HNP-03-063, Day Special Report - Steam Generator Tubes Plugged
| ML031420075 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 05/15/2003 |
| From: | Caves J Progress Energy Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| HNP-03-063 | |
| Download: ML031420075 (2) | |
Text
Progress Energy MAY 1 5 2003 SERIAL: HNP-03-063 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 15 DAY SPECIAL REPORT - STEAM GENERATOR TUBES PLUGGED Ladies and Gentlemen:
In accordance with Technical Specification 4.4.5.5.a. for the Harris Nuclear Plant, Progress Energy Carolinas, Inc. (also known as Carolina Power & Light Company) is providing the enclosed Special Report. This report identifies no steam generator tubes plugged as a result of the recent Steam Generator Tube Inservice Inspection conducted during Refueling Outage No. 11.
The complete results of the Steam Generator Tube Inservice Inspection will be submitted to the NRC within 12 months of completion as required by Technical Specification 4.4.5.5.b.
If you have any questions regarding this matter, please contact me at (919) 362-3137.
Sincerely, John R. Caves
- Supervisor, Licensing/Regulatory Programs Harris Nuclear Plant MGW Enclosure c:
Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)
Mr. C. P. Patel (NRR Project Manager, HNP)
Mr. L. A. Reyes (NRC Regional Administrator, Region I)
Progress Energy Carolinas. Inc.
Harris Nuclear Plant P.O. Box 165 New Hill, NC 27562
Document Control Desk SERIAL: HNP-03-063 HARRIS NUCLEAR PLANT SPECIAL REPORT PER TECHNICAL SPECIFICATION 4.4.5.5.a.
STEAM GENERATOR TUBE INSERVICE INSPECTION (RFO1 1)
NUMBER OF TUBES PLUGGED Steam Generator A
Current (RFO11) 0 Cumulative B
0 C
0
- 1
- One tube plugged each in Steam Generator A and B during manufacturing process and prior to being placed in service.