HNP-03-017, Annual Operating Report - 2002

From kanterella
Jump to navigation Jump to search
Annual Operating Report - 2002
ML030560443
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/19/2003
From: Caves J
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
HNP-03-017
Download: ML030560443 (4)


Text

Progress Energy FEB 1 9 2003 SERIAL: HNP-03-017 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 ANNUAL OPERATING REPORT - 2002

Dear Sir or Madam:

In accordance with Harris Nuclear Plant Technical Specification 6.9.1.2, Progress Energy Carolinas, Inc. (alternately known as Carolina Power & Light Company) provides the Annual Operating Report for 2002. This report includes information regarding; (1) individuals receiving exposures greater than 100 mrem/yr and their associated man-rem exposure according to work and job functions, (2) primary coolant specific activity limits, and (3) challenges to the pressurizer power-operated relief valves and safety valves for 2002.

If you have questions regarding this submittal, please contact me at (919) 362-3137.

Sincerely, J. R. Caves Supervisor - Licensing/Regulatory Programs Harris Nuclear Plant MGW Enclosure c: Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)

Mr. C. P. Patel (NRR Project Manager, HNP)

Mr. L. A. Reyes (NRC Regional Administrator, Region II)

Ms. S. A. Burrows (NRC REIRS Project Manager)

Progress Energy Carolinas, Inc.

Harris Nuclear Plant P 0 Box 165 X 00 New Hill, NC 27562

Enclosure to 4.

SERIAL: HNP-03-017 Report ID: TIBH932 PASSPORT Page: 1 10 CFR PART 20 TOTAL EXPOSURE SYSTEM Date: 02/04/03 WORK AND JOB FUNCTION REPORT / MANAGEMENT REPORT Time: 10:32 Facility: HNP Report for Calendar Year: 200 2 This report was produced with pocket dosimeter data.

This report produced for : NRC Task: ** Resource Type:**** Resource Code: ******** and Department Code: **

Number of Persons Receiving Over 100 millirem is 16 . Total man-rem: 2.603

- Number of Individuals ------- I I-------- Year to Date Dose ------- I Station Utility Contractors Station Utility Contractors Employees Employees and Others Employees Employees and Others OPERATIONS & SURVEILLANCE Maintenance Personnel .00 .00 2.00 .000 .000 .009 Operating Personnel .00 .00 .00 .000 .000 .000 Health Physics Personnel 3.00 .00 2.00 .032 .000 .004 Supervisory Personnel .00 .00 .00 .000 .000 .000 Engineering Personnel .00 .00 .00 .000 .000 .000 ROUTINE MAINTENANCE Maintenance Personnel 8.00 .00 2.00 .146 .000 .109 Operating Personnel .00 .00 .00 .000 .000 .000 Health Physics Personnel 3.00 .00 1.00 .019 .000 .009 Supervisory Personnel .00 .00 .00 .000 .000 .000 Engineering Personnel .00 .00 .00 .000 .000 °.000 INSERVICE INSPECTION Maintenance Personnel .00 .00 .00 .000 .000 .000 Operating Personnel .00 .00 .00 .000 .000 .000 Health Physics Personnel .00 .00 .00 .000 .000 .000 Supervisory Personnel .00 .00 .00 .000 .000 .000 Engineering Personnel .00 .00 .00 .000 .000 .000 SPECIAL MAINTENANCE Maintenance Personnel 8.00 .00 2.00 1.433 .000 .185 Operating Personnel .00 .00 .00 .000 .000 .000 Health Physics Personnel 4.00 .00 2.00 .446 .000 .211 Supervisory Personnel .00 .00 .00 .000 .000 .000 Engineering Personnel .00 .00 .00 .000 .000 .000 WASTE PROCESSING Maintenance Personnel .00 .00 .00 .000 .000 .000 Operating Personnel .00 .00 .00 .000 .000 .000 Health Physics Personnel .00 .00 .08 .000 .000 .000 Supervisory Personnel .00 .00 .00 .000 .000 .000 Engineering Personnel .00 .00 .00 .000 .000 .000 REFUELING Maintenance Personnel .00 .00 .00 .000 .000 .000 Operating Personnel .00 .00 .00 .000 .000 .000 Health Physics Personnel .00 .00 .00 .000 .000 .000 Supervisory Personnel .00 .00 .00 .000 .000 .000 Engineering Personnel .00 .00 .00 .000 .000 .000 TOTAL Maintenance Personnel 16.00 .00 6.00 1.579 .000 .303 Operating Personnel .00 .00 .00 .000 .000 .000 Health Physics Personnel 10.00 .00 5.00 .497 .000 .224 Supervisory Personnel .00 .00 .00 .000 .000 .000 Engineering Personnel .00 .00 .00 .000 .000 .000

      • Grand Total *** 26.00 .00 11.00 2.076 .000 .527 Page 1

Enclosure to SERIAL: BNP-03-017 2002 ANNUAL OPERATING REPORT - PRIMARY COOLANT IODINE SPIKES During 2002, activity levels in the primary coolant did not exceed 1.0 pCi/gram dose equivalent 1-131 or 100/E-bar pCi/gram gross radioactivity as set forth in Technical Specification 3.4.8.

Page 2

Enclosure to SERIAL: HNP-03-017 2002 ANNUAL OPERATING REPORT - PRESSURIZER RELIEF AND SAFETY VALVE CHALLENGES During 2002, there were no challenges to the pressurizer power-operated relief valves (PORVs) or safety valves.

Page 3