IR 05000498/1987014

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Repts 50-498/87-14 & 50-499/87-14 on 870323-26 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness & Security Organization
ML20214K137
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/29/1987
From: Joseph Kelly, Yandell L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20214K119 List:
References
50-498-87-14, 50-499-87-14, NUDOCS 8705280336
Download: ML20214K137 (1)


Text

. _ _ _ - - -

'

. .

qe APPENDIX

, U.S. NUCLEAR REGULATORY COMMISSION i REGION IV NRC Inspection Report: 50-498/87-14 Construction Permits: CPPR-128

50-499/87-14 CPPR-129 I

I Dockets: 50-498 50-499-Licensee: Houston Lighting and Power Company-(HL&P)

P. O. Box 1700 Houston, Texas 77001 Facility Name: South Texas Project, Units 1 and 2 Inspection At: South Texas Project, Matagorda County, Texas Inspection Conducted: March 23-26, 1987 Inspector: .

M -

. c, , Mb N J 'mes . F. Kelly, Senior Securit @ pector Date \

Em ncy Preparedness and Safegdards Programs Section

'

Approved- 1 Chi bNb 24 '87 L. A. Yan' dell, Chief, Emergency Preparedness D&te and Safeguards Programs Section Inspection Summary Inspection Conducted March 23-26, 1987 (Report 50-498/87-14; 50-499/87-14)

Areas Inspected: Routine, announced inspection of the security plan and implementing procedures; management offectiveness; security organization; security program audit; records and reports; testing and maintenance; locks, keys, and combinations; physical barriers protected areas; physical b'arriers

- vital areas; security system power supply; lighting; compensatory measures; assessment aids; access control personnel; access control packages; access control - vehicles; detection aids protected areas; detection aids - vital' l areas; alarm stations'; communications; personnel training and qualification -

general requirements;- and safeguards contingency plan - implementation revie Results: Within the areas inspected, no violations were identifie ENCLOSURE CONTAINS PDR 98 . .

G ADOCK0500gDR ,m UPON SEPARATION THIS

'

PAGE IS DECONTROLLE _-__ - __