent line and the associated J-groove weld were examined using ET techniques. No evidence of primary water stress corrosion cracking (PWSCC) was identified by these examinations. The results of these examinations have been submitted with HNP's 60-day report (HNP-06-080) dated July 14, 2006.
Bare metal visual (BMV) examinations of all dissimilar metal piping butt welds were completed as identified in the EPRI TR 1010087, Materials Reliability Program:
Primary System Piping Butt Weld Inspection and Evaluation Guidelines (MRP-139) dated August 2005. The locations of the BMV examinations included the six Inconel 82/182 piping welds associated with the pressurizer and the six Inconel 82/182 reactor vessel nozzle-to-pipe welds. These examinations revealed no evidence of boric acid leakage.
BMV examinations of the bottom mounted instrumentation (BMI) of the reactor vessel lower head were performed in RFO-13. Similar examinations were performed during previous refueling outages in accordance with NRC Bulletin 2003-02. Again, no relevant conditions indicative of boric acid leakage were found.
Attachment for Serial: HNP-06-081 NDE of Welds Summary (continued)
Personnel performing the ISI examinations used isometric drawings in conjunction with tagged valves, component supports, points of connection, vessels, wall or floor penetrations, and floor elevations to locate and identify components subject to examination. Permanent component identification reference points were established and marked on the component in accordance with ASME Section XI, Article 111-4000 during Preservice Inspection (PSI). The NDE examination reports, personnel certifications, examination equipment, NDE procedures, calibration standards and the ISI isometrics are listed in the RFO-13 Outage Examination Results Report.
This report is on file and available at the plant site for review upon request.
Component Support and Snubber Examination Summary ASME Section XI component support examinations were completed as scheduled in the HNP ISI Program Plan for outage 2-3-13 (RFO-13). ASME Section X1 component support exams are complete as scheduled for the current ISI interval.
Examination results were satisfactory except for one pipe support. This support was found with an excessive gap between the pipe clamp and the integrally-welded attached pipe lug. The design called for a 1/16" gap, but the as-found gap was approximately 1/8" to 1/4". Engineering evaluated this condition and determined that the support would still perform its required function. This condition was documented in the corrective action program. The condition was not a result of in-service wear, and the gap was corrected by installing a shim plate.
In RFO-13, the Technical Specifications (TS) Augmented Snubber Examination and Testing program included visual examination of 282 snubbers. Four visual examination failures were observed on the Steam Generator (SG) Blowdown system.
Specifically, two snubbers located on the "C" SG normal blowdown path were observed with inadequate settings for their design thermal movement. Engineering evaluated the "as-found" condition and determined that the supports would still perform their required functions because the potential reduction in movement would be limited to approximately 1/32" and would not result in adverse pipe stresses. This condition was corrected by resetting these snubbers to ensure adequate design thermal movement. No other snubbers were found with this condition on the affected pipe. The other two visual examination failures involved two hydraulic SG snubbers, which were observed with low fluid level. The source of the fluid loss was corrected, and the fluid was restored to normal level. In addition to the observations above, two snubbers were found with arc strikes. These snubbers were removed, functionally tested, and found to meet their acceptance criteria. The visual examinations were performed in accordance with the 10-year snubber examination interval described in ASME Operation and Maintenance (OM) Code Case OMN-13, as implemented by applicable plant procedures.
Attachment for Serial: HNP-06-081 Component Support and Snubber Examination Summary (continued)
RFO-1 3 snubber testing activities included functional testing of 37 mechanical snubbers and five large bore hydraulic snubbers in the representative sample plans, and hand-stroke testing of 23 mechanical snubbers in the harsh environment test group. Testing results for the mechanical snubbers in the representative 37 sample plan resulted in two functional test failures. All five hydraulic snubber functional test results were satisfactory. All 23 harsh environment snubbers were observed to stroke freely, so the hand-stroke test results were satisfactory.
The following details are provided for the results of the two functional test failures.
One mechanical snubber failed to properly activate due to a manufacturing defect.
However, the snubber exhibited a smooth stroke with drag values within the acceptance range. The snubber was inspected and found to have inadequate crimping between a guide rod and pipe attachment end. Upon further investigation, the cause was attributed to a manufacturing defect originating from inadequate crimping of the guide rod. The failed snubber was replaced satisfactorily with a pre-tested snubber. Per the applicable code, ASME OM ISTD 1995 Edition with 1996 Addenda, scope expansion on a manufacturing failure is not required. Although not required by the code, another snubber of similar size and application was added to the 37 sample plan and tested. The functional test results for this additional snubber were satisfactory.
The other function test failure involved a snubber on the main steam (MS) piping exiting the "C" steam generator. The snubber passed the activation functional test, however, it seized during its drag test. The snubber was sent to the manufacturer for investigation. The manufacturer found that the snubber had localized fretting damage along an internal worm gear where the snubber is in its normal hot position.
The fretting was evaluated and attributed to low amplitude vibration in a horizontal section of pipe, which may also affect the other two vertical MS pipe systems exiting the other steam generators. In accordance with ASME OM ISTD 1995 Edition with 1996 Addenda, a failure mode group (FMG) was established that encompassed six MS piping snubbers, including the snubber that had a functional test failure. The other five snubbers in the FMG were removed and tested. The additional test results were satisfactory and no additional failures were found. Per ASME OM ISTD 1995 Edition with 1996 Addenda, no scope expansion was required beyond the FMG. The condition was corrected by replacing the failed snubber with a pre-tested snubber.
Component Support Examinations are summarized in Section 4 of this Report.
Attachment for Serial: HNP-06-081 Steam Generator ISI Summary Fifty percent (50%) of the open tubing in all three steam generators (SG) was inspected using ET technology (bobbin exam) during RFO 13. Rotating coil examinations were conducted on approximately 20% of the tubing in the outer tube bundle and blowdown lane regions in all three SGs on the top of the secondary tubesheet (hot and cold leg sides). Twenty percent (20%) of the Row I U-bends were also inspected with rotating coil examinations.
No degraded tubes were identified from the ET data analysis. The examination results for the SGs are classified as C-1 per the Harris Technical Specifications and EPRI NDE Examination Guidelines. Category C-1 has the following criteria: "Less than 5% of the total tubes inspected are degraded tubes and none of the inspected tubes are defective".
System Pressure Tests ASME Class 1, 2 and 3 Pressure Tests were performed during RFO-1 3 in accordance with ASME Section XI, Articles IWA-5000, IWB-5000 and IWC-5000.
Code Case N-533 was invoked to allow insulation removal at bolted connections while the system was not at operating pressure. Relief Request 2RG-009 was invoked to allow evaluation of leakage at bolted connections in lieu of removing one bolt. Relief Request 2RG-010 was invoked to schedule and examine piping welds with a Risk-Informed Program.
Where leakage was identified, it was either evaluated in accordance with Relief Request 2RG-009, or measures were taken to correct the condition. The Pressure Test records and supporting documentation are on file and available at the plant site for review upon request.
Containment Inspections No IWE examinations of the ASME Class MC Components were required or scheduled during RFO-13. However, as a prudent measure, examinations were performed between the moisture barrier and approximately 12" up from the moisture barrier on the liner. No recordable conditions were observed during these examinations. In addition, as follow-up corrective action from the previous outage, the 'A' Containment Spray valve chambers were opened and examined. A VT-I examination was performed on all bolting and nuts of the valve chamber manway.
No recordable conditions were observed during this examination.
No IWL examinations were required or scheduled in RFO-13. However, for information, an ongoing examination of the exterior containment concrete is in progress, and the results of this examination will be reported in a future ISI Summary Report.
Attachment for Serial: HNP-06-081 Repair and Replacement Summary The repair and replacement summary and the attached ASME Section Xl, NIS-2 forms detail the component, system, work order (WO) number, component description and the description of the work order activity. Complete repair and replacement documentation for the specific component is maintained at the plant site as a permanent record and is retrievable through the work request (WR) or WO document package, which is identified on the NIS-2 form. Section 5 of this report provides the repair and replacement documentation.
Attachment for Serial: HNP-06-081 SECTION 2 (3 Pages)
NIS-1 FORM OWNER'S REPORT FOR INSERVICE INSPECTIONS
Attachment for Serial: HNP-06-081 FORM NIS-1 OWNER'S REPORT FOR INSE*VICE INSPECTIONS As required by the Provisions of the ASME Code Rules
- 1. Owner Proaress Enerav Carolinas. Inc. P.O. Box 1551. Raleiqh, N.C. 27602 (Name and Address of Owner)
- 2. Plant Shearon Harris Nuclear Plant, 5413 Shearon Harris Rd.. New Hill. N.C. 27562 (Name and Address of Plant)
- 3. Plant Unit One (1)
- 4. Owner Certificate of Authorization (if required)
N/A
- 5. Commercial Service Date 5/2187
- 6. National Board Number for Unit 65
- 7. Systems/Components Inspected (See Systems listed below and Section 3, 4, 5, and 6)
Manufacturer State or Component or Manufacturer or Installer Province National Appurtenance or Installer Serial No.
No.
Board No.
Reactor Vessel CB & I T40 NC212410 4
Auxiliary Feedwater CP&L AF N/A 49 Blowdown CP&L BD N/A 44 Chemical & Volume Control CP&L CS N/A 48 Containment Spray CP&L CT N/A 63 Feedwater CP&L FW N/A 54 Excess Letdown Heat Exchanger Atlas NA NC203942 1999 Main Steam CP&L MS N/A 59 Reactor Coolant CP&L RC N/A 55 Residual Heat Removal CP&L RHR NIA 38 Steam Generator - A Westinghouse 12243 NC301552 63 Steam Generator - B Westinghouse 12244 NC301553 64 Steam Generator - C Westinghouse 12245 NC301554 65 Pressurizer Westinghouse 1641 NC212409 W1 1306 Safety Injection CP&L SI N/A 46 Service Water CP&L SW N/A 64 RHR Heat Exchanger - 1A-SA Joseph Oat Corp.
2168-11B7 NC203028 740
Attachment for Serial: HNP-06-081 FORM NIS-1
- 8. Examination Dates 11117/2004 to 5/16/2006
- 9. Inspection Period Identification: Third Inspection Period
- 10. Inspection Interval Identification: Second Inspection Interval
- 11. Applicable Edition of Section XI:
1989 Edition Addenda: None
- 12. Date/Revision of Inspection Plan: January 26, 1998/Revision 1
- 13. Abstract of Examinations and Tests. Include a list of examinations and a statement concerning status of work required for current interval. (See Sections 1, 3 & 4)
- 14. Abstract of Results of Examinations and Tests. (See Sections 1, 3 & 4)
- 15. Abstract of Corrective Measures. (See Sections 3 & 4)
We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code,Section XI.
Certificate of Authorization No. (if applicable)
N/A Expiration Date NIA Date !~i/2/~OO 7L Signed Progress Energy Carolinas, Inc. By.. 2f
ŽZa.,*'-4 Certificate of Inservice Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSBCT of Hartford, CT.
have inspected the components described in this Owner's Report during the period 11117/2004 to 5/16/2006
, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owner's Report in accordance with the Inspection Plan as required by the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
a Commissions NC1507 Inspqpfr'VSignature National Board, State, Province, and Endorsements Date o0 4
Attachment for Serial: HNP-06-081 SECTION 3 (14 Pages)
WEL13 EXAMINATION RESULTS
Attachment for Serial: HNP-06-081 Completion Code Compliance Summary - 2nd Interval ISI - Code Edition - 1989 TOTAL TOTAL CATEGORY REQUIRED COMPLETE COMMENTS B-A 18 18 B-B 5
5 B-D 30 30 B-E 4
4 4 components containing 115 partial penetration welds B-F 12 12 Risk informed ISI invoked for 3rd Period. 6 welds previously classified as B-F are now R-A B-G-1 256 256 B-G-2 706 706 54 components containing 706 individual bolting items B-H 13 13 B-J 85 85 Risk informed ISI invoked for 3rd Period.
B-K-1 2
2 B-L-1 1
1 B-M-2 7
7 Examination required only when disassembled B-N-1 3
3 Required each Period B-N-2 4
4 B-N-3 1
1 B-O 3
3 C-A 9
9 C-B 11 11 C-C 32 32 C-F-1 88 126 Risk informed ISI invoked for 3rd Period.
C-F-2 25 84 Risk informed ISI invoked for 3rd Period.
R-A 29 32 Risk informed ISI invoked for 3rd Period.
Page 3 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13
- 1. Owner: Carolina Power and Light dba Progress Energy
- 2. Plant: Shearon Harris Nuclear Plant
- 3. Plant Unit: 1 Summary No. Comp. ID Comp. Desc.
Class 1 Category B-E H-02972 II-PZR-01HTRPEN(1-78)
VHTRPEN/
- 4. Owner Certificate of Authorization (If Req.): N/A
- 5. Commercial Service Date: May 2, 1987
- 6. National Board Number for Unit: 65 Item Procedure Method/ReDort/Results System Dwg/ISO Exam Date B4.20 NDEP-0612 VT VT-06-121 Sat Comments:
Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
H-03774 Comments:
Class 2 H-02693 Comments:
Class 1 H-03794 Comments:
II-RV-001INSTNOZ(1-13)
VICINOZ/
B4.13 NDEP-0612 VT VT-06-123 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
Category C-F-2 II-FW-001FW°FW-704 Pipe to Cap C5.61 NDEP-0301 MT MT-06-019 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
Category A600 II-RV-001RV-BMI VICINOZ/
A600 NDEP-0612 VT VT-06-020 Sat Examination performed to requirements of MRP-139. No indications identified.
RC-2050 RC-1005 FW-3050 1-ISI-PZR-1 5/11/2006 1-ISI-RV-1 5/11/2006 1-ISI-FW-1 4/17/2006 RC-1005 1-1SI-RV-1 4/10/2006 Class 1 Category B-B H-02980 II-PZR-01LSW.07 VLSW B
62.12 NDEP-0450 UT UT-06-152 NDEP-0450 UT UT-06-151 NDEP-0450 UT UT-06-097 Comments:
Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
Sat Sat Sat RC-2050 RC-2050 RC-2050 1-ISI-PZR-1 1-ISI-PZR-1 1-ISI-PZR-1 4/20/2006 4/20/2006 4/20/2006 Class 1 H-03831 H-03846 Category B-D II-SG-OOISGA-CLNIR-09-1 VNIR /
II-SG-001SGA-HLNIR-09-1 VNIR /
B3.140 B3.140 NDEP-0611 VT VT-06-028 Sat NDEP-0611 VT VT-06-029 Sat Class 1 Category B-E H-03745 II-RV-001CRD(42-65)
VCRDTVW/
64.12 NDEP-0612 VT VT-06-122 Sat Comments:
Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
H-03804 II-RV-00IRVHV-66 VCHVP/
B4.11 NDEP-0612 VT VT-06-124 Sat Comments:
Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
RC-3005 RC-3005 RC-1005 RC-1005 1-ISI-SG-1 4/22/2006 1-ISI-SG-1 4/22/2006 1-ISI-RV-1 5/11/2006 1-ISI-RV-1 5/11/2006 Class 1 H-02989 Comments:
Category B-F II-PZR-O1NSEW-15 VSE/
65.40 NDEP-0612 VT VT-06-008 Sat Examination performed to requirements of MRP-139. No indications identified.
RC-2050 1-ISI-PZR-1 4/18/2006 H-02990 II-PZR-01NSEW-16 VSE /
135.40 NDEP-0612 VT VT-06-009 Sat RC-2050 I-ISI-PZR-1 4/18/2006
Page 4 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13
- 1. Owner: Carolina Power and Light dba Progress Energy
- 2. Plant: Shearon Harris Nuclear Plant
- 3. Plant Unit: 1
- 4. Owner Certificate of Authorization (If Req.): N/A
- 5. Commercial Service Date: May 2,1987
- 6. National Board Number for Unit: 65 Summary No.
Comments:
H-02991 Comments:
H-02992 Comments:
H-02993 Comments:
H-02994 Comments:
H-03806 Comments:
H-03808 Comments:
H-03810 Comments:
H-03812 Comments:
H-03814 Comments:
H-03816 Comments:
Comp. ID Comp. Desc.
Examination performed to requirements of MRP-139.
II-PZR-01NSEW-17 VSE /
Examination performed to requirements of MRP-139.
1I-PZR-01NSEW-18 VSE /
Examination performed to requirements of MRP-139.
1I-PZR-01NSEW-19 VSE/
Examination performed to requirements of MRP-139.
I1-PZR-O1NSEW-20 VSE /
Examination performed to requirements of MRP-139.
II-RV-001 RVNOZAI-N-01 SE Pipe to Nozzle Examination performed to requirements of MRP-139.
Il-RV-001RVNOZAO-N-Nozzle to Pipe 06SE Examination performed to requirements of MRP-139.
I1-RV-001 RVNOZBI-N-03SE Pipe to Nozzle Examination performed to requirements of MRP-139.
lI-RV-001RVNOZBO-N-Nozzle to Pipe 02SE Examination performed to requirements of MRP-139.
II-RV-001 RVNOZCI-N-05SE Pipe to Nozzle Examination performed to requirements of MRP-139.
II-RV-001RVNOZCO-N-Nozzle to Pipe 04SE Examination performed to requirements of MRP-139.
Item Procedure Method/Report/Results System Dwg/ISO Exam Date No indications identified.
B5.40 NDEP-0612 No indications identified.
85.40 NDEP-0612 No indications identified.
B5.40 NDEP-0612 No indications identified.
B5.40 NDEP-0612 No indications identified.
55.10 NDEP-0612 No indications identified.
B5.10 NDEP-0612 No indications identified.
B5.10 NDEP-0612 No indications identified.
85.10 NDEP-0612 No indications identified.
B5.10 NDEP-0612 No indications identified.
B5.10 NDEP-0612 No indications identified.
VT VT-06-010 Sat VT VT-06-011 Sat VT VT-06-012 Sat VT VT-06-013 Sat VT VT-06-115 Sat VT VTo06-116 Sat VT VT-06-117 Sat VT VT-06-118 Sat VT VT-06-119 Sat VT VT-06-120 Sat RC-2050 RC-2050 RC-2050 RC-2050 RC-1005 RC-1005 RC-1005 RC-1005 RC-1005 RC-1005 1-lSI-PZR-1 4/15/2006 1-ISI-PZR-1 4/15/2006 1-lSl-PZR-1 4/15/2006 1 -ISI-PZR-1 4/15/2006 1-lSI-RV-1 5/6/2006 1-1SI-RV-1 5/6/2006 1-1SI-RV-1 5/6/2006 1-lSl-RV-1 5/6/2006 1-ISI-RV-1 5/6/2006 1-lSl-RV-1 5/6/2006 Class 1 Category B-G-1
Page 5 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13
- 1. Owner: Carolina Power and Light dba Progress Energy
- 2. Plant: Shearon Harris Nuclear Plant
- 3. Plant Unit: 1
- 4. Owner Certificate of Authorization (If Req.): N/A
- 5. Commercial Service Date: May 2, 1987
- 6. National Board Number for Unit: 65 Summary No.
Comp. ID Comp. Desc.
Item Procedure Method/Report/Results System H-03180 H-03819 H-03822 Comments:
II-RCP-01RCPA-FBOLT(1-BPHB /
24)
B6.180 NDEP-0439 UT UT-06-126 Sat RC-2025 II-RV-001RVNUT(39-58)
BNUT/
B6.10 NDEP-0611 VT VT-06-005 1I-RV-001RVSTUD(39-58)
BSTUD/
B6.30 NDEP-0439 UT UT-06-127 Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
Sat Sat H-03825 II-RV-001RVWSH(39-58)
BWASH/
B6.50 NDEP-0611 VT VT-06-006 Sat Class 1 Category B-G-2 H-01817 II-CS-103CS-492-F-01 (4)
BFSC/
87.50 NDEP-0611 VT VT-06-001 Sat Comments:
Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
H-03183 H-03741 H-03742 H-03875 H-03876 II-RCP-01RCPA-SBOLT(1-BPSB /
12)
II-RV-001BCONO-C(3)
BCONO /
II-RV-001BCONO-D(3)
BCONO /
II-SG-001SGC-CLMN(1-16) BNUT /
II-SG-001SGC-CLMS(1-16) BBOLT /
II-SG-001SGC-HLMN(1-16) BNUT /
II-SG-001 SGC-HLMS(1 -16) BBOLT /
I1-SI-021SI-250 VBB(1-18)
BVBB /
87.60 87.10 87.10 87.30 B7.30 87.30 87.30 87.70 NDEP-0611 VT VT-06-015 Sat RC°1005 RC-1005 RC-1005 CS-2060 RC-2025 RC-1005 RC-1005 RC-3005 RC-3005 RC-3005 RC-3005 SI-2085 Dwg/ISO Exam Dz 1-ISI-RCP-1 4/19/2006 1-1SI-RV-1 4/24/2006 1-1SI-RV-1 4/19/2006 1-1S!-RV-1 4/24/2006 1-IS1-CS-103 4/12/2006 1-ISI-RCP-1 4/19/2006 ite NDEP-0611 NDEP-0611 NDEP-0611 VT VT-06-016 VT VT-06-017 VT VT-06-034 Sat Sat Sat 1-ISI-R V-1 1-151-flV.1 I-ISI-SGR-1 4/21/2006 4/21/2006 4/27/2006 H-03890 H-03891 H-04473 Comments:
H-04505 Comments:
H-04538 Comments:
NDEP-0611 VT VT-06-035 Sat NDEP-0611 VT VT-06-036 Sat NDEP-0611 VT VT-06-037 Sat NDEP-0611 VT VT-06-002 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified. Examined in place under tension.
II-SI-022SI-252 VBB(1-18)
BVBB/
87.70 NDEP-0611 VT VT-06-003 Sat SI-2085 Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified. Examined in place under tension.
II-SI-023SI-254 VBB(1-18)
BVBB/
87.70 NDEP-0611 VT VT-06-004 Sat SI-2085 Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified. Examined in place under tension.
1-ISI-SGR-1 4/27/2006 1-ISI-SGR-1 4/27/2006 1-ISI-SG-1 4/27/2006 1-ISI-SI-21 4/17/2006 1-ISI-SI-22 4/17/2006 1-ISI-SI-23 4/17/2006 1-ISI-SI-26 4/27/2006 1-ISI-SI-27 4/27/2006 H-04656 H-04701 li-SI-026SI-358 VBB(1-16)
BVBB /
I1-SI-027S1-135 VBB(1-16)
BVBB/
87.70 87.70 NDEP-0611 VT VT-06-097 Sat NDEP-0611 VT VT-06-100 Sat SI-2085 SI-2085 Class 1 Category B-L-1
Page 6 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13
- 1. Owner: Carolina Power and Light dba Progress Energy
- 2. Plant: Shearon Harris Nuclear Plant
- 3. Plant Unit: 1
- 4. Owner Certificate of Authorization (If Req.): N/A
- 5. Commercial Service Date: May 2,1987
- 6. National Board Number for Unit: 65 Summary No. Comp. ID Comp. Desc.
Item Procedure Method/Report/Results System Dwg/ISO Exam Date H-03179 Comments:
Class 1 H-04647 H-04696 irl-ss 1 H-03758 H-03759 H-03760 Class 1 H-00835 Comments:
II-RCP-01RCPA-CW-01 TPUMPCW /
B132.10 NDEP-0611 VT VT-06-078 Sat RC-2025 1-ISI-RCP-1 4/15/2006 Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
Category B-M-2 I1-SI-0261SI-358 INT AVALINT/
B12.50 NDEP-0613 VT VT-06-098 Sat lI-SI-0271S1-135 INT AVALINT/
B12.50 NDEP-0613 VT VT-06-101 Sat lI-RV-001CRDH-54 VCRDHW/
B14.10 NDEP-0201 PT PT-06-022 Sat II.RV-001CRDH-55 VCRDHW/
B14.10 NDEP-0201 PT PT-06-023 Sat II.RV-001CRDH-56 VCRDHW/
B14.10 NDEP-0201 PT PT-06-024 Sat Category F-A CS-H-3243 PZR SPRAY LINE FROM F1.1OR NDEP-0613 VT VT-06-075 Sat Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.
H-04991 RC-H-0004 PZR SURGE LINE FROM F1.10R NDEP-0613 VT VT-06-077 Sat Comments:
Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.
H-05072 RC-H-0862 LOOP 1 CL OUTLET TO F1.10V NDEP-0613 VT VT-06-083 Sat Comments:
Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.
H-05329 SI-H-0117 ACCUM A INJ LINE TO RCS F1.10R NDEP-0613 VT VT-06-066 Sat Comments:
Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
H-05364 SI-H-0189 SIS RES HXTO RCS HL F1.10V NDEP-0613 VT VT-06-086 Sat Comments:
Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
H-05369 SI-H-0231 SIS RES HX TO RCS CL F1.10V NDEP-0613 VT VT-06-076 Sat Comments:
Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
SI-2085 SI-2080 RC-1005 RC-1005 RC-1005 CS-2060 RC-2005 RC-2005 SI-2080 SI-2080 SI-2080 1-ISI-RV-1 1-ISI-RV-1 1-ISI-RV-1 4/21/2006 4/21/2006 4/21/2006 4/14/2006 4/14/2006 4/11/2006 4/11/2006 4/13/2006 4/14/2006 1-ISI-SI-26 4/27/2006 1-ISI-SI-27 4/27/2006 Class 1 H-03026-RI Comments:
H-03033-RI Category R-A ll-RC-022RC-149-3-SW-1 PE,LR / PC,PIPE R1.10 NDEP-0425 UT UT-06-140 Sat NDEP-0425 UT UT-06-098 Sat RC-2005 RC-2005 1-ISl-RC-22 1-ISl-RC-22 4/17/2006 4/17/2006 Examination performed to requirements of Request for Relief 2RG-01 0, the Risk-informed IS. No indications identified. Exam limited due to inner radius of elbow for 2" on elbow side.
ll-RC-022RC-149-3-SW-8 PC,PIPE/PE,LR R1.10 NDEP-0425 UT UT-06-141 Sat NDEP-0425 UT UT-06-099 Sat RC-2005 RC-2005 1-ISI-RC-22 4/17/2006 1-1SI-RC-22 4/17/2006
Page 7 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13
- 1. Owner: Carolina Power and Light dba Progress Energy
- 2. Plant: Shearon Harris Nuclear Plant
- 3. Plant Unit: 1
- 4. Owner Certificate of Authorization (If Req.): N/A
- 5. Commercial Service Date: May 2, 1987
- 6. National Board Number for Unit: 65 Summary No.
Comments:
H-03048-RI Comments:
H-03050-RI Comments:
H-03052-RI Comments:
H-03053-RI Comments:
H-03054-RI Comments:
H-03055-RI Comp. ID Comp. Desc.
Item Procedure Method/Report/Results System Dwg/ISO Exam Date Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified. Exam limited due to inner radius of elbow for 2" on elbow side.
ll-RC-022RC-SW-A6 PE,LR/PC,PIPE R1.10 NDEP-0425 UT UT-06-100 Sat Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.
II-RC-022RC-SW-B4 PE,LR / PC,PIPE R1i.10 NDEP-0425 UT UT-06-101 Sat Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.
lI-RC-022RC-SW-B6 PE,LR/PC,PIPE R1.10 NDEP-0425 UT UT-06-103 Sat Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.
II-RC-022RC-SW-C1O PC,PIPE/PE,LR R1.10 NDEP-0425 UT UT-06-104 Sat NDEP-0425 UT UT-06-142 Sat Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.
lI-RC-022RC-SW-C11 PE,LR / PC,PIPE R1.10 NDEP-0425 UT UT-06-143 Sat NDEP-0425 UT UT-06-105 Sat Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.
II-RC-022RC-SW-C12 PC,PIPE/PE,LR R1.10 NDEP-0425 UT UT-06-106 Sat NDEP-0425 UT UT-06-144 Sat Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.
II-RC-022RC-SW-C19 PE,LR/PC,PIPE R1.10 NDEP-0425 UT UT-06-145 Sat NDEP-0425 UT UT-06-128 Sat Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.
II-RC-022RC-SW-C8 PC,PIPE / PC,RED R1.10 NDEP-0437 UT UT-06-107 Sat Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.
Il-RC-027RC-FW-329 PC,SEE/ PC,PIPE R1.10 NDEP-0425 UT UT-06-108 Sat Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.
II-RC-027RC-FW-334 PC,SEE/ PC,PB R1.10 NDEP-0425 UT UT-06-109 Sat Examination performed to requirements of Request for Relief 2RG-01 0, the Risk-informed IS. No indications identified.
RC-2005 RC-2005 RC-2005 1-ISI-RC-22 4/17/2006 1-ISI-RC-22 4/17/2006 1-ISI-RC-22 4/17/2006 RC-2005 1-ISI-RC-22 4/17/2006 RC-2005 1-ISI-RC-22 4/17/2006 Exam limited due to inner radius of elbow for 2" on elbow side.
RC-2005 1-ISI-RC-22 4/17/2006 RC-2005 1-ISI-RC-22 4/17/2006 Exam limited due to inner radius of elbow for 2" on elbow side.
RC-2005 1-ISI-RC-22 4/17/2006 RC-2005 1-ISI-RC-22 4/17/2006 Comments:
H-03057-RI Comments:
H-03059-RI Comments:
H-03142-RI Comments:
H-03144-RI Comments:
Exam limited due to inner radius of elbow for 2" on elbow side.
RC-2005 1-ISI-RC-22 4/17/2006 RC-2005 1-ISI-RC-22 4/17/2006 Exam limited due to inner radius of elbow for 2" on elbow side.
RC-2005 1-1S1-RC-22 4/21/2006 RC-2005 RC-2005 1-ISl-RC-27 4/17/2006 1-ISI-RC-27 4/17/2006
Page 8 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13
- 1. Owner: Carolina Power and Light dba Progress Energy
- 2. Plant: Shearon Harris Nuclear Plant
- 3. Plant Unit: 1
- 4. Owner Certificate of Authorization (If Req.): N/A
- 5. Commercial Service Date: May 2, 1987
- 6. National Board Number for Unit: 65 Summary No. Comp. ID Class 2 Category C-0 Comp. Desc.
item Procedure Method/Report/Results System Dwg/ISO Exam Date H-03848 Il-SG-001SGA-STHW-02-1 VSTHW/
C1.20 NDEP-0450 UT UT-06-113 Sat NDEP-0450 UT UT-06-154 Sat NDEP-0450 UT UT-06-153 Sat Examination performed to requirements of the 1989 Edition of ASME Section XA. No indications identified.
Comments:
RC-3005 RC-3005 RC-3005 RC-3005 RC-3005 RC-3005 1-ISI-SG-1 1-ISr*SG-1 1-ISI-SG-1 4/24/2006 4/24/2006 4/24/2006 H-03850 Il-SG-001SGA-TSTSW VTSTVW /
1 01.30 NDEP-0450 UT UT-06-158 Sat 1-1SI-SG-1 4/26/2006 1-lSI-SG-1 4/26/2006 1-1SI-SG-1 4/26/2006 NDEP-0450 UT UT-06-157 Sat NDEP-0450 UT UT-06-114 Sat Comments:
Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
Class 2 Category C-B H-03828 ll-SG-001SGA-AFWNTSW-VNTVWI /
11-1 C2.21 NDEP-0450 UT UT-06-161 Sat NDEP-0450 NDEP-0301 NDEP-0450 NDEP-0458 UT MT UT UT UT-06-160 Sat MT-06-028 Sat UT-06-110 Sat UT-06-1 11 Sat H-03832 H-03833 II-SG-001SGA-FWNIR-05-1 VNIR /
I1-SG-OO1SGA-FWNTSW-VNTVWI /
05-1 C2.22 C2.21 RC-3005 RC-3005 RC-3005 RC-3005 RC-3005 RC-3005 RC-3005 RC-3005 RC-3005 FW-3050 1-1SI-SG-1 4/26/2006 1-ISl-SG-1 1-ISI-SG-1 1.151-SG-1 1-ISI-SG-1 4/26/2006 4/26/2006 4/26/2006 4/26/2006 NDEP-0450 UT UT-06-112 Sat 1-ISI-SG-1 4/26/2006 NDEP-0450 NDEP-0301 NDEP-0450 UT MT UT UT-06-155 Sat MT-06-029 Sat UT-06-156 Sat 1-ISI-SG-1 1-ISI-SG-1 I-151-SG-1 4/26/2006 4/26/2006 4/26/2006 Class 2 Category C-C H-02431 II-FMR-O1FW-H-01061(8)
PC,PIPE / PI,LUGN C3.20 NDEP-0301 MT MT-06-014 Sat 1-lSI-FW-MS-4/29/2006 RC-1 Comments:
Class 2 H-02689 Comments:
H-02690 Comments:
Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
Category C-F-2 II-FW-001FW-FW-700 Red. to Cap C5.61 NDEP-0301 MT MT-06-015 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
II-FW-001FW.FW-701 Red. to Cap C5.61 NDEP-0301 MT MT-06-016 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
FW-3050 FW-3050 1-ISI-FW-1 4/17/2006 1-1SI-FW-1 4/17/2006
Page 9 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13
- 1. Owner: Carolina Power and Light dba Progress Energy
- 2. Plant: Shearon Harris Nuclear Plant
- 3. Plant Unit: 1
- 4. Owner Certificate of Authorization (If Req.): N/A
- 5. Commercial Service Date: May 2, 1987
- 6. National Board Number for Unit: 65 Summary No.
H-02691 Comments:
H-02692 Comments:
H-02694 Comments:
H-02708 Comments:
H-02709 Comments:
H-0271 0 Comments:
H-02711 Comments:
H-02741 Comments:
H-02742 Comments:
H-02743 Comments:
H-02744 Comments:
H-02794 Comp. ID Comp. Desc.
Item Procedure Method/Report/Results System Dwg/ISO Exam Date II-FW-001 FW-FW-702 Red. to Cap C5.61 NDEP-0301 MT MT-06-017 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
II-FW-001FW-FW-703 Pipe to Cap C5.61 NDEP-0301 MT MT-06-018 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
II-FW-001FW-FW-705 Pipe to Cap C5.61 NDEP-0301 MT MT-06-020 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
II-FW-002AF-13-FW-258 PC,RED / PC,PIPE C5.51 NDEP-0437 UT UT-06-011 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
II-FW.002AF-16-1-FW-263 PC,PIPE/PC,PIPE C5.51 NDEP-0437 UT UT-06-012 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
II-FW-002AF-16.2-FW-261 PE,LR/PC,PIPE C5.51 NDEP-0437 UT UT-06-013 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
ll-FW-002AF-16-2-FW-262 PC,PIPE/PE,LR C5.51 NDEP-0437 UT UT-06-014 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
1I-FW-003AF-14.FW-268 PC,VLV / PC,PIPE C5.51 NDEP-0437 UT UT-06-015 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
II-FW-003AF.17-1.FW-270 PC,PIPE/PE,LR C5.51 NDEP-0437 UT UT-06-016 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
II-FW-003AF-17-1-FW-271 PE,LR/PC,PIPE C5.51 NDEP-0437 UT UT-06-017 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
II-FW-003AF-17-1-FW-272 PC,PIPE/PC,PIPE C5.51 NDEP-0437 UT UT-06-018 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
II-FW-004AF-15-FW-267 PC,RED/ PC,PIPE C5.51 NDEP-0437 UT UT-06-022 Sat FW-3050 FW-3050 FW-3050 AF-3065 AF-3065 AF-3065 AF-3065 AF-3065 AF-3065 AF-3065 AF-3065 AF-3065 1-ISI-FW-1 4/17/2006 1-ISI-FW-1 4/17/2006 1-tSI-FW-1 4/17/2006 1-ISI-FW-2 4/19/2006 1-ISI-FW-2 4/19/2006 1-ISI-FW-2 4/29/2006 1-ISI-FW-2 4/19/2006 1-ISI-FW-3 411912006 1-ISI-FW-3 4/19/2006 1-ISI-FW-3 4/19/2006 1-ISI-FW-3 4/19/2006 1-ISI-FW-4 4/19/2006
Page 10 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13
- 1. Owner: Carolina Power and Light dba Progress Energy
- 2. Plant: Shearon Harris Nuclear Plant
- 3. Plant Unit: 1
- 4. Owner Certificate of Authorization (If Req.): N/A
- 5. Commercial Service Date: May 2, 1987
- 6. National Board Number for Unit: 65 Summary No.
Comments:
H-02795 Comments:
H-02796 Comments:
H-02797 Comments:
H-02856 Comments:
H-02857 Comments:
H-02858 Comments:
H-02887 Comments:
H-02888 Comments:
H-02889 Comments:
H-02890 Comments:
H-02891 Comments:
H-02893 Comments:
Comp. ID Examination Comp. Desc.
Item Procedure Method/ReDort/Results System Dwg/ISO Exam Date performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.
lI-FW-004AF-18-FW-280 PE,LR / PC,PIPE C5.51 NDEP-0437 UT UT-06-023 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
ll-FW-004AF-18-FW-281 PC,PIPE/ PE,LR C5.51 NDEP-0437 UT UT-06-024 Sat Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.
11-FW-004AF-18-FW-282 PC,PIPE / PC,PIPE C5.51 NDEP-0437 UT UT-06-025 Sat Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.
Il-MS-001MS-FW-301 PC,PIPE/PC,PIPE C5.51 NDEP-0437 UT UT-06-050 Sat Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.
ll-MS-001MS-FW-302 PCPIPE/ PC,VLV C5.51 NDEP-0437 UT UT-06-051 Sat Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.
ll-MS-001MS-FW-302A PLSW,P/
C5.52 NDEP-0437 UT UT-06-052 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
AF-3065 AF-3065 AF-3065 MS-3020 MS-3020 MS-3020 NIS-3020 1-ISI-FW-4 4/19/2006 1-lSI-FW-4 4/19/2006 1 -ISI-FW-4 4/19/2006 1-1SI-MS-1 4/22/2006 1-ISI-MS-1 4/29/2006 1-1SI-MS-1 4/29/2006 1-IS I-MS-1 4/15/2006 II.MS-001M S-SW-C 11 PC,PIPE / PC,NOZW C5.51 NDEP-0437 UT UT-06-054 Sat Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified. Exam limited due to obstruction from sweep-o-let and permanent pipe support.
fl-MS-001MS-SW-C12 PCPIPE/PC,NOZW C5.51 NDEP-0437 UT UT-06-055 Sat MS-3020 1-ISI-MS-1 4/29/2006 Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.
ll-MS-001MS-SW-C13 PC,PIPE / PC,NOZW C5.51 NDEP-0437 UT UT-06-056 Sat MS-3020 1-1SI-MS-1 4/15/2006 Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.
Il-MS-0011MS-SW-C14 PC,PIPE/ PC,NOZW C5.51 NDEP-0437 UT UT-06-057 Sat MS-3020 1-1SI-MS-1 4/15/2006 Examination performed to requirements of the 1989 Edition of ASME Section X1. No indications identified. Exam limited due to obstruction from sweep-o-let and permanent pipe support.
II-MS-001MS-SW-C15 PCPIPE/ PC,NOZW C5.51 NDEP-0437 UT UT-06-058 Sat MS-3020 1-ISI-MS-1 4/15/2006 Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified. Exam limited due to obstruction from sweep-o-let and permanent pipe support.
Il-MS-0OlMS-SW-C3 PC,PIPE / PC,PIPE C5.51 NDEP-0437 UT UT-06-059 Sat MS-3020 1 -1SI-MS-1 4/20/2006 Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.
Page 11 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13
- 1. Owner: Carolina Power and Light dba Progress Energy
- 2. Plant: Shearon Harris Nuclear Plant
- 3. Plant Unit: 1
- 4. Owner Certificate of Authorization (If Req.): N/A
- 5. Commercial Service Date: May 2, 1987
- 6. National Board Number for Unit: 65 Summary No. Comp. ID Comp. Desc.
Item Procedure Method/ReDort/Results System Dwq/ISO Exam Date H-02894 II-MS-001MS-SW-C30 PBCC,EX/ PC,PIPE C5.51 NDEP-0437 UT UT-06-060 Sat Comments:
Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
H-02895 Il-MS-001MS-SW-C34 PBCC,EX/ PC,PIPE C5.51 NDEP-0437 UT UT-06-061 Sat Comments:
Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
H-02896 Currirrrents:
H-02897 Comments:
H-02898 Comments:
H-02899 Comments:
H-02931 Comments:
II-MS-O01 MS-SW-C36 PC,PIPE / PC,PIPE C5.51 NDEP-0437 UT UT-06-062 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
II-MS-001MS-SW-C3A PLSW,P/
C5.52 NDEP-0437 UT UT-06-063 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
II-MS-001MS-SW-C4 PBCC,EX/PC,PIPE C5.51 NDEP-0437 UT UT-06-064 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
II-MS-001MS-SW-C5 PC,PIPE/ PC,CAP C5.51 NDEP-0437 UT UT-06-065 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
II-MS-002MS-FW-680 PC,PIPE / PELR C5.51 NDEP-0437 UT UT-06-092 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
MS-3020 MS-3020 MS-3020 MS-3020 MS-3020 MS-3020 MS-3020 MS-3020 MS-3020 MS-3020 MS-3020 1-1St-MS-1 4/20/2006 1-1SI-MS-1 4/20/2006 1-1SI-MS-1 4/20/2006 1-1SI-MS-1 4/20/2006 1-1SI-MS-1 4/20/2006 1-1SI-MS-I 4/25/2006 1-ISI-MS-2 4/21/2006 1-ISI-MS-2 4/21/2006 1-ISI-MS-2 4/29/2006 1-ISI-MS-2 4/29/2006 1-ISI-MS-2 4/21/2006 H-02932 II-MS-002MS-FW-681 PC,PIPE / PC,VLV C5.51 NDEP-0437 UT UT-06-093 Sat Comments:
Examination performed to requirements of the 1989 Edition of ASME Section Xl. No indications identified.
H-02933 I1-MS-002MS-FW-682 PC,VLV / PC,PIPE C5.51 NDEP-0437 UT UT-06-094 Sat Comments:
Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
H-02934 Il-MS-002MS-FW-683 PC,PIPE / PC,VLV C5.51 NDEP-0437 UT UT-06-095 Sat Comments:
Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
H-02941 II-MS-002MS-SW-E3 PE,LR / PC,PIPE C5.51 NDEP-0437 UT UT-06-096 Sat Comments:
Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
Class 2 H-00242 H-00247 H-00272 Category F-A AF-H-0470 AF-H-0486 BD-H-0166 FROM FP B VALVE 1AF-102 F1.20R FROMFP B VALVE 1AF-81 F1.20R S/GbCBLDWN TO ISO F1.20R NDEP-0613 NDEP-0613 NDEP-0613 VT VT-06-106 VT VT-06-107 VT VT-06-109 Sat Sat Sat AF-3065 AF-3065 BD-3010 5/2/2006 5/1/2006 4/26/2006
Page 12 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13
- 1. Owner: Carolina Power and Light dba Progress Energy
- 2. Plant: Shearon Harris Nuclear Plant
- 3. Plant Unit: 1
- 4. Owner Certificate of Authorization (If Req.): N/A
- 5. Commercial Service Date: May 2,1987
- 6. National Board Number for Unit: 65 Summary No.
H-00274 H-00784 H-00786 H-00792 H-00800 Comments:
Comp. ID Comp. Desc.
Item Procedure Method/Report/Results System Dwg/ISO Exam Date BD-H-0208 S/G B BLDWN TO ISO F1.20R NDEP-0613 VT VT-06-1C CS-H-1426 RCP B SEAL INJ AT CONT F1.20R NDEP-0613 VT VT-06-11 CS-H-2603 RCPASEAL INJ AT CONT F1.20R NDEP-0613 VT VT-06-11 CS-H-2820 RCPC SEAL INJ AT CONT F1.20R NDEP-0613 VT VT-06-10 CS-H-2855 RC S-CEAL INJ AT CONT F1.20B NDEP-0613 VT VT-06-0(
PENE M-11 Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
)8 10 11
'4 33 Sat Sat Sat Sat Sat BD-3010 CS-2060 CS-2060 CS-2060 CS-2060 4/26/2006 4/29/2006 4/29/2006 4/23/2006 4/10/2006 C-1-236-1-CS-H-2855 H-00804 Comments:
H-00818 Comments:
H-01073 Comments:
CS-H-2860 RCP C SEAL INJATCONT F1.20R NDEP-0613 VT VT-06-059 Sat Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
CS-H-2880 RCP B SEAL INJ AT CONT F1.20R NDEP-0613 VT VT-06-061 Sat PENE M-10 Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
CS-2060 CS-2060 4/11/2006 C-1-236-1-CS-4/10/2006 H-2880 C-5-261-1-FW-4/10/2006 H-102 FW-H-01 02 FROM PENE M-4 TO S/G A F1.20R NDEP-0613 VT VT-06-062 Sat FW-3050 Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
H-01097 H-02406 FW-H-0491 II-CTP-01 CTPB-H-001 -003 ESR 97-807 F1.20R F1.40 NDEP-0613 VT VT-06-112 Sat NDEP-0613 VT VT-06-084 Sat FW-3050 CT-2070 5/2/2006 4/17/2006 Comments:
Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
H-04937 H-04938 H-05075 Comments:
H-05295 Comments:
H-05352 Comments:
H-05386 Comments:
MS-H-0093 S/G C OUTLET CONN F1.20R NDEP-0613 VT VT-06-113 MS-H-0094 S/G" 0 OUTLET CONN' F1.20V NDEP-0613 VT VT-06-114 RH-H-0010 RFR-HX "B(TLE
-F61 F1.20V NDEP-0613 VT VT-06-102 Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
Sat Sat Sat SI-H-0022 LOW HEAD INJ TO RCS CL F1.20V NDEP-0613 VT VT-06-082 Sat Examination performed to requirements of the 1989 Edition of ASME Section Xi. No indications identified.
SI-H-0166 SIS RES HX TO RCS HL F1.20R NDEP-0613 VT VT-06-064 Sat LOOP 1 Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
SI-H-0274 ACCUM TK C INJ LINE TO F1.20B NDEP-0613 VT VT-06-060 Sat RCSCLLOOP3 Examination performed to requirements of the 1989 Edition of ASME Section XI. No indications identified.
MS-3020 MS-3020 RH-2085 SI-2080 SI-2080 SI-2080 4/25/2006 4/25/2006 4/6/2006 4/12/2006 C-1-236-1-SI-H-4/10/2006 166 C-1-236-1 -SI-H-4/10/2006 274
Page 13 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13
- 1. Owner: Carolina Power and Light dba Progress Energy
- 2. Plant: Shearon Harris Nuclear Plant
- 3. Plant Unit: 1 Summary No. Comp. ID Comp. Desc.
- 4. Owner Certificate of Authorization (If Req.): N/A
- 5. Commercial Service Date: May 2, 1987
- 6. National Board Number for Unit: 65 Procedure Method/Report/Results System Dwg/ISO Exam Date Item Class 2 Category R-A H-01 184-RI II-AF-008AF-FW-8 PC,PIPE/VSG1A R1.10 NDEP-0437 UT UT-06-001 Sat H-02019-RI Comments:
H-02430-RI Comments:
H-04019-RI Comments:
H-04020-RI Comments:
H-04030-RI Comments:
H-04041-RI Comments:
H-04042-RI Comments:
H-04112-RI Comments:
H-04626-RI Comments:
H-04627-RI II-CT-007CT-FW-31 PC,PIPE/ PC,PB R1.10 NDEP-0425 UT UT-06-002 Sat NDEP-0425 UT UT-06-135 Sat Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.
ii-FMR-0 1PF-FW-7 PE,LR/VNOZ1AI RI.10 NDEP-0437 UT UT-06-004 Sat Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.
II-SI-008SI-FW-449 PCPIPE/PP,FHS R1.10 NDEP-0425 UT UT-06-115 Sat Examination performed to requirements of Request for Relief 2RG-01 0, the Risk-informed IS. No indications identified.
AF-3065 CT-2070 CT-2070 FW-3050 SI-2085 SI-2085 1-ISI-AF-8 4/26/2006 1-ISI-CT-7 4/12/2006 1-ISI-CT-7 4/12/2006 1-181-FW-MS-RC-1 4/26/2006 1-ISI-SI-8 4/10/2006 1-ISI-SI-8 4/10/2006 II-SI-008SI-FW-450 PC,VLV / PC,PIPE R1.10 NDEP-0425 UT UT-06-116 Sat NDEP-0425 UT UT-06-133 Sat Examination performed to requirements of Request for Relief 2RG-01 0, the Risk-informed IS. No indications identified.
II-SI-008SI-FW-456 PC,PIPE / PP,FHS R1.10 NDEP-0425 UT UT-06-117 Sat Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.
II-SI-008SI-SW-A3 PE,LR / PC,PIPE R1.10 NDEP-0425 UT UT-06-119 Sat Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.
II-SI-008SI-SW-A4 PC,PIPE/ PE,LR R1.10 NDEP-0425 UT UT-06-120 Sat Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.
II-SI-008SI-SW-J4 PE,LR / PC,PIPE R1.10 NDEP-0425 UT UT-06-122 Sat Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.
1I-SI-025SI-SW-D5 PC,PIPE/ PE,LR R1.10 NDEP-0425 UT UT-06-137 Sat NDEP-0425 UT UT-06-136 Sat Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.
II-SI-025SI-SW-D6 PE,LR / PC,PIPE R1.10 NDEP-0425 UT UT-06-138 Sat NDEP-0425 UT UT-06-123 Sat SI-2085 1-ISI-SI-8 Exam limited due to valve to pipe configuration.
SI-2085 1-ISI-SI-8 4/10/2006 4/13/2006 SI-2085 SI-2085 SI-2085 SI-2085 SI-2085 SI-2085 SI-2085 1-ISI-SI-8 4/10/2006 1-ISI-SI-8 4110/2006 1-ISI-SI-8 4/13/2006 1-ISI-SI-25 4/13/2006 1-ISI-SI-25 4/13/2006 1-ISI-SI-25 4/13/2006 1-ISI-SI-25 4/13/2006
Page 14 of 14 Section 3 Inservice Inspection Report Interval 2, Period 3, IRFO-13
- 1. Owner: Carolina Power and Light dba Progress Energy
- 2. Plant: Shearon Harris Nuclear Plant
- 3. Plant Unit: 1
- 4. Owner Certificate of Authorization (If Req.): N/A
- 5. Commercial Service Date: May 2, 1987
- 6. National Board Number for Unit: 65 Summary No. Comp. ID Comp. Desc.
Item Procedure Method/Report/Results System Dwg/ISO Exam Date Comments:
Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.
H-04628-RI II-SI-025SI-SW-D7 PCPIPE/PE,LR R1.10 NDEP-0425 UT UT-06-124 Sat Comments:
Examination performed to requirements of Request for Relief 2RG-010, the Risk-informed IS. No indications identified.
SI-2085 SI-2085 SI-2085 1-1SI-SI-25 4/13/2006 1-ISI-SI-25 4/13/2006 1-ISI-SI-25 4/13/2006 H-04629-RI Comments:
II-SI-025SI-SW-D8 PELR/PC,PB R1.10 NDEP-0425 UT UT-06-125 Sat NDEP-0425 UT UT-06-139 Sat Examination performed to requirements of Request for Rp.linf PRG-01 0, the Risk-informed IS. No indications identified.
Attachment for Serial: HNP-06-081 SECTION 4 (4 Pages)
COMPONENT SUPPORTS
Attachment for Serial: HNP-06-081 ASME Section Xl Class 1 and 2 Component Support Examination Program Category F-A Item FI.10B Support ID Class I Hanger - Box Type Support Location Exam Type Exam Date Exam Results Examiner None scheduled n/a n/a n/a n/a n/a Category F-A Item FI.1OR Support ID Class I Hanger - Rigid Strut Support Location Exam Type Exam Date Exam Results RC-H-245 SI-H-317 SI-H-325 RCB 307'@ PZR RCB 246' Az-161 R-41' RCB 248' Az-160 R-22' VT-3 10/21/2004 VT-3 10/20/2004 VT-3 10/20/2004 SAT SAT SAT Examiner GDL GDL/MDH GDL/MDH Category F-A Item FI.1OV Support ID Class I Hanger - Variable (Spring Can) Support Location Exam Type Exam Date Exam Results CS-H-2891 RC-H-199 RC-H-226 RCB 255' Az-240 R-39' RCB 307'@ PZR RCB 309'@ PZR Class 2 Hanger - Anchor Location VT-3 VT-3 VT-3 10/20/2004 10/20/2004 10/20/2004 SAT SAT SAT Examiner GDL/MDH GDL GDL Examiner Category F-A Item F1.20A Support ID Exam Type Exam Date Exam Results None scheduled n/a n/a n1a n1a n1a
Attachment for Serial: HNP-06-081 ASME Section Xl Class 1 and 2 Component Support Examination Program Category F-A Item F1.20B Support ID Class 2 Hanger - Box Type Support Location Exam Type RH-H-12 SI-H-165 RH-H-1 85 (6' ladder)
RAB 246' 4'S/39 5MV/E RCB 247' AZ-6 R-47' RAB 240' 2'N/36 9'E/E VT-3 VT-3 VT-3 Exam Date 5/10/2004 10/17/2004 10/24/2004 Exam Results SAT SAT SAT Examiner GDL/SAB GDL/JDS RPS Category F-A Item F1.20R Support ID Class 2 Hanger - Rigid Strut Support Location Exam Type CS-H-2603 CS-H-2853 CS-H-2948 RAB 255' 6'N/16 1 'W/GY RCB 255' AZ-1 83 R-50' RCB 255' AZ-341 R-48' VT-3 VT-3 VT-3 Exam Date 5/10/2004 10/20/2004 10/20/2004 Exam Results SAT SAT SAT Examiner GDL/SAB GDL/MDH GDL/MDH Examiner Category F-A Item F1.20V Support ID Class 2 Hanger - Variable (Spring Can) Support Location Exam Type Exam Date Exam Results RH-H-349 RAB 193' 8'N/32 5'W/FZ VT-3 10/23/2004 SAT RPS Category F-A Item F1.40 Support ID RHR Pump 1B-SB Cooler (
lI-RHPC-lB-H-001 Class 1 and 2 Equipment Supports Location Exam Type Exam Date Exam Results Examiner I examination point) - Class 2 RAB 195'N 4'S/34 1 0'W/FZ VT-3 10/24/2004 SAT GDL RHR Heat Exchanger lB-SB ( 8 examination points ) - Class 2 lI-RHR-0IRHRB-H-001-008 RAB 236' 4'S/36 13'E/E VT-3 10/24/2004 SAT RPS
Attachment for Serial: HNP-06-081 ASME Section Xl Class I and 2 Component Support Examination Program Steam Generator 1B-SN (4 examination points on vertical support columns ) - Class I II-SG-001SGB-H-001-004 RCB 255' Az-265 R-32' VT-3 10/25/2004 Comment: Exam resulting from visual failure in 2-2-11 (RFO 11) - loose bolting Category F-A Item F1.40 Class 1 and 2 Equipment Supports - continued Support ID Location Exam Type Exam Date SAT SAB Exam Results Examiner Steam Generator 1B-SN Upper Lateral Support ( 2 examination points including ULS bolting ) - Class 1 II-SG-OOISGB-H-007-008 RCB 302' Az-265 R-32'
\\/T-3 10/9R22004 SAT NLC!J\\IW Comment: Exam resulting from visual failure in 2-2-11 (RFO 11) - loose bolting Steam Generator IC-SN Upper Lateral Support ( 2 examination points including ULS bolting ) - Class I II-SG-001SGC-H-007-008 RCB 302' AZ-140 R-32' VT-3 10/28/2004 SAT NLC/JVW Comment: Exam resulting from visual failure in 2-2-11 (RFO 11) - loose bolting Reactor Vessel IX-SN Nozzle Supports (6 examination points) - Class 1 II-RPV-01H-001-006 RCB 255' Center VT-3 10/30/2004 Comment: Exam included in RF012 scope to coincide with ISI visual exams of nozzle welds Comments:
PSI performed on CE-H-11 lAW WO 397803 KMK 10124104 - SAT PSI performed on SW-H-2539 lAW WO 89126 RPS 10/28/04 - SAT SAT M. DUGAN
Attachment to Serial: HNP-06-081 SECTION 5 (48 Pages)
NIS-2 FORMS REPORT OF REPAIRS AND REPLACEMENTS
WO# 654038-01 R/R# 03-02-0033 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner CP&L dba Progress Energy Name Date 06/09/2006 2.
3.
P.O. Box 1551, Raleigh, N.C. 27602-1551 Address Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Sheet 1 of 2 Unit 1 WO# 654038-01 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System Service Water 5
(a) Applicable Construction Code ASME Section 11 1974 Edition, Winter 1976 Addenda, N-416-2 Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
Expansion Joint Unknown Unknown Unknown 1SW-E051 unknown Repaired Yes Nuts Unknown N/A N/A N/A Unknown Replaced No Nuts Nova N/A N/A N/A 2004 Replacement No Capscrews Unknown N/A N/A N/A Unknown Replaced No Capscrews Nova N/A N/A N/A 2005 Replacement No
- 7. Description of Work: weld repair of expansion joint
- 8. Tests Conducted: Hydrostatic [] Pneumatic [I Nominal Operation Pressure ED Other E] Pressure ___psi Test Temp.
!_ F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet in numbered and the number of sheet is recorded at the top of this form.
9 Sheet 2 of 2 WO# 654038-01 R/R# 03-02-0033 S.FORM NIS-2 (Back)
- 9. Remarks Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this repair conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed Z*,*
ISI Coordinator Date A2ZZaQo Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut hae ipspected the components described in this Owner's Report during the period of 1/5/2006 to e/A*v/6
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
-4r_,* *Commissions NC 1507, ABIN NS
-.*perrs Signature National Board, State, Province, and Endorsements Date *f*,*'
K)
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl WO# 626371-05 R/R# 05-02-0039
- 1. Owner CP&L dba Progress Enerqy Name P.O. Box 1551, Raleigh, N'.
27602-1551 Address
- 2. Plant Shearon Harris Nuclear Power Plant Date 06/13/2006 Sheet1 of 2 Unit 1 WO# 626371-05 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address 3.
Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System Charging System 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of
- Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
Nut Unknown N/A N/A CS-H-1395 Unknown Replaced No Nut Coloc N/A N/A CS-H-1395 Unknown Replacement No
- 7. Description of Work: Replaced nuts on support
- 8. Tests Conducted: Hydrostatic E] Pneumatic El Nominal Operation Pressure El Other El Pressure ____psi Test Temp. _
-F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/22 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet in numbered and the number of sheet is recorded at the top of this form.
V, Sheet 2 of 2 WO# 626371-05 R/R# 05-02-0039 FORM NIS-2 (Back)
- 9. Remarks Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A ISI Coordinator Expiration Date N/A Date 44
'1/*i2 G
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartforg, Connecticut haveyinspgcted the components described in this Owner's Report during the period of
- /_
4..l$.
to 6.*
/oK.
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions NC 1507, ABIN NS I ns r's Signature National Board, State, Province, and Endorsements Date 0!1,lb&)
WOOf 672739-02 R/R# 05-02-0041
£ C) ~
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
- 1. Owner CP&L dba Procress Enerciv Date 06/13/2006 Name 2.
3.
P.O. Box 1551, Raleigqh, N.C. 27602-1551 Address Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Sheet 1 of 2 Unit 1 WO# 672739-02 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System Sampling System 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, N-416-2 Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6.
Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced,.
Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
604 None 1984 Repaired Yes 1SP-200 disk Target Rock Unknown N/A None 1984 Replaced No ISP-200 disk Target Rock 1517 or 1531 NIA 92201-I 2004 Replacement No
- 7. Description of Work: Removed/replaced seal weld and replaced valve disk
- 8. Tests Conducted: Hydrostatic [] Pneumatic El Nominal Operating Pressure [
Other E] Pressure psi Test Temp. _
F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WOlf 672739-02 R/R# 05-02-0041 FORM NIS-2 (Back)
- 9. Remarks.
. Applicable Manufacturer's Data Reports to be attached..
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A
.-- - Certificate of Authbrization No. N/A*
- 1 I~l CnAr~1in~tnr Expiration Date N/A Date 3,e 49C Signe -l IqI Coordinator Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have, inspected the components described in this Owner's Report during the period of 4/12/2006 to 7/../,A
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
, 0fR.,,
2-1.
Commissions NC 1507, ABIN NS J -
Kspectores Signature National Board, State, Province, and Endorsements Date Z X AO 0
WOU 680701-01 RIR# 05-02-0056 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner CP&L dba Progress Enerqy Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Address
- 2. Plant Shearon Harris Nuclear Power Plant Date 06/13/2006 -
Sheet 1 of 2 Unit 1 WO4 680701-01 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address
- 3. Work Performed By Progress Energy Name.
5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A Address
- 4. Identification of System CS - Chemical Volume Control 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
,.Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No) 1 GS-747 disk Unknown Unknown N/A None Unknown Replaced No lCS-747 disk BW/IP International Pump Unknown N/A 40276 1997 Replacement No
- 7. Description of Work: Replace disk
- 8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operation Pressure El Other E] Pressure ___psi Test Temp. ___
F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet in numbered and the number of sheet is recorded at the top of this form.
0 Sheet 2 of 2 WO# 680701-01 R/R# 05-02-0056 FORM NIS-2 (Back)
- 9. Remarks Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Signed
,2e-*.
v Expiration Date N/A Date 1v z 6
. !SI Coordinator Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have insppcted the components described in this Owner's Report during the period of 4/20/2006 to A,04iS
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions NC 1507, ABIN NS I*e rS Sig -na t u r e National Board, State, Province, and Endorsements Date _________
~.
r.
N WO# 663969-01 R/R# 06-02-0057 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
- 1. Owner CP&L dba Proaress Enermy Name--
Address Plant Shearon Harris Nuclear Power Plant Name
- 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hifl, N.C. 27562-0165 Address Date 06/15/2006 Sheet 1 of 2 Unit 1 WOlf 663969-01 3.
Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System CT - Containment Spray 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No) 1CT-65 disk Rockwell Edwards Unknown N/A None Unknown Replaced No ICT-65 disk Edward Vogt Valve Co AV-82 N/A None 2001 Replacement No 1 CT-65 Rockwell Edwards Unknown N/A None Unknown Repaired No
- 7. Description of Work: remove/replace seal weld, replace valve disk
- 8. Tests Conducted: Hydrostatic El Pneumatic E] Nominal Operating Pressure LI Other nI Pressure ___psi Test Temp. _
F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 663969-01 R/R# 06-02-0057 FORM.NIS-2 (Back)
- 9. Remarks ___.
Applicable Manufacturer's Data Reports to be attached.
I-CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code, Section Xl.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Date Z/
Signed 7Z**4-,"
-ie.--,
IS1 Coordinator Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut h veirspected the components described in this Owners Report during the period of 2/14/2005 to 4
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
alc;,
A Commissions NC 1507, ABIN NS
, llnsketor's Signature National Board, State, Province, and Endorsements Date.
K-,
.~
WO# 462410-01 R/R# 06-02-0058 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
- 1. Owner CP&L dba Proaress Enerav Date 06/15/2006 Name P.O. Box 1551, Raleigqh, N.C. 27602-1551 Address
- 2. Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd.. New Hill. N.C. 27562-0165 Sheet 1 of 2 Unit 1 WO# 462410-01 Address
- 3. Work Performed By Progress Energy_
Name 5413 Shearon Harris Rd.. New Hill. N.C. 27562-0165 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A Address
.4. Identification of System CT - Containment Spray 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
ICT-26 Nuts Unknown N/A N/A None Unknown Replaced No I CT-26 Nuts Southern Fasteners N/A N/A None 2001 Replacement No 1CT-26 Studs Unknown N/A N/A None Unknown Replaced No 1CT-26 Studs Nova N/A N/A None 2005 Replacement No
- 7. Description of Work: Replace studs and nuts
- 8. Tests Conducted: Hydrostatic E] Pneumatic El Nominal Operating Pressure [l Other E] Pressure___psi TestTemp.
2F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 462410-01 R/R# 06-02-0058 0
FORM NIS-2 (Back)
-2
- a.
- 9. Remarks Applicable Manufacturer's Data Reports to be attach'ed..
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or~replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Signed l~i (r-rd~riinftrr Expiration Date N/A Date
/*-*(..)6 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut h ve ipspected the components described in this Owner's Report during the period of 4/28/2005 to.,
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
- 'O*
07,&,"*
Commissions NC 1507, ABIN NS
ý V*spector's Signature National Board, State, Province, and Endorsements Date 1,0d*
K>
4 1
WO# 458295-01 R/R# 06-02-0125 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner
-CP&L dba Proaress Eneray Date 06/15/2006 2.
3.
Name P.O. Box:1551, Raleigh, N.C. 27602-1551 Address Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Sheet 1 of 2 Unit 1 WO# 458295-01 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System CS - Chemical Volume Control 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No) 3SW1.5-168SB-1 Unknown None 64 None Unknown Replaced Yes 3SW1.5-168SB-1 Dubose National Energy 187461 NA 455374 1993 Replacement No Services 187461___A_455374 19_eaem't N
- 7. Description of Work: Replace piping to cooler 1CS-CSIP
- 8. Tests Conducted: Hydrostatic ]
Pneumatic [
Nominal Operating Pressure [
Other [] Pressure _psi Test Temp..___F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 458295-01 R/R# 06-02-0125 FORM NIS-2 (Back)
- 9. Remarks Code Case N-416-2 used Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE.
We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed ISI Coordinator Date 4Z*.2.
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut haye igspected the components described in this Owner's Report during the period of 9/15/2003 to,,&,AA$,t.
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions NC 1507, ABIN NS In ec rSsignature National Board, State, Province, and Endorsements Date--,74
WO# 445179-01 R/R# 06-02-0138 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner CP&L dba Progress Energy Name Date 07/26/2006 2.
3.
P.O. Box 1551, Raleicqh, N.C. 27602-1551 Address Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Sheet l of 2 Unit 1 WO# 445179-01 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System MS - Main Steam 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None' Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989, Addenda N/A-
- 6. Identification of Components Repaired or R6placed and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No) 1 MS-44 Crosby N57374-01-0006 834 None 1980 Replaced Yes 1MS-44 Crosby N57374-O0-0018 856 None 1980 Replacement Yes Stud Unknown N/A N/A None Unknown Replaced No Stud T&T Enterprises N/A N/A ABK 1998 Replacement No Nut Unknown N/A N/A None Unknown Replaced No Nut Nova N/A N/A 2G3E1 2002 Replacement No
- 7. Description of Work: Replace safety valve
- 8. Tests Conducted: Hydrostatic E] Pneumatic El Nominal Operating Pressure Z Other [] Pressure
.___psi Test Temp.
°F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 445179-01 R/R# 06-02-0138 FORM NIS-2 (Back)
- 9. Remarks Form NV-1 attached Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE*.
We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code, Section Xl.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A ISI Coordinator Date 7,/2Ie/2 Sinned v
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance CompanV of Connecticut of Hartford, Connecticut havy in pected the components described in this Owner's Report during the period of 5/2/2006 to Z/Ž-.
/
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
__(___
Commissions NC 1507, ABIN NS J
Inspector's Signature National Board, State, Province, and Endorsements Date 7//04
WO# 447876-01 R/Rff 06-02-0140 Lb
£;:
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
- 1. Owner CP&L dba Prowress Enerqy Date 06/27/2006 Name 2.
3.
P.O. Box 1551, Raleigh, N.C. 27602-1551 Address Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Sheet 1 of 2.
Unit 1 WO# 447876-01
.Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Address A..dres "Expiration Date N/A
- 4. Identification of System MS - Main Steamr 5
(a) Applicable Construction Code ASME Section II1 1974 Edition, Winter 1976 Addenrda, None Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989
, Addenda NIA
- 6. Identification of Components Repaired or Replaced and Replacement Components Repaired.
ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No) 1MS-45 Crosby N57374-01-0001 829 None 1980 Replaced Yes 1 MS-45 Crosby N57374-00-0009 837 None 1980 Replacement Yes
- 7. Description of Work: Replace safety valve
- 8. Tests Conducted: Hydrostatic [] Pneumatic E] Nominal Operating Pressure 0 OtherE] Pressure psi Test Temp. _
F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 o WO 447876-01 R/R9 06-02-01f406 FORM NIS-2 (Back)
- 9..Remarks,iJr-/ p
/eAI Aniplicable Manufacturer's Data Reports to be attached.
A r-CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code, Section Xl.
Type Code Symbol Stamp N/A Gertificate of Authorization-No.-N/A.
Expiration Date N/A' -.
Signed:
4,
-,', J ISI Coordinator Date 74- ?
6 Owner or Owner's Designee, Title
.. -1 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have ijspected the components described in this Owner's Report during the period of 5/2/2006 to Z4/ 4 A.y..,
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions NC 1507, ABIN NS ns*,ctor's Signature National Board, State, Province, and Endorsements Date
~14d
~
'.}. i~
I r
CROSBY VALVE a
GAGE COMPANY CRQ 3 WR ENTHAM, MASS FEJ)RM NV-I rOR'SAF8:TY AN' 4tArE:TYUF;I.IIP VAI.VF*.S As. requizred byv tle I'fovI~iamns! 44? I.
AWEF Coil. Rtubs!
O.C.-44C DATA IREPOIRT Saft~v and Safely Iteh(.f Valves ro;v. V
.. _v
& Gj __C j.,
3_Ke.ndrick
.L._
ren tha!pn,.._HA 0209.3 N-u11'r and Afldlri%s HA\\
. N4064) ot
... 11/28/73 "
Pr o
- .t-'.",.
r(c~r Contraict DIU !t.
1.,
1*.' Ima rdl No..f37 Fbasco Services Inc..
2 Rector St.,
- .-..~
-,. Room 840, New York, New York NY-435038 Carolina Power & L.ight - Shearon Harris Nuclear Power Plant Name and Addless New 1111, Wake County N. CaroLina
, :-.'. *...:A, :' 11;ýIit -
\\1,r 4
~ 4 rII~,2N-R9SA-1 N! _irit
' 573174-00-0009 1rInN.D-C-57374 Rev.
I)
Rel 00 63
____--1L-90.13.
1b'/hr saxt 11
!ý
- 1. ;('~rr 57 S.P I S5.)
- I/'.
2 ~
tOL21971 A.ed~TU Wintcr 1972 i..K'72q5-32-0001 N572 () 9 - 4~: -0198H Nqflq0q-32-001 3
- 9091 7-33-0015 N 90087-52-nl3!,!
N90911-32-001 1 N91 167-31-0001 N909 I 0008 N93335-3!,-0085 893895-60-0341I ASME ASME S~A 10 5 ASME SA193 Gr. B6 A!XE SA182 Gr. F31.6 ASE SA182 Type 316 ASME SA105 ASHE SA193 Gr. B6 A-*.M...SAI 93..Cr.
11.6 11 i
I _________
,,' *"'/'t
,,*,0 0
42.Si K5729532-000 41S.:m, K514-5-21noo'
- e. ozler VIINm,...
i
' h
- ~.S~'m Bot nnt Stud Bonnet Nut NX2_780-L'O87 A` N't I A 6 11-7.~
~90l3ASME SA193 Gr.
B7 1490914s ASflE SA194 C..211 1490915 ASM' SA193 Ci'.
Vl a
in-li t Stud
_n
.iL/~/Z...
~
Cro;by Valve &
Co;~(:.
Cer:lficalv:
-if Atithi:riza,:n..'~,
1.878 trb r 30, 19801 0
C e
CERTIFICATE O)F Sli'~Kp
- -O I re-, tre Vf's~seI Wif'P(:t('ts aind tbeL State (I I:,.inc. 'aif___
Factory IMtjlS~e-itjrod nl!.
ins~iecir'd the equimJuent flescrailici in thin:: Data. Reji'.ra im..
~
'.~.5:,.
11-M mint
!,, -'.:da nv with 2 h 31;icn
.W m':l:
I
) stmh,
. -.*.' s (I.
5*~
i It.%.Iys gm lIit:u t Ii, s er I f ica [e. niz l'.!.h r tile
-I '-md !;...I'
- (:. -1.-*
t T.'
the.inspIc~tor nt.r hisa cmuisic.-er sialI 1:e' ltaI.* ;:; ;,~~"':av for :mn%..-..
~
i!Iiog o a lims of an' *:icid alImlmi frism' (it c nn ic -t'C: b:m ! Ih
- z j
IL2AL
'i::.'n',4ii~u~i~
1ZZ~7I 0
- Arktjright-..Ioustoz Manufacturer.,; Mutual Nsrfl;ince (:o~mwiny
- Mutil Boiler & Mach1inery Division.
WO# 224489-01 R/R# 06-02-0141 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
- 1. Owner CP&L dba Progress Energqy Name P.O. Box 1551. Raleigh, N.C. 27602-1551 2.
3.
Address Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Date 06/12/2006 Sheet 1 of 2 Unit 1 WO# 224489-01 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System Charging System 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No) 1CS-750 disk Unknown Unknown N/A Unknown Unknown Replaced No 1CS-750 disk FlowServe 14332-10 N/A 07350 2006 Replacement No
- 7. Description of Work: Replaced valve disk
- 8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operation Pressure 12 Other El Pressure ___ psi Test Temp. _
F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet in numbered and the number of sheet is recorded at the top of this form.
Sheet 2 of 2 WO# 224489-01 R/R# 06-02-0141
'FORM NIS-2 (Back).
- 9. Remarks /9ow7*
e..
Applicable Manufacturer's'Data Reports'to0be attached'.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A
- .<.----*,e.,*
_ISI Coordinator Expiration Date N/A Date 6,/
,0 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of il=,!
tooO, to re.a,
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or nnected with this inspection.
A,
ý2 w -Commissions NC 1507. ABIN NS
- ,..ji National Board, State, Province, and Endorsements
.1
'I/
//
FORM N-2 CERTIFICATE HOLDERS' DATA REPORT FOR IDENTICAL NUCLEAR PARTS AND APPURTENANCES*
As Required by the Provisions of the ASME Code,Section III Not to Exceed One Day's Production Pg. 1 of 2
- 1.
Manufactured and certified by Flowserne Corporation/ 1900 South Saunders Street, Raleiih NC 27603 (Name and Address of NPT Certificate Holder)
- 2.
Manufactured for Progress Energv Carolinas, Inc/ PO Box 870 Raleigh,. N.C. 27602 (Name and Address of Purchaser)
- 3.
Location of Installation CP&L CENTRAL RECV & DED FAC /5413 Shearon Harris Rd. Zone 17A, New Hill, N.C. 27562 (Name and Address)
- 4.
Type:
SII-D-9957BW16-(I)
ASME SA479 N/A N/A 2006 Rev. A (drawing no.)
(natl. spec. no.)
(tensile strength)
(CRN)
(year btalt)
- 5.
ASME Code,Section III, Division 1:
1974 Sumnmer, 1976 1
N/A (ediion)
(addenda date)
Idass)
(Code Case no.)
- 6.
Fabricated in accordance with Const. Spec. (Div. 2 N/A Revision N/A Date N/A only) only)
(no.)
- 7.
Remarks:
Disk for 1 1/2" & 2" 15001/ Y PATTERN PACK-LESS GLOBE VALVE S.0. 371 69 8.
9.
Nom. Thickness (in.)
N/A Min. design thickness (in.)
PER#4 Dia. ID (ft & in.)
NIA When applicable, Certificate Holders' Data Reports are attached for each item of this report:
Length overall (ft & in.)
N/A Part or Appurtenance National Serial Number Board No.
In Numerical Order (2) 14332-10 N/A (5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
(24)
(25)
Part or Appurtenance National Serial Number Board No.
In Numerical Order (26)
(27)
(28)
(29)
(30)
(31)
(32)
(33)
(34)
(35)
(36)
(37)
(38)
(39)
(40)
(41)
(42)
(43)
(44)
(45)
(46)
(47)
(48)
(49)
(50)
Design pressure psi.
lemp.
F.
Hydro. Test pressure N/A At temp. 'F
.Supplemental information in form of lists, sketches or drawings may be used provided (1) size is 8-1/2" x 11'. (2) information in items 2 and 3 on this Data Report is included on each sheet. (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
7
/
/
FORM N-2 (Back-Pg. 2 of 2)
Certificate Holder's Serial Nos. 14332-1 CERTIFICATION OF DESIGN Design specification certified by R.C Rossi P.E. State NC
'Reg. no.
11504 Design Report certified by P.E. State Reg. no.
CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and that this (these)
PARTS Conforms to the rules of construction of the ASME Code,Section III, Division 1.
NPT Certificate of Authorization N1563 Expires 11/26/2006 No.
Date z Name Flowserve, Corporation Signed-,
(NPT C,**ikate HlAder)
(a-hmized repesentatie)
CERTIFICATE OF INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSB CT of Hartford, Connecticut have inspected these items described in this Data Report on 7-1 I C-?.-
, and state that, to the best of my knowledge and belief, the Certificate Holder has fabricated these parts or appurtenances in accordance with the ASME Code,Section III, Division 1. Each part listed has been authorized for stamping on the date shown above.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the equipment described in this Data Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with thi ion.
Date 2-1c;:
Eo..
- 'Signed
.Commissions at C /
aZ.
X(Authoried Irnpedtor)
(Nar 13d. (~id. Endorsements) and state. prv.and n.
12)
6 WO# 307816-01 R/R# 06-02-0145 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner CP&L dba Proqress Enerqv Name P.O. Box 1551. Raleilh. N.C. 27602-1551 Address
- 2. Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Date 06/14/2006 Sheet 1 of 2 Unit 1 WO# 307816-01 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A Address
- 3. Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill. N.C. 27562-0165 Address
- 4. Identification of System Fire Protection 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No) 1 FP-347 huts Unknown N/A N/A N/A Unknown Replaced No 1FP-347 nuts Dubose National Energy N/A N/A NIA 1992 Replacement No Services 1 FP-347 studs Unknown N/A N/A N/A Unknown Replaced No 1 FP-347 studs Nova N/A N/A N/A 2000 Replacement No
- 7. Description of Work: replace studs and nuts
- 8. Tests Conducted: Hydrostatic E] Pneumatic El Nominal Operating Pressure El Other [] Pressure ___psi Test Temp. _
F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 307816-01 R/R# 06-02-0145 FORM NIS-2'(Back)
K>
- 9. Remarks.
Applicable Manufacturer's-po to be att Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or~replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A I-ql (nnrr1inntnr Expiration Date N/
Date
'/,*4O 6 Signed"!
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut havy ins ected the components described in this Owner's Report during the period of 9/13/2002 to 11 4L'
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions NC 1507, ABIN NS Jnslictor's Signature National Board, State, Province, and Endorsements Date A
U
WO#f 683981-01 R/R# 06-02-0146 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner CP&L dba Progress Energy Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Address
- 2. Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Date 06/14/2006 Sheet 1 of 2 Unit 1 WO# 683981-01 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A Address
- 3. Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address
- 4. Identification of System CS - Chemical Volume Control 5
(a) Applicable Construction Code ASME Section III 1974 Edition,. Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufaclurer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
CS-H-2609 nuts Unknown N/A N/A None Unknown Replaced No CS-H-2609 nuts Coloc Industries N/A N/A None Unknown Replacement No
- 7. Description of Work: Replace lock nuts
- 8. Tests Conducted: Hydrostatic El Pneumatic E] Nominal Operating Pressure El Other El Pressure _.psi Test Temp.
____F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 683981-01 R/R# 06-02-0146 FORM NIS-2 (Back)
- 9. Remarks Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Sign 14 Expiration Date N/A Date 64 Z,
(a IC1 rn er;nn#^r Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of !Y/-, V1/d, to A. L
_, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
- F 0Commissions NC 1507, ABIN NS lnt.,
Ks-ignature National Board, State, Province, and Endorsements Date K)
WO# 684258-01 R/R# 06-02-0147 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
- 1. Owner CP&L dba Progress Energy Name Date 06/15/2006 2.
3.
P.O. Box 1551, Raleigh, N.C. 27602-1551 Address Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New, Hill, N.C. 27562-0165 Address Sheet 1 of 2 Unit 1 WO# 684258-01 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date NIA
- 4. Identification of System CS - Chemical Volume Control 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
CS-H-2820 nuts Unknown N/A N/A None Unknown Replaced No CS-H-2820 nuts Coloc Industries N/A N/A None Unknown Replacement No
- 7. Description of Work: Replace lock nuts
- 8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operating Pressure El Other E] Pressure _
psi Test Temp.
°F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of2 2 WO# 684258-01
,!I:~~~~........
,......::.:._r;,-:i
-:.'..........v
-..,RR 0-2 14 I
n...
R/R# 06-02-0147 FORM NIS-2 (Back).
- 9. Remarks Applicable Manufacturer's Data Reports to be attaghed.
"A CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replaerrient &onforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Signed
- 4" Expiration Date N/A tor Date 6_/1
-. c20i6 iSI Coordinat Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut haveinspected the components described in this Owner's Report during the period of 4/24/2006 to J/514.
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
_______,_Commissions NC 1507, ABIN NS spqttor's Signature National Board, State, Province, and Endorsements
~%-g
- d....
WO# 683983-01 R/R# 06-02-0148 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner CP&L dba Prowress Enermy Name P.O. Box 1551, Raleiqh, N.C. 27602-1551 Address
- 2. Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd.. New Hill, N.C. 27562-0165 Date 0611512006 Sheet 1 of 2 Unit 1 WO# 683983-01 Address
- 3. Work Performed By Progress Energy Name 5413 Shearon Harris Rd.. New Hill. N.C. 27562-0165 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A Address
- 4. Identification of System CS - Chemical Volume Control 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
CS-H-1 426 nuts Unknown NIA N/A None Unknown Replaced No CS-H-1426 nuts Coloc Industries N/A N/A
'None Unknown Replacement No
- 7. Description of Work: Replace lock nuts
- 8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operating Pressure El Other E] Pressure ___psi Test Temp.
QF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 683983-01 R/R# 06-02-0148 19 FORM NIS-2 (Back)
- 9. Remarks
.Applicable Manufacturer's Data Reports to be attached.'
CERTIFICATION OF COMPLIANCE.
We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Signed Owner or Owner's Designee, Title ISI Coordinator Expiration Date N/A Date 4 ztýý 49 6 r
I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut havy inspected the components described in this Owner's Report during the period of 4124/2006 to 441.,ng
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
(9 Commissions NC 1507, ABIN NS SInsp-tor's Signature National Board, State, Province, and Endorsements DateA
Sa 10 I
WO# 844649-01 R/R# 06-02-0149 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of tfle ASME Code Section XI
- 1. Owner CP&L dba Progress Enerqy Date 06/15/2006 2.
3.
Name P.O. BOx 1551, Raleiqh, N.C. 27602-1551 Address Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Sheet 1 of 2 Unit 1 WO# 844649-01 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System BD - Steam Generator Blowdown 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
BD-H-0589 nuts Unknown N/A N/A None Unknown Replaced No BD-H-0589 nuts Coloc Industries N/A N/A None Unknown Replacement No
- 7. Description of Work: Replace lock nuts
- 8. Tests Conducted: Hydrostatic E] Pneumatic El Nominal Operating Pressure El Other E] Pressure __psi Test Temp.
2F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
0 Sheet 2 of 2 WO# 844649-01 R/R# 06-02-0149 FORM NIS-2 (Back)..
- 9. Remarks Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Signed Expiration Date N/A ISI Coordinator te_ 6 Z'*,/6-o Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut havq insl0ected the components described in this Owner's Report during the period of 5/2/2006 to j/'t
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
2,_
Commissions NC 1507, ABIN NS aJnsp-tor's Signature National Board, State, Province, and Endorsements Date
__/___
U
V 1g.
WO# 684256-02 R/R# 06-02-0150 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
- 1. Owner CP&L dba Proqress EneMy Name Date 06/15/2006 2.
3.
P.O. Box 1551, Raleigh, N.C. 27602-1551 Address Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Sheet 1 of 2 Unit 1 WOf 684256-02 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System CS - Chemical Volume Control 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None__ Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
,Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
CS-H-3193 nuts Unknown N/A N/A None Unknown Replaced No CS-H-3193 nuts Coloc Industries N/A N/A None Unknown Replacement No
- 7. Description of Work: Replace lock nuts
- 8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operating Pressure El Other E] Pressure..
psi Test Temp.
-F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 684256-02 R/R# 06-02-0150 FORM NIS-2 (Back)
- 9. Remarks Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair.or replacement ASME Code,Section XI."
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Date e,),
Sinned IRI r.nnrrlinntnr v,*;j, Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut havy inspected the components described in this Owner's Report during the period of 4/26/2006 to
&/A3 &
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions NC 1507, ABIN NS SSignature National Board, State, Province, and Endorsements Date
&1=1/6.
K-,
b ~'
WO# 417764-02 R/R# 06-02-0152 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.. Owner
.CP&L dba Progress Energy Name
-Date 06/16/2006 2.
3.
P.O. Box 1551, Raleigh, N.C. 27602-1551 Address Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Work Performed By Progress EnergY/y Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Sheet 1 of 2 Unit 1 WO# 417764-02 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System CS - Chemical Volume Control 5
(a) Applicab!e Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No) 1CS-CSIPC007 Unknown None 64 None Unknown Replaced Yes piping_
1CS-CSIPC;007 Dubose National Energy 187461 N/A 455374 1993 Replacement No piping Services 1N51e n
- 7. Description of Work: Replace piping on oil cooler
- 8. Tests Conducted: Hydrostatic El Pneumatic E] Nominal Operating Pressure [
Other E] Pressure ____psi Test Temp.
-_F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 417764-02 R/R# 06-02-0152 FORM NIS-2 (Back)
- 9. Remarks Code Case N-416-2 used Applicable Manufacturer's Data Reports to be attached:
CERTIFICATION OF COMPLIANCE-We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair orsreplacement..
ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A r
Date 51Zm c
Signed z', Qe-ISI Coordinato Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut havpe ipected the components described in this Owner's Report during the period of 2/12/2004 to 20_k. d, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
c7'iM4L,,
Commissions NC 1507, ABIN NS
.!- IpEtor's Signature National Board, State, Province, and Endorsements Date
/
A"4
WO# 417768-01 R/R# 06-02-0153 0
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the'ASME Code Section Xl
- 1. Owner CP&L dba Progress Energy
-Name Date 06/16/2006.
-P.O. Box 1551, Raleigh, N.C. 27602-1551 Address 2.-Plant Shearon Harris Nuclear Power Plant Sheet 1 of 2.
Unit 1 WO# 417768-01 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address 3.
Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System CS - Chemical Volume Control 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No) picspinPC:009 Unknown None 64 None Unknown Replaced Yes piping______
1CS-CSIPC:009 Dubose National Energy 187461 NIA 455374 1993 Replacement No piping Services 187_61___
4 419 Rea nt N
- 7. Description of Work: Replace piping on oil cooler
- 8. Tests Conducted: Hydrostatic El Pneumatic El Nominal Operating Pressure [
Other [3 Pressure ____psi Test Temp. _
F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
V?
Sheet 2 of 2 WOH 417768-01 R/R# 06-02-0153 FORM NIS-2 (Back)
- 9. Remarks Code Case N-416-2 used Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Date
/6/-!ý I~l flnnrdin~tnr Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut havensgected the components described in this Owner's Report during the period of 2/16/2004 to
/d
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions NC 1507, ABIN NS
,)nsV:&tor;sSignature National Board, State, Province, and Endorsements Date A0,
WO# 683979-01 R/R# 06-02-0172 t*
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner CP&L dba Progress Enerqy Date 06/30/2006 2.
3.
Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Address Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Sheet 1 of 2 Unit 1 WOf* 683979-01 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System SW - Service Water 5
(a) Applicable Construction CodeASME Section III 1974 EditionWfnter 1976 Addenda, N6ne Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built
-Or Replacement (Yes or No) 1SW-H-178 Progress Energy N/A NIA None 2006 Repaired No 1SW-H-2034 Progress Energy N/A N/A None 2006 Repaired No 1SW-H-2035 Progress Energy N/A N/A None 2006 Repaired No 1SW-H-2038 Progress Energy N/A N/A None 2006 Repaired No
- 7. Description of Work: Modify supports in accordance with EC 60449
- 8. Tests Conducted: Hydrostatic Ii Pneumatic E] Nominal Operating Pressure El Other El Pressure.
psi Test Temp.
F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 683979-01 R/R# 06-02-0172 0
FORM NIS-2 (Back)
- 9. Remarks
.Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this repair-coriforms to the'rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of-Authorization No.:N/A.................-..
.Expiration Date N/A.
Signed
-'---t--,
1 ISI Coordinator Date 1C.c Ownrer or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut havQ irjspected the components described in this Owner's Report during the period of 4/25/2006 to 7/./Z &,
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and.corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions NC 1507, ABIN NS
-np~or's Signature National Board, State, Province, and Endorsements Date
- ,/
Q~ I
0 e
WOf# 779141-01 R/R# 06-02-0158 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner CP&L dba Progress Energy Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Address Shearon Harris Nuclear Power Plant Date 06/23/2006 Sheet 1 of 2 Unit 1 WO# 779141-01
- 2. Plant Name 5413 Shearon Harris Rd.. New Hill. N.C. 27562-0165 Address
- 3. Work Performed By Progress Energy Name 5413 Shearon Harris Rd.. New Hill. N.C. 27562 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A
!-0165 Authorization No. N/A Expiration Date N/A Address
- 4. Identification of System CS - Chemical Volume Control 5
(a)'Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, Nonre Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No) 1 CS-752 Unknown Unknown Unknown None Unknown Replaced Yes 1CS-752 Velan 5429 364 None 1981 Replacement Yes
- 7. Description of Work: Replace valve
- 8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operating Pressure M Other El Pressure ___psi Test Temp.
QF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 779141-01 R/R# 06-02-0158.-
FORM NIS-2 (Back)
- 9. Remarks Manufactures data report attached.
Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Signed
- -e-4
.<e Owner or Owner's Designee, Title 11 Coordinator Expiration Date N/A Date 1
00 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National'Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut havq ins cted the components described in this Owner's Report during the period of 4/17/2006 to 4/',p 70*g
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
___ 2
__Al.
Commissions NC 1507, ABIN NS
. I Iniectors Signature National Board, State, Province, and Endorsements K.-~
Date
WO#f 686993-05 R/R9 06-02-0161 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner CP&L dba Progress Energy
- 1. Owner CP&L dba Progress Ener-qy Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Address
- 2. Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd.. New Hill, N.C. 27562-0165 Address
- 3. Work Performed By Progress Energy Date 06/23/2006 Sheet 1 of2 Unit 1 wo# 686993-05 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Authorization No. N/A Expiration Date N/A
- 4. Identification of System CS - Chemical Volume Control 5
(a) Applicable Construction Code AS ME Section Iii 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components Repaired.
ASME Code Name of Name of MIrnufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
Lock nut Unknown N/A N/A None Unknown Replaced No Lock nut Coloc N/A NIA None 2001 Replacement No
- 7. Description of Work: Replace lock nuts
- 8. Tests Conducted: Hydrostatic E] Pneumatic ii Nominal Operating Pressure Ii Other E] Pressure
_psi Test Temp. _
F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
a Sheet 2 of 2 WOU 686993-05 R/R# 06-02-0161 FORM NIS-2 (Back)
- 9. Remarks Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code, Section Xl.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Signed
-e__
Owner or Owner's Designee. Title Expiration Date NIA Date X>-
z e
SIS Coordinator Drdinator CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 9127/2005 to 7/.1
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising fr m or connected with this inspection.
, 117r Commissions NC 1507, ABIN NS
-spector's Signature National Board. State, Province, and Endorsements Dale
WO# 686993-01 RIRff 06-02-0162 3 o0 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
- 1. Owner CP&L dba Proaress Enerav Name P.O. Box 1551. Raleiah. N.C. 27602-1551 Address
- 2. Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address
- 3. Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill. N.C. 27562-0165 Date 06/23/2006 Sheet 1 of 2 Unit 1...
WOlf 686993-01 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A Address
- 4. Identification of System CS - Chemical Volume Control 5
(a)Applicable Construction CodeASME SectionIlli 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No) 1 CS-752 valve Unknown Unknown Unknown N/A Unknown Replaced Yes disc 1CS-752 valve Unknown Unknown Unknown N/A Unknown Replacement Yes disc
- 7. Description of Work: Replace valve disk
- 8. Tests Conducted: Hydrostatic El Pneumatic El Nominal Operating Pressure I]
Other [] Pressure.
psi Test Temp.
°-F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
0 Sheet 2 of 2 WO# 686993-01 R/R# 06-02-0162
'FORM NIS-2(Back)
'7"
- 9. Remarks Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Ceirtifiate-of Authorization No. N/A Signed Expiration' Date N/A ISI Coordinator Date
.L,/
Z a/ 6...
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut. have inspected the components described in this Owner's Report during the period of 9/27/2005 to W"
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
,2AU
,,.b Commissions NC 1507, ABIN NS National Board, State, Province, and Endorsements
o v.
WO# 736719-01 R/Rff 06-02-0163 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
- 1. Owner CP&L dba Proaress Enerav Date 06/2312006 Name 2.
P.O. Box 1551, Raleigh, N.C. 27602-1551 Address Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Sheet 1 of2 2
Unit 1 WO# 736719-01
- 3. Work Performed By Progress Energy Name 5413 Shearon Harris Rd.. New Hill' N.C. 27562-0165 Repair Organization P.O. No., Job No.,-etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A Address
- 4. Identification of System CC - Component Cooling Water 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI UJtilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No) 1CC-CCWA Pacific Pump 49865 49273-72091-AD unknown Replaced No Inboard seat plate PacifimpIGHG 79Uo epd 10C-CCWA*
Inboard seal plate Pacific Pump unavailable D15535
- 72091-15-AO Unknown Replacement No 1CC-CCWA Outboard seal Pacific Pump 49872 49273 72091-12-AL Unknown Replaced No plate ITG41 1CC-CCWA Outboard seal Pacific Pump 49871 49273-rTG4 72091-9-Al Unknown Replacement No plate
- 7. Description of Work: Replace inboard and outboard seals plates
- 8. Tests Conducted: Hydrostatic El Pneumatic [I Nominal Operating Pressure [
Other El Pressure psi Test Temp. _
F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 736719-01 RIR# 06-02-0163 FORM NIS-2 (Back)
- 9. Remarks Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement coniorms to the rules of the*
repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Date
"-7. //o/v ISI *oordinator Sinned.
v Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut havy9 ispected the components described in this Owner's Report during the period of 7/25/2005 to TAI/A
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
61
,*Commissions NC 1507, ABIN NS J
Inspector's Signature National Board, State, Province, and Endorsements Date 7//.&
o
WON 680761-01 R/Rft 06-02-0170 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner CP&L dba Proaress Energy Date 06/27/2006 2.
3.
Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Address Plant Shearon Harris Nuclear Power Plant Name.
5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Sheet 1 of 2 Unit 1 WO4 680761 -01 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Address.
.Expiration Date N/A
- 4. Identification of System CS - Chemical Volume Control 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of"Section Xl Utilized for Repairs or Replacements 1989, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No) 10S-284 Unknown Unknown Unknown None Unknown Repaired Yes
- 8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operating Pressure [
Other [] Pressure
.psi Test Temp.
917 NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of2 2 WOl# 680761-01 R/R# 06-02-0170 FORM NIS-2 (Back)
- 9. Remarks Applicable Manufacturer's Data Reports to be attached.
-CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this repair conforms to the rules of the*
repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A
- Certificate of Authorization No. N/A Expiration Date N/A Signed Ie4
- S,,
I1 Coordinator Date
"..,.)
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut haveirspected the components described in this Owner's Report during the period of 4/26/2006 to 7/1/-
A I,,
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions NC 1507, ABIN NS
-rns-ctor's signature National Board, State, Province, and Endorsements Date 14
a c4 g 0 WO# 633285-01 R/R# 66.-0,;Z -0/-7.9' FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
- 1. Owner CP&L dba Prooress Enerav Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Address
- 2. Plant. Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd.. New Hill. N.C. 27562-0165 Date 07/19/2006 Sheet 1 of 2 Unit 1 WO# 633285-01 Address
- 3. Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System 2060-Chemical and Volume Control 5
(a) Applicable Construction Code ASME Section III1974 Edition. Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Re'placed and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
Valve Copes Vulcan Model D-166123 None lCS-7 1980 Replaced Yes Valve Copes Vulcan Model D-166123 None lCS-7 1980 Replacement Yes
- 7. Description of Work: Replace Valve Trim for Valve Repair
- 8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operating Pressure M Other E] Pressure
.psi Test Temp.
OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8t/2 in. X 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
0 Sheet 2 of 2 WO# 633285-01 R/R#
FORM NiS-2 (Back)
- 9. Remarks Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this repair conforms to the rules of the repair or replacement ASME Code, Section Xl.
Type Code Symbol Star A
Certificate o thor tion No1 *NA Expiration Date N/A Signed I Coordinator Date 07/19/2006
-Oner or ler's Den e, Title CE"IýTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 4/30106 to 7/7/06, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
___--__Commissions NC 1507, ABIN NS
(
Inspector's Signature National Board, State, Province, and Endorsements Date 0711912006
0 WO# 685088-03 R/R# 06 - 0.2 -0/I?"
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
- 1. Owner CP&L dba Progress Energy Name P.O. Box 1551, Raleigh, N.C. 27602-1551
.Address
- 2. Plant Shearon Harris Nuclear Power Plant Date 0711912006 Sheet I of 2 Unit.1 WO# 685088-03 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address
-3. Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp NIA Authorization No. NIA Expiration Date N/A 4.
5 6.
Identification of System 3065 - Auxiliary Feedwater (a) Applicable Construction Code ASME Section III 1974 Edition-Summer '76 Add, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced.
Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
Hanger Coloc Industries None None 73286296 1980.
Replaced No Hanger Coloc Industries None None 73286296 1999 Replacement No
- 7. Description of Work: Replaced Coloc Nuts on Hanger
- 8. Tests Conducted: Hydrostatic [] Pneumatic LI Nominal Operating Pressure EL Other E] Pressure..
psi Test Temp.
OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
- ° Sheet 2 of 2 WO# 685088-03 R/R#
FORM NIS-2 (Back)
- 9. Remarks Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate olAultiion.
N/A Signed-A I ISI Coordinator Expiration Date N/A Date 07/1912006
%1 -v "~Owner or'15wner'(lesinee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 4/30/06 to 7/17106, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions NC 1507, ABIN NS
, 1 Inspectors Signature National Board, State, Province, and Endorsements Date 07119106
WO# 205083-01 R/R9 6 -0o2 -
.VP/CY FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
- 1. Owner CP&L dba Progress Enerqy Name Date 07/22/2006 2.
3.
P.O. Box 1551, Raleigh, N.C. 27602-1551 Address Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address She6t 1:of 2 Unit 1 WO# 205083-01 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date NIA
- 4. Identification of System 3020- Main Steam 5 (a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
Valve ccl None None 1 MS-62 1980 Replaced Yes Valve ccl 138165 None None 1998 Replacement No
- 7. Description of Work: Replaced plug assembly in valve
- 8. Tests Conducted: Hydrostatic E] Pneumatic El Nominal Operating Pressure [
Other E] Pressure __psi Test Temp.
-_ F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 205083-01 R/R#
FORM NIS-2 (Back)
J
- 9. Remarks Form N-2attached.
Applicable Manufacturer's Data Reports to be atta6hnd.
CERTIFICATION OF COMPLIANCE.
We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol S
/A Certificate zution
. N/A Signee d
i
,-A (A
I.
- r'rr7'A
,n r'*
f o trif*
"__Expiration Date N/A ISI Coordinator En TitI.
Date 07/24/2006 i
- biW~-r~nrsi CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 10/30/04 to 7/22/06
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
____,________-_Commissions NC 1507, ABIN NS J
Inspector's Signature National Board, State, Province, and Endorsements Date n7/I94!9flAn
Form N-2 FORM N-2 CERTIFICATE HOLDERS' DATA REPORT FOR IDENTICAL NUCLEAR PARTS AND APPURTENANCES*
As Required by the Provisions of th ASME Code,Section III Not to Exceed One Day's Production Pa. 1 of 2
- 1. Manufactured and certified by C C I, 22591 Avenida Empresa, Rancho Santa Margarita. CA 92688 (name and address of Certificate Holder)
- 2. Manufactured for' "CAROLINA POWER & LIGHT COMPANY, P.O. BOX 1551, RALEIGH, NC 27602 (name and address of purchaser)
- 3. Location of installation CAROLINA POWER & LIGHT. CRDF-H03, STATE RD 1134. NEW HILL NC 27562 (name and address)
- 4. Type 327100003 SA182-FI1 70.000 PSI (drawing no.)
(matl spec. no.)
(tensile strength)
- 5. ASME Code.Section III, Division 1:
1974 WINTER 1976 (edition)
(addenda date)
N/A (CRN) 2 (class) 1998 (year built)
N/A (Code Case no.)
Date N/A
- 6. Fabricated in accordance with Const. Spec. (div. 2 only)
N/A (no.)
ReA4on N/A
- 7. Rem-arks FOR ATMOSPHERIC DUMP VALVES' CCI PROJECT 100221. PRODUCTION ORDER 138165
- 8. Nom. thickness (in.)
2.685" Min.
design thickness 2.669' Dia. I D (M 9 In.)
2.63' Length overall (ft &
11.1" in.)
(n.)
- 9. When applicable, Certificate Holders! Data Rerports are attached for each item of the this report:
Part or Appurtenance National Serial Number Board No.
in Numerical Order (1.)
138165 N/A (2.)
(3.)______
(4.)
(5.)
(10.)
(17.)
(213.)__________
(25.)
(16.)
(17.)
(20.)
Pant or Appurtenance Serial Number National Board No.
in Nurhedcal Order (2M.)
(27.)
(28.)
(29.)
(30.)
(31.)
(32.)
(33.)
(34.)
(35.)
(36.)
(37.)
(38.)
(39.)
(40.)
(41.)
(42.)
(43.)
(44.)
(45.)
(46.)
(47.)
(48.)
(49.)
(50.)
- I.
+
+
- 10. Design pressure 1185 psi Temp.
600 Deg. F Hydro test pressure N/A at temp. Deg.
I
'Supplemental information in the form of lists. sketches, or drawings may be used provided (1) size is 8 112 x 11. (2) information in hems 1 through 4 on this DataReport is included on each sheet. (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
This form (E00037) may be obtained from the Order Dept.. ASME. 22 Law Drive. Box 2300. Fairfield. NJ 07007-2300.
Form N-Z FORM N-2 (Back - Pg. 2 of 2)
Certifcae Holders Serial No.
138165 Throug 138165 h
CERTIFICATE OF DESIGN Design Specification certified by ALGIRDAS CESNAVICIOS EP.F Slate NC Reg. no.
7549 Design Report
- certified by N/A P.E. Slate N/A Reg. no.
N/A (when applicable)
CERTIFICATE OF COMPUANCE We certify that the statements made in this report are correct and that this (these)
PLUG conforms to the rules of construction of the ASME Code. Section 11, Division 1.
NPT Certificate of Authorizaton N-2696 Expires JUNE 7,2003 No.
Date 0-7"_ b_..
Name CCI Sig (NPT Certificale Holder)
Moie prsntative)
CERTIFICATE OF INSPECTION I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of CALIFORNIA and employed by HARTFORD STEAM 8OILER INSPECTION AND INSURANCE COMPANY of HARTFORD. CONNECTICUT have inspected these items described in this Data Report on 17Z-27. Z" oe
, and state that to the best of my knovAedge and belief. the Certificate Holder has fabricated these parts or appurtenances in accordance wlAl ASME Section I11.
Divoin 1. Eacn part listed has been authotiied for stamping on the date shown above.
By signing this certificate. neither the Inspector nor his employer makes waranty. expressed or implied, concerning the equipment described in this Data Report. Futhermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage orJoss of any kind arising from or connected with this inspection.
Date
_______4D Signed_________
Commissions__1-?
(Autt~onzeo Inspector)
(Nat I 8d. (jrV;-ud&ng encXwsement) ancl state or prov, w4 no.)
WOP 680707-01 R/R# t96 -O 1;t FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
- 1. Owner CP&L dba Proqress Enerqy Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Address
- 2. Plant Shearon Harris Nuclear Power Plant Date 07/25/2006 Sheet 1 of 2 Unit 1 WOf11680707.01 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address
- 3. Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A Address
- 4. Identification of System 3010 - Steam Generator Blowdown 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
Pipe Southwest Fab None None 2BD4-7SN-1 1980 Replaced Yes Pipe U.S. Steel None None Heat # B86365 1999 Replacement No Sockolet Bonney Forge None None Heat P 468 2000 Replacement No
- 7. Description of Work: Replace Piping & Sock-o-let
- 8. Tests Conducted: Hydrostatic E] Pneumatic [] Nominal Operating Pressure [
Other E3 Pressure psi Test Temp. __.__F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/22 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 680707-01 FORM'NIS-2 (Back)
- 9. Remarks Code Case N-416-2 Applicable Manufacturer's Data Reports to.be attached.
CERTIFICATION OF COMPLIANCE '
We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol St N/A Certificate e r*b/!!.ation
. N/A Signed
/'"t4-)
Expiration Date N/A ISI Coordinator Date 07/25/2006 Owner or Owner's Dsign, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 4/21/06 to 7/25/06
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
, /2.,.,
Commissions NC 1507, ABIN NS Inspector's Signature National Board, State, Province, and Endorsements Date 07/25/2006
R/R# O6-oa; 20 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner CP&L dba Proqress Enerov 2.
3.
Name P.O. Box 1551, Raleigqh, N.C. 27602-1551 Address Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N4.C. 27562-0165 Address Date 07/25/2006 Sheet 1 'of 2 Unit 1 WO# 684264-02 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date NIA
- 4. Identification of System 3020 - Main Steam 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None. Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
Hanger Daniels Construction MS-H-92 None None 1980 Replaced Yes Stud T&T Enterprises None None Heat Code AQO 2001 Replacement No Lock Nuts Southern Fastners None None None 2004 Replacement No
- 7. Description of Work: Replace Studs and Nuts after Hanger removal/replacement
- 8. Tests Conducted: Hydrostatic E] Pneumatic [] Nominal Operating Pressure [
Other E] Pressure psi Test Temp. -IF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 684264-02 R/R#
FORM NIS-2 (Back)
- 9. Remarks Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the, repair or replacement ASME Code,Section XI.
Type Code Symbol S N/A.
Certificate ization No !NA Expiration Date N/A Signed IS Coordinator Date 07/25/2006 Owner or Owner's D;sianke. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 7/10/06 to 7/10/06
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
(La,-__,
Commissions NC 1507, ABIN NS J
)Kspector's Signature National Board, State, Province, and Endorsements Date (7/25/2006
0 WO# 684264-01 RIR#
60~
-o*33 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
- 1. Owner CP&L dba Progress Energy Name P.O.Box 1551, Raleigh, N.C7 27602-1551 Address
- 2. Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Date 07/26/2006 Sheet 1 of 2 Unit 1 WO# 684264-01 Address
- 3. Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A Address..,
- 4. Identification of System 3020 - Main Steam 5
(a) Applicable Construction Code ASME Section Ill 1974 Edition - Summer '76 Add, None Code Case, (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
,Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
Hanger Coloc Industries None None Part# 72614902 1980 Replaced No Hanger Coloc Industries None None 72614902 2001 Replacement No
- 7. Description of Work: Replaced Coloc Nuts on Hanger
- 8. Tests Conducted: Hydrostatic [] Pneumatic E] Nominal Operating Pressure El Other E] Pressure
_psi Test Temp. ____F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
a FORM NIS-2-(Bac'k)
Sheet 2 of 2 WO# 684264-01 R/R#
C.
- 9. Remarks Applicable Manufacturer's Data Reports to be attached.
- .
- i.
C.:
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol St N/IA Certificate o4 Aut rization
- o. N/A Sianed
- IAVe, t,
Expiration Date N/A ISI Coordinator Date 07/26/2006
- f
- -- O*er or Owner'*D*gnee, Title Own~er or Owne D9nee. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 4/25/06 to 7/10/06 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
(
,/
Inspector's Signature Date 07126/2006 Commissions NC 1507, ABIN NS National Board, State, Province, and Endorsements
f WO# 629850-01 R /R # 0 4 -OP, -O
-A,4 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
- 1. Owner CP&L dba Prociress Energy Date 07/27/2006 2.
Name 7
P.O. Box 1551, Raleigh, N.C. 27602-1551 Address Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Sheet I 'of 2 Unit 1 WO# 629850-01
- 3. Work Performed By Progress Energy Name 5413 Shearon Harris Rd.. New Hill, N.C. 27562-0165 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A Address
- 4. Identification of System 2085 - Low Head Safety Injection 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
Valve Crosby N56904-00-0056 None 1RH-7 1980 Replaced Yes Valve Plug Alloy Stainless lit Code EVR None Part# 72519832 1989 Replacement No Stud Nova None None HI.# 229801 1999 Replacement No Stud Guyon Alloys None None Ht# A19234 1986 Replacement No Heavy Hex Nut Nova None None Ht# G3967 2005 Replacement No Heavy Hex Nut Texas Bolt None None Ht# 852348 1990 Replacement No
- 7. Description of Work: Valve plug was replaced along with new studs and nuts
- 8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operating Pressure [
Other E] Pressure ___psi Test Temp.
OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
- 9. Remarks Sheet 2 of 2 WO# 629850-01 FORM NIS-2 (Back)*
... plicable Manufacturers Data Reports tobe...
Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code, Section Xl.
Type Code Symbol Stamp N/A Certificate o AuLI orriz~ioa"n No. N/A Expiration Date N/A ISI Coordinator Date 07127/2006 Sinned K
.A V
Owner or Owner'_ Djignee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of
-4/26/06 to 7/27/06, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
d., I Commissions NC 1507, ABIN NS J
t/
Inspector's Signature National Board, State, Province, and Endorsements Date 07127/2006
WOlf 462413-01 R/R#..-..-...-3, FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner CP&L dba Progress Energy Name P.O. Box 1551, Raleigh. N.C. 27602-1551 Date 05/18/2006 Sheet 1 of 2 Address
.2..Plant Shearon Harris Nuclear Power Plant
. -Unit 1 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165
" WO# 462413-01 Address
- 3. Work Performed By Progress Energy Name 5413 Shearon'Harris Rd., New Hill, N.C. 27562-0165 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A Address.
- 4. Identification of.System Containment Spray 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
Studs Unknown None None lCT-71 body to bonnet Unknown Replaced No
___"_studs Studs Dubose Natl Energy None None 1 CT-71 body to bonnet 1992 Replacement No Services studs Nuts Unknown None None 1CT-71 body to bonnet Unknown Replaced No nuts Nuts Southern Fasteners &
None None 1 CT-71 body to bonnet 2001 Replacement No Supply Inc nuts
- 7. Description of Work: replacement of body to bonnet studs and nuts
- 8. Tests Conducted: Hydrostatic El Pneumatic El Nominal Operation PressureX Other E] Pressure ____psi Test Temp.
-_ F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet in numbered and the number of sheet is recorded at the top of this form.
- 4.
Sheet 2 of 2 WO# 462413-01 R/R# 03-02-0033 FORM NIS-2 (Back)
- 9. Remarks Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conformS to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Signed
,,4,
Expiration Date N/A tor Date-
.IRI r..
.rdina.
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut haye in pected the components described in this Owner's Report during the period of 1/25/2006 to 0 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
,Zý
, (20*
Commissions NC 1507, ABIN NS
-Insp r, Signature National Board, State, Province, and Endorsements Date_______
9
?C WO# 692515-01 R/R#06-O01-0239 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner CP&L dba Proaress Enerav Name P.O. Box 1551. Raleiah. N.C 27602-1551
- 2. Plant Address Shearon Harris Nuclear Power Plant Date 07128/2006 Sheet I of 2 Unit 1 65 WO# 692515-01
" I Name 5413 Shearon Harris Rd.. New Hill. N.C. 27562-01 Address
- 3. Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Repair Organization P.O. No., Job No.. etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System 2005 - Reactor Coolant 5 (a) Applicable Construction Code ASME Section III 1977 Edition, Summer'78 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Buill Or Replacement (Yes or No)
Snubber Pacific Scientific 17482 None None 1981 Replaced Yes Snubber
.Pacific Scientific 18626 None None 1983 Replacement Yes'
- 8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operating Pressure E]
Other [D Pressure __
psi Test Temp.
OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 692515-01 R/R# 06-01-0239 I C, FORM NIS-2 (Back)
- 9. Remarks 'Code Case 1644-7; NF-1 attached Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to ihe rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Signed orwne'sesin-ee,,T Owner or Owner's Designee. Title Expiration Date N/A ISI Cnordin~ tor Date 07/31(2006 ISI Coordina CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 7/28106 to 7/28/06, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section X1.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
4 Commissions NC 1507, ABIN NS S
Inspector's Signature National Board, State, Province, and Endorsements Date 071-1112 1718
IILo WOlf 567698-01 R/R# 06-02-0287 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
- 1. Owner CP&L dba Proaress Eneray Name P.O. Box 1551, Raleigh, N.C; 27602-1551 Address
- 2. Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd.. New Hill. N.C. 27562-0165 Date 08/03/2006 Sheet 1 of 2 Unit 1 WO# 567698-01 Address
- 3. Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System MS - Main Steam 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
Valve plug Control Components Unknown None 1 MS-60 Unknown Replaced No Valve plug ccl 600220 None 1 MS-60 2005 Replacement No
- 7. Description of Work: Replace Valve Plug
- 8. Tests Conducted: Hydrostatic E] Pneumatic rl Nominal Operating Pressure El Other F] Pressure _psi Test Temp. _____F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 567698-01 R/R# 06-02-0287
._FORM NIS-2 (Back)..
K.~-
- 9. Remarks I
Applicable Manufacturer's Data Reports to be attach6d.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A I__
._I_
. Expiration Date N/A.
IRI ronndinato r Date 08/03/2006 Sinned Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, theundersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 4/14/2006 to ______/_
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
t Commissions NC 1507, ABIN NS a--
Inspector's Signature National Board, State, Province, and Endorsements Date g1*/i.
KI
Form N-2 FORM N-2 CERTIFICATE HOLDERS' DATA REPORT FOR IDENTICAL NUCLEAR PARTS AND APPURTENANCES*
As Required by the Provisions of th ASME Code,Section III Not to Exceed One Day's Production Pa. I of 2
- 1. Manufactured and certified by C C 1. 22591 Avenida Empresa, Rancho Santa Margarita, CA 92688 (name and address of Certificate Holder)
- 2. Manufactured for CAROLINA POWER & LIGHT COMPANY, P.O. BOX 1551, RALEIGH, NC 27602 (name and address of purchaser)
- 3. Location of installation CAROLINA POWER & LIGHT. CRDF.H03. STATE RD 1134. NEW HILL, NC 27562
. (name and address) 4.Type 327100003 SA182-Fll 70.000 PSI (drawing no.)
(mat'l spec. no.)
(tensile strength)
N/A (CRN) 2005 (year built)
N/A (Code Case no.)
- 5. ASME Code. SectionIll. Division!:
1974 (edition)
WINTER 1976 2
(addenda date)
(class)
- 6. Fabricated In accordance with ConsL Spec. (div. 2 only)
N/A (no.)
Revision NIA Date N/A
- 7. Remarks '"FOR ATMOSPHERIC DUMP VALVES CCI PROJECT 108135. SFC 600220,
- 8. Nom. thickness 2.685' Min.
design thickness 2.669' Dia. ID (ft & tn.)
2.63*
Length overall (ft & 11.1" in.)
(in.J
_ _,-__-_-(in.)
- 9. When applicable. Certificate Holders' Data Rerports are attached for each item of the this report:
Part or Appurtenance Serial Number National Board No.'
In Numerical Order N/A (1.)
(2.)
(3.)
(4.)
(5.)
(6.)
(7.)
(8.)
(9.)
(10.)
(11.)
(12.)
(13.)
(14.)
(15.)
(16.)
(17.)
(18.)
(19.)
(20.)
(21.)
(22.)
(23.)
(24.)
(25.)
600220
~1 Part or Appurtenance National Serial Number Board No.
in Numerical Order (26.)
(27.).
(28.)
(29.)
(30.)
(31.)
(32.)
(33.)
(34.)
(35.)
(36.)
(37.)
(38.)
(39.)
(40.)
(41.)
(42.)
(43.)
(44.)
(45.)
(46.)
(47.)
(48.)
. i (49.)
(50.)
m
~1
~1
~1-
.9 1~
II9
.9-
___________________________ J._______________
- 10. Design pressure 1185 psi Temp.
600 Deg. F Hydro test pressure NIA at temp. Deg.
f
'Supplemental information in the form of lists. sketches, or drawings may be used provided (1) size is 8 12 x 11. (2) information in items I through 4 on this OataReport Is included on each sheet. (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
This fcrm (E00037) may be obtained from the Order Dept.. ASME. 22 Low Drive. Box 2300. Fairfeld. NJ 07007-2300.
Form N'J2 FORM N-2(Back-Pg. 2 of 2)'
Certificate Holder's Serial No.
600220 Through 600220 CERTIFICATE OF DESIGN.
Design Specification certified by ALGIRDAS CESNAVICIOS P.E. State iNC:
Reg. no.
7549 Design Report' certified by NIA P.E. Stale N/A Reg. no.
.(when applicable)
CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and that this (these)
PLUG conforms to the rules of construction of the ASME Code,Section III, Division 1.
NPT Certificate of Authorization N-2696 Expires AUGUST 14, 2006 No.
Date "N Name C C I Signed (NPT Certificate Holder)
C
((Auorized represetative)
CERTIFICATE OF INSPECTION I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of CALIFORNIA and employed by HSBICT of HARTFORD, CONNECTICUT have inspected these items described in this Data Report on
_A/'1 c/_ i-I t4 Z,
Z g,. ;
, and state that to the best of my knowledge and belief, the Certificate Holder has fabricated these parts orappurtenances in accordance with ASME Section Ill. DivIsfon 1.
Each part listed has been authorized for stamping on the date shown above.
By signing this certificate, neither the inspector nor his employer makes warranty, expressed or Implied, conceming the equipment described in this Data Report. Futhermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or ss of any kind arsing from or connected with this inspection.
Date -3/ 7-Z t; Signed Cmmissions
/Zt-& 14 i4.
(Auftorize-d Inspector)-
(Nat I Bd. Cincluding endorsemenQ and state or prov.. and no.)
WO# 224491-03 R/R# 06-02-0290 4
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
- 1. -Owner
- CP&L dba Progress Energy Name 2.
3.
P.O. Box 1551, Raleigh, I.;.
27602-1551 Address Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd.,New Hill, N.C. 27562-0165 Address Work Performed By Progress Energy, Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Date 08/03/2006 Sheet 1 of 2 Unit I WO# 224491-03 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A*.
Expiration Date N/A
- 4. Identification of System CS - Chemical Volume Control 5
(a) Applicable Construction Code ASME Section 111 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section-XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
Valve.
Unknown Unknown Unknown 1CS-749 Unknown Replaced Yes Valve Kerotest NU-1 1-24 13926 1CS-749 1977 Replacement yes
- 7. Description of Work: Replace valve
- 8. Tests Conducted: Hydrostatic E] Pneumatic El Nominal Operating Pressure [
Other E] Pressure _
psi Test Temp. _
F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/22 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 224491-03 R/R# 06-02-0290 FORM NIS-2 (Back)
- 9. Remarks NPV-1 form attached i cdlcI-fa e A 14/16-2 4/
Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed eeen.,
ISI Coordinator Date 08/03/2006 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have, inspected the components described in this Owner's Report during the period of 4/23/2006 to
,*/)/
-, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
,. ý f,
Commissions NC 1507, ABIN NS
" /
Inspector's Signature National Board, State, Province, and Endorsements Date___ _____
Sho 1 of 2 i**?'.:.*'!*~Ma M*u*mc
- *rt.3
- lnfeui, Corp.
Pit tsburgh; P*
"..T A7c
%f
?;nut-,u,Cr)..
'1*:'..'*
- 2. Mc,-r,ctured (or Dur Power Gop*.i f-sr(N e amn,',e,.?-
of fruith*vr c. Owner)
. 'o*"n f I*:ot*'*,
Caawb.-"uc~~rPo-wer' Stati ont. Newp.,-ort SC (Namn' *-i A~ddrexa
-mp or V.-Ove.
rnin3l In:et Sizc
-Cuio site
~(inch?
"(,, "
"No..
(0 Fdnuf
,'z' (c) Candin
'S*
.6 No.
Snrizl ne.istrftien (d) Drawing (0f Nzt*f.
(tl} Yet-r yr No.
No.
No.
(a) C!afm Dd. No.
Built
- I Globe
.,!.5
- _-_
CA-D-Q
-(
- _lm
.0_!_
08__
9
-___3Globe NU Q-
__-D--
3_,QL9__ _1922_,
' ?.../kD CO9+++
J39)
'2
..(4) "Globe Jbi*
aL
____94_
.(j)__
i 1 1___19i7_
(0; Giobm Y_'n
~---
- t.
___/L_._
A*_D_-
.~9O.21Li____.._1_,j.j____?.*7 Gl~ob*Z PIZ I e
- A
.h 4__
_ l~,___*LD.9q
=*.
__.1_ *_
2 3.9,5.__9.72.__
tic; G.
,1._*..
ilil.=:.c~..
L.
'/ ^
.3.2
_--. __,7
_q.-..
L= j 0 _-
____I _.__.' _,_6____..__
(5ri3f d2*¢Hpti.n vf servce for which.equipmc-rt wa8 dcsi*e*rv)
""G."e
._z.-.---
r-p
_650 F or Velve Prossure Clas s-I
<~~~
~~
S..(:.
um)
(e.rn~p
¢tca-.r )
- 3. P:.r*urc Pc:£trmrnq PiC,.C
.Azrk N10.
ylm'riai scic. No.
Mcnufacturer Remarks
('hi t
7=
L-Lj" k
-- 4IQN JP--
-1 )
Fo r
.m_
_ L.'...
itomr 1.___ 2________
1.i 5____
on________
thsdtn qc!
sicldd-)ncc set nd()echset sn m
erdad u
brofs 1oy-ord o
(
Sop f'is for._
o_______
yoe__-
__;-,-(SU*""[Fra."d_
7.*_L_~~e*_
-_*i-2___ _*..-__*_....
.I___.___-_.__._
(I) For menuoIf., operated valves only.
O*.-j
I
" S~~upp'cmnnt.1- *h,,et* in form o' lNat.'. :ctchcs,.r ctrn~ving.' may be uzed providod (1).,sze Is 8-1/2" x 11'. (2) information in O"
item.';~ 1, 2 *nd 5 on this (de;t. r*.';o.
i's icluded or each sheat, and (3} each shaet is numberod and number of a~'et*
13I roc'**red ot top ci this form.
.4 i./**.;zZ*:T$
- `***tp**?i
.. *f*l
+.**
r..'.:*-,+:*3,**..*;*
t*++*pmL,,,......."".
- '**+**``
.-N~:*:+``9:*f*W 5:.;"*i~r.``*:-"4
.4'.
4'*4
F*',
- v. n-'
l.e.
-'.4 I o i
FO'" NN141119:
-}O~*r st j
i cua~ue
~
r~
-- --------- T U~~~~
N o.-c-N0 lm~k
-isf-I dinnt p-972) s____
A_________-C(7y i
=E','FICATE OF COM4PLIANCE V,'2;e cert:iN! that the entmnsrd ntisrp.t**crc
.d that this Pump. 0r valve, conforms to 'the rules of "consr.'=C9n Of the A
<ME Cede
_,;c'e-royer Plnt Components. Section_.
. I.. Edition _.
e 4
- 7~~C l
'=:*
10/28/77 0uS I j,.b h L I expre3 I
,.)
I~~~~N)
M l*'
~
le z I F
A rl aN oF DECSIGN Deign c
t:t tCor 3:7"'v
- !s5 rep,: fciass 1 only) c., file c" Ker-otest Manufacturing Corp..
WIb aesifn Fthats te scmeredb in "ia r-
- ayet, cfomstohereso cFE e
.'C thReg.
t-:c.
4 o
dSt-esz znzlysfs czsified o (1,c
,t GD V i saII i I PE byt -AA nc{6 R*
SECOTION III 3,
?.nSiynture iot equiiecLst npr
,nase only.
CEERTIFICATE OF SPOP INSPE-CTION'-
1, Ibhe undersigrivd, ho'ding a vatid commission issued by the Nationai Board of Boiler and Pressure Vessel Inspectors
--c!n the intnOr s
s*!
,,'ania znd etp'oye'.
by The Hartford Steam 1oile M Cb ll}-artford,, Connecticut h... inspecTed the pumr.p, or valve, described in this Data Repori on e runot 19-77 zn stale tht to the best c! my knowledge and belif, the Manufacturer has con-stvled this pump, or vahve, in accoidance with the ASME Code. Section IlL.
ay signing this certificae, ;.either the Inspector nor his employer makes any warrznty, expressed or implied, concerning V
the equipment described in this Data Repcrt. Furthermore. neither the Inspector nor his employer shall be liable in any mnanner for any personal i."uy or prca*-,,, dainzae or a loss of any kind arising from or connected with this inspection.
\\i 6
F~e ruary 2j,L I.-'-.--- -Pd.4.- I,.*
.o*.
Commi-..ions
'\\
S -
I,
/
{I*,#prcto,)
Ill~~N
't kd.. Stal., Prov. and No.1
- 7.
~SUP?
U-1 -UT SHEV' IV-1 L
ti...
-uredny,.
zt
,i u--actu-inj
._C~ __Pi2t,
, PA ( J 62699)
- 2.
2 nn.ifacturcd for Diuike Power Compiny
':;M~
,.nu I'actu rers' DNawn Caot' lRoard "No.
(2)
CA-D-99g9-(1) ii~i.3) ~4:;j'
~
CA -D.9CK)i
("U'
.. 3,923 a +-.-.,..
"O 2)mi A-D-99O9*-(.)
i 13,.923__
GA-DQO~-~.
213,924
-~.
,., -~1*,925 (14
- U' 3-ig
,:-I--<: '--
-1 1
)
2
~-
____13,926
.. 2)
""(sc)+
i
)1 +-.+"
C v,-D-g99,9-,1 3,927-(..2.
A,-e<e-
)
.7
.1 2
SECTION Ilk<,
""
- 8) +U-++v".'u
,.o, v,.
V
a WOl# 684262-01 R/R# 06-02-0291 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner CP&L dba Prociress Enerciv Name P.O. Box 1551. Raleiah. N.C. 27602-1551 Date 0810312006 Sheet 1 of 2 Unit 1 Address
- 2. Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address
- 3. Work Performed By Progress Energy WO9 684262-01 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address
- 4. Identification of System 3010- Steam Generator Blowdown 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989-, Adderida'N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
Stud Nova None None Heat# 224939 1995 Replacement No Nut Coloc Ind.
None None Heat Code 2H568 2005 Replacement No
- 7. Description of Work: Removed Hanger and replaced studs and nuts
- 8. Tests Conducted: Hydrostatic E3 Pneumatic E] Nominal Operating Pressure El Other E] Pressure __.psi Test Temp. ___-F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 684262-01 R/R# 06-02-0291 FORM NIS-2 (Back)-
- 9. Remarks..........-"
Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in'the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Signed
/-.1,----0Mý Expiration Date N/A Date 08/03/2006 I
nnrdin:tnr Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 4/12/06 to 8/3/06, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
o, Commissions NC 1507, ABIN NS SIn:spector's Signature National Board, State, Province, and Endorsements Date 08/03/2006
.:WO#
684263-01 RIR# O06-ot-O2-9A FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
- 1. Owner
-CP&L dba Proqress Eneri'V Name P.O. Box 1551. Raleiqh, N.C. 27602-1551 Address.
- 2. Plant Shearon Harris Nuclear Power Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address
- 3. Work Performed By Progress Energy Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address Date 08/03/2006 Sheet 1 of 2 Unit 1 WO# 684263-01 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
- 4. Identification of System 3010 - Steam Generator Blowdown 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or. Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component' Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
Hanger Bergen-Paterson None None 1-BD-H-00208 1980 Replaced No Stud Nova None None Heat# 224939 1995 Replacement No Nut Coloc Ind.
None None Heat Code 2H568 2005 Replacement No
- 7. Description of Work: Removed Hanger and replaced studs and nuts
- 8. Tests Conducted: Hydrostatic El Pneumatic El Nominal Operating Pressure E]
Other E] Pressure psi Test Temp.
OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/22 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2
.WO# 684263-01 R/R#
FORM NIS-2 (Back)
- 9. Remarks Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION.OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Signed ISI Coordinator Expiration Date N/A Date 08/03/2006 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 4/12/06 to 8/3/06_, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions NC 1507, ABIN NS sSignature.
National.Board, State, Province, and Endorsements Date 08/031/2006
WO# 853779-02 R/R#06-02-0293 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
- 1. Owner CP&L dba Progress Energy Name P.O. Box 1551, Raleigh, N.C. 27602-1551 Address
- 2. Plant Shearon Harris Nuclear Power Plant Date 08/04/2006 Sheet 1 of 2 Unit 1 WO# 853779-02 Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address
- 3. Work Performed By Progress Energy Name 5413 Shearon Harris Rd. New Hill. N.C. 27562-0165 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A Address
- 4. Identification of System BD - Steam Generator Blowdown 5
(a) Applicable Construction Code ASME Section III 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
Snubber Pacific Scientific 37188 N/A BD-H-529 1980 Repaired Yes
- 7. Description of Work: Snubbers's 'L' dimension was reset. This work required the removal and subsequent rewelding of the telescoping tube fillet weld.
- 8. Tests Conducted: Hydrostatic E] Pneumatic E] Nominal Operating Pressure El Other El Pressure __
_psi Test Temp. __F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
9 Sheet 2 of 2 WO# 853779-02
.R/R# 06-02-0293 M...
-N, (Back)
.. FORM NIS-2 (Back)' '-'.*-.-.
- 9. Remarks..........
Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE-We certify that the statements made in the report are correct and this.- repair conforms to the rules of the repair or replacement ASME Code, Section X1.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed *2ee--*4'.--------,.---L ISI Coordinator Date C,
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period of 5/8/2006 to 0711 4
., and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
It 1 Commissions NC 1507, ABIN NS J
Inspector's Signature National Board, State, Province, and Endorsements Dn~t
WO# 853779-01 R/R# 06-02-0294 9
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
- 1. Owner CP&L dba Proaress Eneray
.Name P.O. Box 1551. Raleiah. N.C. 27602-1551 Address
- 2. Plant Shearon Harris Nuclear Power.Plant Name 5413 Shearon Harris Rd., New Hill, N.C. 27562-0165 Address
- 3. Work Performed By 'Progress Energy Name
- 5413 Shearon Harris Rd.. New Hill. N:C. 27562-0165 Date 08/04/2006 Sheet 1 of 2 Unit 1 WO# 853779-01 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A Address
- 4. Identification of System BD - Steam Generator Blowdown 5
(a) Applicable Construction Code ASME Section I 1974 Edition, Winter 1976 Addenda, None Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989
, Addenda N/A
- 6. Identification of Components Repaired or Replaced and Replacement Components
- Repaired, ASME Code Name of Name of Manufacturer National Other Year
- Replaced, Stamped Component Manufacturer Serial No.
Board No.
Identification Built Or Replacement (Yes or No)
Snubber PSA Unknown N/A BD-H-196 1980 Repaired Yes
- 7. Description of Work: Snubbers's 'L' dimension was reset. This work required the removal and subsequent rewelding of the telescoping tube fillet weld.
- 8. Tests Conducted: Hydrostatic El Pneumatic E] Nominal Operating Pressure E]
Other E] Pressure __
psi Test Temp. _
F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Sheet 2 of 2 WO# 853779-01 R/R# 06-02-0294 FORM NIS-2 (Back)
- 9. Remarks Applicable Manufacturer's Data Reports to be attached.
CERTIFICATION OF COMPLIANCE We certify that the statements made in the report are correct and this repair conforms to the rules of the repair or replacement ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed II.,'.
I51 Coordinator Date
-7)(,
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, Connecticut have irspected the components described in this Owner's Report during the period of 5/8/2006 to S
-, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
ti Commissions NC 1507, ABIN NS Inspectors Signature National Board, State, Province, and Endorsements Date K~