IR 05000498/1987008

From kanterella
Revision as of 21:45, 1 February 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/87-08 & 50-499/87-08
ML20236D718
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/24/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 8707310038
Download: ML20236D718 (3)


Text

_

.. _

jd#"% UNITED STATES y" - ~, NUCLEAR REGULATORY COMMISSION b REGloN IV

8 611 RYAN PLAZA DRIVE. SUITE 1000

, ,

ARLINGTON, TEXAS 76011

- JUL k. 4 19ef In Reply Refer To:

Dockets: 50-498/87-08 50-499/87-08 Houston Lighting & Power Company ATTN: J. H. Goldberg, Group Vice President, Nuclear P. D. Box 1700 Houston, Texas 77001 Gentlemen:

<

Thank you for your letter of June 25, 1987, in response to our letter and l

NoticeofViolation(498/8708-01) dated May 29, 1987. We have reviewed your reply and find it responsive to the concerns raised in our Notice of Violatio We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be l maintaine Sincere f, l l

,

> . MM K E. G gliardo, Chief

..//V Reacto Projects Branch l

l cc:

Houston Lighting & Power Company ATTN: M. Wisenberg, Manager, Nuclear Licensing P. O. Box 1700 Houston, Texas 77001 Houston Lighting & Power Company ATTN: Gerald E. Vaughn, Vice President Nuclear Operations P. O. Box 1700  ;

Houston, Texas 77001 p[

'

Texas Radiation Control Program Director i }

l Q731003aa70724 i

o ^ DUCK 05000498 PDR

'

,

'

In Reply Refer To: dRil 2 4 Md7 Dockets: 50-498/87-08 50-499/87-08 Houston Lighting & Power Company ATTN: J. H. Goldberg, Group Vice President, Nuclear P. 0. Box 1700 Houston, Texas 77001 Gentlemen:

Thank you for your letter of June 25, 1987, in response to our letter and Notice of Violation (498/8708-01) dated May 29, 1987. We have reviewed your reply and find it responsive to the concerns raised in our Notice of Violatio We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintaine

Sincerely, Cricinal Signal aj

.

'd+P..Jaudon J. E. Gagliardo, Chief Reactor Projects Branch cc:

Houston Lighting & Power Company ATTN: M. Wisenberg, Manager, Nuclear Licensing P. O. Box 1700 Houston, Texas 77001 Houston Lighting & Power Company ATTN: Gerald E. Vaughn, Vice President Nuclear Operations P. O. Box 1700 Houston, Texas 77001 Texas Radiation Control Program Director f,/

-

bcc: (seenextpage)

, , A PI 7%f!3 C: PPB /C e Q:RF B \

HFBundy:cs ' GLConstable A/JEGkglidrdo 7/zt/87 7/n-/87 7g4f87

-

-

Houston Lighting & Power Company -2-bcc to DM8 (IE01)

bec distrib. by RIV:

RPB DRSP RRI-0PS R. D. Martin, RA RRI-CONS Section Chiaf (RPB/C)

RPSB MIS System j RIV File D. Weiss, RM/ALF RSTS Operator R. Pirfo, OGC i R. G. Taylor, RPB/C RSB ]

Project Inspector, RP8 R. Hall 1 P. Kadambi, NRR Project Manager i l

_ ____-__ _ ___ -