HNP-06-077, Emergency Core Cooling System Evaluation Changes

From kanterella
Jump to navigation Jump to search
Emergency Core Cooling System Evaluation Changes
ML061520355
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/24/2006
From: Corlett D
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
HNP-06-077
Download: ML061520355 (5)


Text

' Progress Energy SERIAL: HNP-06-077 MAY 2 4 2006 10 CFR 50.46 U. S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 EMERGENCY CORE COOLING SYSTEM EVALUATION CHANGES Ladies and Gentlemen:

The purpose of this letter is to submit information required by 10 CFR 50.46 for the Harris Nuclear Plant (HNP), of Carolina Power & Light Company (doing business as Progress Energy Carolinas, Inc.), concerning the effect of errors or changes in the application of the Emergency Core Cooling System (ECCS) evaluation models. This letter satisfies the requirement for HNP to submit an annual report in accordance with 10 CFR 50.46(a)(3)(ii).

The HNP ECCS performance following a large break loss of coolant accident (LBLOCA) is calculated by HNP's fuel vendor, Framatome-ANP, using the SEM/PWR-98 ECCS Evaluation Model for PWR LBLOCA Applications. The ECCS performance following a small break loss of coolant accident (SBLOCA) is calculated for HNP by Framatome-ANP using the EXEM PWR Small Break Model.

The previous HNP annual report to the NRC was provided by letter dated May 25, 2005, which documented a SBLOCA PCT of 1701°F and a LBLOCA PCT of 21020F.

There have been no errors or changes in the LBLOCA models or results that would require a 30-day report under 10CFR50.46. Attachment 1 provides a summary of the impact of errors on PCT since the May 2005 report. As described in Attachment 2, there have been no reported errors associated with SBLOCA Model. One error was reported to HNP that did not increase the LBLOCA PCT as described in Attachment 3.

The SBLOCA and LBLOCA PCT values remain unchanged at 1701°F and 2102°F, respectively.

Progress Energy Carolinas, Inc.

Harris Nuclear Plant P. 0. Box 165 New Hill. NC 27562

Page 2 HNP-06-077 This letter contains no new regulatory commitments. Please contact me if you have any questions regarding this submittal at (919) 362-3137.

Sincerely, D. H. Corlett Supervisor, Licensing - Regulatory Programs Harris Nuclear Plant DHC/khv c:

Mr. R. A. Musser, NRC Sr. Resident Inspector Mr. C. P. Patel, NRC Project Manager Dr. W. D. Travers, NRC Regional Administrator to SERIAL: HNP-06-077 Harris Nuclear Plant Small Break LOCA Peak Clad Temperature Summary Peak Clad Temperature (F) 1701 Vilue Ren}orted 5/25/2005 Reported Error Impact None 1701 New SBLOCA PCT Value Harris Nuclear Plant Large Break LOCA Peak Clad Temperature Summary Peak Clad Temperature ('F) 2102 Value Reported 5/25/2005 Reported Error Impact A. Interpolation outside of Data Table in ICECON Calculation of Steam Condensation Rate New LBLOCA PCT Value 0

2102 to SERIAL: HNP-06-077 10 CFR 50.46 Small Break LOCA Model Errors None to SERIAL: HNP-06-077 10 CFR 50.46 Large Break LOCA Model Errors Interpolation Error in ICECON Calculation of Steam Condensation Rate An error was identified in the ICECON code used in the RFPAC code which is part of the SEM/PWR-98 LOCA methodology. The error involved array indices that caused interpolation outside of a data table. The error involved calculation of steam condensation rate. The error was discovered during conversion of the code to a different FORTRAN compiler. The PCT impact of the error is estimated to be 0°F for HNP.