Progress Energy FEB 1 9 2003 SERIAL: HNP-03-017 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 ANNUAL OPERATING REPORT - 2002

Dear Sir or Madam:

In accordance with Harris Nuclear Plant Technical Specification 6.9.1.2, Progress Energy Carolinas, Inc. (alternately known as Carolina Power & Light Company) provides the Annual Operating Report for 2002. This report includes information regarding; (1) individuals receiving exposures greater than 100 mrem/yr and their associated man-rem exposure according to work and job functions, (2) primary coolant specific activity limits, and (3) challenges to the pressurizer power-operated relief valves and safety valves for 2002.

If you have questions regarding this submittal, please contact me at (919) 362-3137.

Sincerely, J. R. Caves Supervisor - Licensing/Regulatory Programs Harris Nuclear Plant MGW Enclosure c:

Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)

Mr. C. P. Patel (NRR Project Manager, HNP)

Mr. L. A. Reyes (NRC Regional Administrator, Region II)

Ms. S. A. Burrows (NRC REIRS Project Manager)

Progress Energy Carolinas, Inc.

Harris Nuclear Plant P 0 Box 165 New Hill, NC 27562 X

00

Enclosure to SERIAL: HNP-03-017 Report ID:

TIBH932 10 CFR PART 20 PASSPORT TOTAL EXPOSURE SYSTEM WORK AND JOB FUNCTION REPORT / MANAGEMENT REPORT Page:

1 Date: 02/04/03 Time: 10:32 Facility: HNP Report for Calendar Year: 200 This report was produced with pocket dosimeter data.

This report produced for :

NRC Task: ** Resource Type:**** Resource Code: ********

and Department Code: **

Number of Persons Receiving Over 100 millirem is 16.

Total man-rem:

2.603 Number of Individuals ------- I I -------- Year to Date Dose ------- I Station Utility Contractors Station Utility Contractors Employees Employees and Others Employees Employees and Others OPERATIONS & SURVEILLANCE ROUTINE MAINTENANCE INSERVICE INSPECTION SPECIAL MAINTENANCE WASTE PROCESSING REFUELING TOTAL Maintenance Personnel Operating Personnel Health Physics Personnel Supervisory Personnel Engineering Personnel Maintenance Personnel Operating Personnel Health Physics Personnel Supervisory Personnel Engineering Personnel Maintenance Personnel Operating Personnel Health Physics Personnel Supervisory Personnel Engineering Personnel Maintenance Personnel Operating Personnel Health Physics Personnel Supervisory Personnel Engineering Personnel Maintenance Personnel Operating Personnel Health Physics Personnel Supervisory Personnel Engineering Personnel Maintenance Personnel Operating Personnel Health Physics Personnel Supervisory Personnel Engineering Personnel Maintenance Personnel Operating Personnel Health Physics Personnel Supervisory Personnel Engineering Personnel

      • Grand Total ***

4.

2

.00

.00 3.00

.00

.00 8.00

.00 3.00

.00

.00

.00

.00

.00

.00

.00 8.00

.00 4.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00 16.00

.00 10.00

.00

.00 26.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00

.00 2.00

.00 2.00

.00

.00 2.00

.00 1.00

.00

.00

.00

.00

.00

.00

.00 2.00

.00 2.00

.00

.00

.00

.00

.08

.00

.00

.00

.00

.00

.00

.00 6.00

.00 5.00

.00

.00 11.00

.000

.000

.032

.000

.000

.146

.000

.019

.000

.000

.000

.000

.000

.000

.000 1.433

.000

.446

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000 1.579

.000

.497

.000

.000 2.076

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.009

.000

.004

.000

.000

.109

.000

.009

.000

°.000

.000

.000

.000

.000

.000

.185

.000

.211

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.000

.303

.000

.224

.000

.000

.527 Page 1

Enclosure to SERIAL: BNP-03-017 2002 ANNUAL OPERATING REPORT - PRIMARY COOLANT IODINE SPIKES During 2002, activity levels in the primary coolant did not exceed 1.0 pCi/gram dose equivalent 1-131 or 100/E-bar pCi/gram gross radioactivity as set forth in Technical Specification 3.4.8.

Page 2

Enclosure to SERIAL: HNP-03-017 2002 ANNUAL OPERATING REPORT - PRESSURIZER RELIEF AND SAFETY VALVE CHALLENGES During 2002, there were no challenges to the pressurizer power-operated relief valves (PORVs) or safety valves.

Page 3