Text
. - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - . _ _ _ _ _
,
a.
.
'
W 2 81989
.'
-
In Reply Refer To:
Dockets: 50-498/89-35
50-499/89-35
Houston Lighting & Power Company
ATTN:
G. E. Vaughn, Group
Vice President, Nuclear
P.O. Box 289
.Wadsworth, Texas 77483
Gentlemen:
j
This refers. to the inspection conducted by Messrs. D._ R. Hunter', D. L.- Kelley,
D. L. Garrison, and L.-.T.
Ricketson of this cffice during the period of
August 14-16, 1989, of activities authorized by NRC Operating Licenses'NPF-76
and NPF-80 for the South Texas Project, Units 1 and 2, and.to the discussion of
our findings with you and other members of your staff at the conclusion of the
inspection.
The area examined during the inspection regarded the inadvertent contamination
of portions of the auxiliary steam condensate return' system and inorganics
holding basin. Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with
personnel, and observations-by the inspectors. The inspection findings are
documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
l
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
l
of the NBC's " Rules of Practice," Part 2 Title 10, Code of Federal
Regulations. -Your.. response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying . Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
l
by the Paperwork Reduction Act of 1980, PL 96-511~.
I
RIV:0PS*
RI:0PS*
PI:0PS*
C:0PS*
RI:DRSS*
.C:DRSS* D:DRS*
DHunter:lm
DKelley
DGarrison JEGagliardo LRicketson RBaer
LJCallan
/ /89
/ /89
/z /89
/. /89'
/ '/89
/ /89
/ . /89
- DRP
l
'
Mil oan
1
l
'f
/89
- previously concurred
.9t
m~m< m-,
a
ums
eDC
f.
.
1
'
.
.
-
.
Houston Lichting & Power Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely.
OdginalSignedBy:
Thomas P.Gwynn
Janes L. Milhoan, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation.
2.
Appendix B - NRC Inspection Report'
50-498/89-35
50-499/89-35
cc w/ enclosures:
Central Power & Light Company
ATTN:
.R. L. Range /R. P. Verret
P.O. Box 2121
Corpus Christi, Texas 78403
City of Austin Electric Utility
ATTN:
R. J. Miner,-Chief Operating
Officer (2 copies)
721 Barton Springs Road
Newman & Holtzinger, P.C.
ATTN: . J. R. Newman, Esquire
~
1615 L Street, N.W.-
Washington, D.C.
20036
City Public Service Board
ATTN:'.R. J. Costello/M. T. Hardt
P.O.' Box 1771
San Antonio, Texas 78?96
Houston Lighting & Power Company
_
ATTN: Licensing Representative
i
Suite 610
!
i
Three Metro Center
Bethesda, Maryland 20814
i
Houston Lighting & Power Company
ATTN:. Rufus S.-Scott, Associate
General Counsel
1
P.O. Box 1700
Houston, Texas 77001
I
i
l
-
-
_
-_
_a
-.
_ - .
._
_
__
-
-
,
.
..
.
.
-
.
Houston Lighting & Power Company-
-3-
,
Reco'rds Center..
1100 Circle 75 Parkway
Atlanta, Georgia 30339-3064
Dr. Joseph M. Pendrie
.-
50 Bellport Lane
i
Bellport,'New York 11713
1
1
Texas Radiation Contrcl Program Director
bcc to DMB (IE01)
bec distrib. by RIV:
- DRP
- RRI
- SectionChief(DRP/D)
~*DRS (2 copies)
.
-* MIS System
- RPB-DRSS
Lisa Shea, RM/ALF
- RIY File
R. Bachmann, OGC.
- RSTS Operator.
- G. Dick, NRR Project Mana
13-D-18)
- Project Engineer (DRP/D) ger (MS:*R. D. Martin'
- D. R. Hunter
- J. E. Gagliardo
,
- D. L. Kelley
- D. L. Garrison
- L. T. Ricketson
- R. Baer
- w/766
-
l
l
j
I
!
'
-