Submits Corrected First Page of Cover Ltr Re Insp Repts 50-498/99-06 & 50-499/99-06 Conducted on 990221-0403.Subj Line Was Corrected
ML20206S325
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/12/1999
From: Tapia J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cottle W
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20206S324 List:
References
50-498-99-06, 50-498-99-6, 50-499-99-06, 50-499-99-6, NUDOCS 9905210098
Download: ML20206S325 (2)


Text

.

. .

J* **%g UNITED STATES y '.

NUCLEAR REGULATORY COMMISSION

$ E REGloN IV 611 RYAN PLAZA DRIVE, sulTE 400 lll

,, g ARLINGTON, TEXAS 76011-8064 MAY I 2 899 William T. Cottle, President and Chief Executive Officer STP Nuclear Operating Company P.O. Box 289 Wadsworth, Texas 77483 SUBJECT: NRC INSPECTION REPORT NO. 50-498/99-06; 50-499/99-06

Dear Mr. Cottle:

,

This refers to the inspection conducted on February 21,1999 through April 3,1999, at the South Texas Project Electric Generating Station, Units 1 and 2, facility.

During the 6 week period covered by this inspection, your conduct of activities at the South Texas Project facilities was generally characterized by safety-conscious operations, sound maintenance and engineering practices, and careful radiological work controls.

Based on the results of this inspection, the NRC has also determined that three violations of NRC requirements occurred. These violations are being treated as noncited violations (NCVs),

consistent with Appendix C of the Enforcement Policy. These NCVs are described in the subject inspection report. If you contest the violation or severity level of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region IV, and the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its enclosure, and your response will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincer ly, f

Jo h4 h I. Tapia, Chi f P oje t Branch A i ivisi of Reactor Projects l

Docket Nos.: 50-498 50-499 License Nos.: NPF-76 NPF-80

.

9905210098 990512 PDR ADOCK 05000498 i G PDR

_

.

. . . .

STP Nuclear Operating Company -4 E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator Resident inspector DRP Director DRS-PSB DRS Director MIS System Branch Chief (DRP/A) RIV File Project Engineer (DRP/A) R. Bachmann, OGC (MS: 15-B-18)

Branch Chief (DRP/TSS)

!

l I

l

DOCUMENT NAME: R:\._STP\ST906RP.REV To receive copy of document, Indicate in box: "C" = Copy without enclosures *E' = Copy with enclosures 'N' = No copy RIV:PE l C:DRPX4) J l l l ,