C44)CP&L MrO VaINnwyw FEB 1 5 2002 Serial: HNP-02-018 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555

-SHEARON HARRIS-NUCLEAR POWER PLANT DOCKET NO. 50400/LICENSE NO. NPF-63 MONTHLY OPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of January 2002 is provided.

Sincerely, R. J. Field Manager, Regulatory Affairs Harris Nuclear Plant SGR Enclosure c:

Mr. J. B. Brady (NRC Senior Resident Inspector, INP)

Mr. J. M. Goshen (NRC Project Manager, HNP)

Mr. L. A. Reyes (NRC Regional Administrator, Region II)

Harris Nuclear Plant 5413 Shearon Harris Road New Hill, NC 27562

0m

Enclosure to Serial HNP-02-018 Sheet I of 3 CP&L CO.

RUN DATE 02/07/02 RUN TIME 14:36:19 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1

RPD36-000 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 OPERATING STATUS 1.

2.

3.

4.

5.

6.

7.

8.

UNIT NAME:

HARRIS UNIT 1 REPORTING PERIOD: JANUARY 02 LICENSED THERMAL POWER (MWT):

2900 NAMEPLATE RATING (GROSS MWE):

950.9 DESIGN ELECTRICAL RATING (NET MWE):

941.7 MAX--DEPENDABLE--GAPAGITY--GROSe-MWE)-: -960.0 MAX DEPENDABLE CAPACITY (NET MWE):

900.0 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)

SINCE LAST REPORT, GIVE REASONS:

Line items 6 and 7, Gross and Net MDC have been changed.

These changes are a result of Power Uprate and Steam Generator Replacement implementation during the recently completed refueling outage. Additional adjustments to the MDC values may be required as a result of further evaluation during peak period conditions.

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS MONTH YR TO DATE CUMUL ATIVE 11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

HOURS IN REPORTING PERIOD NUMBER OF HOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOWN HRS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GEN.

(MWH)

GROSS ELEC.

ENERGY GEN (MWH)

NET ELEC.

ENERGY GENERATED (MWH)

UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CAP. FACTOR (USING MDC NET)

UNIT CAP. FACTOR (USING DER NET)

UNIT FORCED OUTAGE RATE SHUTDOWNS SCHED. OVER NEXT 6 MONTHS 744.00 726.25

.00 687.13

.00 1888192.32 638584.00 596616.00 92.36 92.36 89.10 85.15

. 0 (TYPE, DATE, P.

744.00 726.25

.00 687.13

.00 1888192.32 638584.00 596616.00 92.36 92.36 89.10

_ -- 85.15

.00 129337.00 109997.15

.00 108992.38

.00 293986621.50 97785472.00 91324093.00 84.27 84.27 82.08 74. 98 2.71 AND DURATION OF EACH):

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 -

9

Enclosure to Serial: HNP-02-018 Sheet 2 of 3 CP&L CO.

RUN DATE 02/07/02 RUN TIME 14:36:19 PLANT PERFORMANCE DATA SYSTEM APPENDIX B -

AVERAGE DAILY POWER LEVEL HARRIS UNIT 1 PAGE 1

RPD39-000 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 JANUARY 2002 DAY AVG. DAILY POWER LEVEL (MWE-NET) 1

-43 2

-43 3

72 4

272 5

583 6

843 7

920 8

927 9

927 10 910 11 916 12 920 13 921 14 933 15

_932.

16 935 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31-AVG. DAILY POWER LEVEL (MWE-NET) 933 934 935 935 932 932 931 922 931 934 930 925 924 918 91 9._ -

1.16 -

8

V, Enclosure to,-

Serial: HNP-02-018 Sheet 3 of 3 UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:

Harris DATE:

02/01/02 COMPLETED BY: S. G. Rogers TELEPHONE-(919) 362-2573 REPORT MONTH: January 2002

^

CAUSB AND CORRECTIVE METHOD OP LICENSEE ACTION TO DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE 1 (HOURS)

IREASON 2 REACTOR 3 REPORT #

CODE 4 CODE 5 HarNis Plant was taken off 01-003 09r22/01 S

56.87 C

4 NA ZZ 7i Bne for Refueling Outage 10 on 9/22/01. Refueling Outage 10 ended January 3, 2002 at 08:52. Ramp-up to 100%

power was complete 01/06/02

_ ~~~~~~~~~~~~~~~~~~at 24*00.

F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain) t B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examinaton F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4

Exhibit G-Instuctions for Preparation of Data Entry Sheets for Ucensee Event Report (LER) File (NUREG-0161) 5 Exhibit I -Same Source