HNP-04-105, Preparation and Scheduling of Operator Licensing Examinations
| ML042020336 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 07/13/2004 |
| From: | Caves J Progress Energy Carolinas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| HNP-04-105 | |
| Download: ML042020336 (2) | |
Text
Progress Energy SERIAL: HNP-04-105
'JUL u
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50400/LICENSE NO. NPF-63 NRC REGULATORY ISSUE
SUMMARY
2004-10, PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS Ladies and Gentlemen:
As requested by NRC Regulatory Issue Summary 2004-10, Preparation and Scheduling of Operator Licensing Examinations, Carolina Power & Light Company doing business as Progress Energy Carolinas, Inc., is providing the enclosed completed NRC Form 536, Operator Licensing Examination Data for the Harris Nuclear Plant.
If you have any questions regarding the information provided, please contact Mr. Christos Kamilaris at (919) 362-3355.
Sincerely, J. R. Caves Supervisor, Licensing/Regulatory Programs Harris Nuclear Plant MGW c:
Mr. M. E. Ernstes (Chief, Operator Licensing and Human Performance Branch, RII-NRC)
Mr. R. A. Musser (NRC Senior Resident Inspector, HNP)
Dr. W. D. Travers (NRC Regional Administrator, Region II)
Progress Energy Carolinas, Inc.
Harris Nuclear Plant DU Ja)
P.O. Box 165 62 News Hill, NC 27562
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/31/2005
- 52003)
Estimated burden per response to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection Is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records Management Branch (T-6 E6). U.S. Nuclear Rtegulatory Commission. Washington. DC 20555-0001. or by Internet e-mail to EXA~MINATION DATA[infocollects@nrc.gov, and to the Desk Officer. Office of Information and EXAMNATON ATARegulator Affairs, NEOB-10202, (3150-0131)*
Office of Management and BuA get.
ashington, DC 20503.
If a means used to Impose aninformation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information collection.
FACILITY NRC REGION ZEAQR YA4kS IUC A(
111 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CYZCOS CYO_l CY 2A7 CY2co%
ESTIMATED NUMBER OF LICENSEE-PREPARED Q
l EXAMINATIONS 0
ESTIMATED NUMBER OF NRC-PREPARED 0
(O 0
EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2O0 CY216 cy2n1 cy2coS NUMBER OF REACTOR OPERATORS 0
NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0
0 NUMBER OF SENIOR REACTOR 2
OPERATORS - UPGRADE 3
3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
0 0
PROPOSED DATES PRIMARY DATE alIA QI' 3/z2_coG.
o0sro f IA ALTERNATE DATE O 6fo4ZIA 0-1 olOS lool C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE NRC FORM 536 (5-2003)
PRINTED ON RECYCLED PAPER