SCP&L A Progress Energy Company SERIAL: HNP-02-016 FEB 1 92007Z United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 ANNUAL OPERATING REPORT - 2001
Dear Sir or Madam:
In accordance with Harris Nuclear Plant Technical Specification 6.9.1.2, Carolina Power & Light Company provides the Annual Operating Report. This report includes information regarding; (1) individuals receiving exposures greater than 100 mrem/yr and their associated man-rem exposure according to work and job functions, (2) primary coolant specific activity limits, and (3) challenges to the pressurizer power-operated relief valves and safety valves for 2001.
Questions regarding this submittal may be referred to Mr. J. R. Caves at (919) 362-3137.
Sincerely, Fild4 Manager, Regulatory Affairs Harris Nuclear Plant MGW Enclosure c:
Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)
Mr. J. M. Goshen (NRR Project Manager, HNP)
Mr. L. A. Reyes (NRC Regional Administrator, Region II)
Ms. S. A. Burrows (NRC REIRS Project Manager)
Harris Nuclear Plant 5413 Shearon Harris Road New Hill NC 775792 N
Enclosure to SERIAL: HNP-02-016 RIMS II NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION, 2001 HARRIS PLANT NUMBER OF PERSONNEL > 100 MREM I
TOTAL MAN-REM WORK AND JOB FUNCTION STAT UTIL CNTR I
STAT UTIL CNTR REACTOR OPERATIONS AND SURVEILLANCE I
MAINTENANCE PERSONNEL 2
0 410 0.314 0.000 134.914 OPERATING PERSONNEL 14 0
0 1.990 0.000 0.000 HEALTH PHYSICS PERSONNEL 13 0
37 2.124 0.000 9.644 SUPERVISORY PERSONNEL 0
0 25 1
0.000 0.000 8.151 ENGINEERING PERSONNEL 2
0 68 1
0.245 0.000 22.338 ROUTINE MAINTENANCE MAINTENANCE PERSONNEL 0
0 22 0.000 0.000 4.556 OPERATING PERSONNEL 0
0 0
0.000 0.000 0.000 HEALTH PHYSICS PERSONNEL 0
0 1
0.000 0.000 0.269 SUPERVISORY PERSONNEL 0
0 0
0.000 0.000 0.000 ENGINEERING PERSONNEL 0
0 0o 0.000 0.000 0.000 INSERVICE INSPECTION MAINTENANCE PERSONNEL 0
0 0
0.000 0.000 0.000 OPERATING PERSONNEL 0
0 0
0.000 0.000 0.000 HEALTH PHYSICS PERSONNEL 0
0 0
0.000 0.000 0.000 SUPERVISORY PERSONNEL 0
0 0
0.000 0.000 0.000 ENGINEERING PERSONNEL 0
0 0
0.000 0.000 0.000 SPECIAL MAINTENANCE MAINTENANCE PERSONNEL 0
0 0
0.000 0.000 0.000 OPERATING PERSONNEL 0
0 0
0.000 0.000 0.000 HEALTH PHYSICS PERSONNEL 0
0 0
0.000 0.000 0.000 SUPERVISORY PERSONNEL 0
0 0
0.000 0.000 0.000 ENGINEERING PERSONNEL 0
0 0
0.000 0.000 0.000
I--------------------------
WASTE PROCESSING MAINTENANCE PERSONNEL 0
0 0
0.000 0.000 0.000 OPERATING PERSONNEL 0
0 0
0.000 0.000 0.000 HEALTH PHYSICS PERSONNEL 0
0 0
0.000 0.000 0.000 SUPERVISORY PERSONNEL 0
0 0
0.000 0.000 0.000 ENGINEERING PERSONNEL 0
0 0
0.000 0.000 0.000 I-----------------------
REFUELING MAINTENANCE PERSONNEL 56 1
51 14.754 0.171 10.484 OPERATING PERSONNEL 10 0
1 1.779 0.000 0.107 HEALTH PHYSICS PERSONNEL 11 0
9 2.674 0.000 1.602 SUPERVISORY PERSONNEL 4
0 1
0.600 0.000 0.172 ENGINEERING PERSONNEL 10 2
15 2.423 0.304 2.551
I--------------------------
TOTAL L
MAINTENANCE PERSONNEL 58 1
483 I1 15.068 0.171 149.954 OPERATING PERSONNEL 24 0
1 i'
3.769 0.800 0.107 HEALTH PHYSICS PERSONNEL 24 0
47 1
4.798 0.000 11.515 SUPERVISORY PERSONNEL 4
0 26 I
0.600 6.000 8.323 ENGINEERING PERSONNEL 12 2
83 I
2.668 0.304 24.889 I-----------------------
GRAND TOTAL 122 3
640 I
26.903 0.475 194.788 2001 R.G. 1.16 Report NOTES:
(1)
The total dose in this table of 222.166 man-rem is based on electronic dosimeter readings for personnel who received > 100 mrem during 2001. Total electronic dosimeter dose for all personnel was 266.449 man-rem. Official TEDE dose for all personnel based on TLD readings (DDE) plus calculated internal (CEDE) dose was 252.241 man-rem.
(2)
STAT = Harris Plant staff UTIL = CP&L non-Harris personnel CNTR = Contractor I
Enclosure to SERIAL: HNP-02-016 2001 ANNUAL OPERATING REPORT - PRIMARY COOLANT IODINE SPIKES During 2001, activity levels in the primary coolant did not exceed 1.0 gCi/gram dose equivalent 1-131 or 100/E-bar ACi/gram gross radioactivity as set forth in Technical Specification 3.4.8.
2
Enclosure to SERIAL: HNP-02-016 2001 ANNUAL OPERATING REPORT - PRESSURIZER RELIEF AND SAFETY VALVE CHALLENGES During 2001, there were no challenges to the pressurizer power-operated relief valves (PORVs) or safety valves.
3