Progress Energy AU 6 2003 SERIAL: HNP-03-093 AUG 2 6I200310 CFR 50.54 (p)(2)
United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 SUBMITTAL OF REVISION 3 TO THE PHYSICAL SECURITY AND SAFEGUARDS CONTINGENCY PLAN Ladies and Gentlemen:
In accordance with 10 CFR 50.54 (p)(2) and 10 CFR 50.4 (b)(4), Progress Energy Carolinas, Inc.
is providing Revision 3 of the Physical Security and Safeguards Contingency Plan (PSSCP) for the Harris Nuclear Plant. These changes were made in accordance with 10 CFR 50.54(p)(2) as changes that do not decrease the safeguards effectiveness of the plan. The revision to the PSSCP was effective on July 3, 2003.
A summary description of the changes is provided in Enclosure 1. A copy of the Physical Security and Safeguards Contingency Plan Revision 3 is provided in Enclosure 2. Enclosure 1 and 2 contain safeguards information that requires protection in accordance with 10 CFR 73.21. Upon separation of Enclosure 1 and 2, this letter is decontrolled.
Please refer any questions regarding this submittal to me at (919) 362-3137 or to Mr. D. A.
Braund at (919) 362-2065.
Sincerely, John R. Caves Supervisor, Licensing/Regulatory Programs Harris Nuclear Plant mgw
Enclosures:
- 1. Summary of Description of Changes (SAFEGUARDS INFORMATION)
- 2. Physical Security and Safeguards Contingency Plan, Revision 3 (SAFEGUARDS INFORMATION)
Progress Energy Carolinas, Inc.
Harris Nuclear Plant
\\J.
P.O.
Box 165 New Hill, NC 27562
Document Control Desk SERIAL: HNP-03-093 c: Mr. R. A. Musser, NRC Senior Resident Inspector, HNP (w/o Enclosure 1 and 2)
Mr. C. P. Patel, NRR Project Manager, HNP (w/o Enclosure 1 and 2)
Mr. L. A. Reyes, NRC Regional Administrator, Region II (2 copies of PSSCP)