IR 05000498/1987050

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in Insp Rept 50-498/87-50 & 50-499/87-50
ML20237E480
Person / Time
Site: South Texas  
Issue date: 12/23/1987
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 8712290022
Download: ML20237E480 (2)


Text

_ _ _ _ _ _ _ -

.

.-_

_

. _ _

--

-_

_ _ _ - _ _ _ _ _

%

'*

..,..,,..,

-

,

.

..

i

-

1, N,

'N n,

In Reply Refer To:

DEC 23 W-Dockets: -50-498/87-50 50-499/87-50 L

Houston Lighting'& Power' Company ATTN:.J. H.-Goldberg, Group Vice President, Nuclear-P.O. Box 1700 Houston, Texas 77001

.

Gentlemen:

Thank you forJyour letter 'of November 20,~ 1987, in response.to'our l'etter l

and Notice of Violation dated October 22, 1987.fWe'have reviewed your reply.

'

and find-it responsive to the concerns raised in ourLNotice of Violation. We:

. will review the implementation of your;correctiv'e actionsL during fa future.

inspection'to determine that full compliance has been achieved and will<be-maintained.

Siiicerely,

'

Ori !nal S!gned.By S

A.'B. Deach.

'

'

L.-J. Callan, DirectorL Division.of Reactor Projectsi cc:

Houston Lighting & Power Company

' ATTN:

M. Wisenberg, Manager-Nuclear Licensing P.O.' Box 1700 Houston, Texas 77001 Houston Lighting & Power Company ATTN: Gerald E. Vaughn, Vice President Nuclear Operations P.O. Box 1700 Houston, Texas 77001 j~,bg /

RI :D DRP GL table:gb-LJCa'l'an jr/2J/87. g l[/2}/87 r

8712290022971223 PDR ADOCK 05000498

4 DCD

=

_ = _ _ _ _ _ _

.

-- -__-_- - -

.

- _ - _.

. -

..,,

,

(

.

Houston Lighting and Power. Company'

l l-Central Power & Light Company

. ATTN:

R. L. Range /R. P. Verret P.O. Box ?121 Corpus Christi, Texas 78403 City Public Service Board ATTN:

R. J. Costello/M. T. Hardt P.O. Box 1771 San Antonio,. Texas 78296 L

l City of Austin L

ATTN:

M. B. Lee /J. E. Malaski P.O. Box 1088 Austin, Texas 78767-8814 Texas Radiation Control Program Director I

bec to DMB (IE01) - DRP and DRS bcc distrib. by RIV:

  • DRP
  • RRI-0PS R. D. Martin, RA
  • RRI-CONST.
  • Section Chief (DRP/D)

RPSB-DRSS

  • MIS System
  • RIV File
  • Lisa'Shea, RM/ALF
  • RSTS Operator R. Bachmann, OGC-
  • H.-Bundy
  • P. Kadambi, NRR Project Manager
  • R.' Taylor
  • TSS
  • R. Hall
  • DRS D. Powers

!

  • w/766

,

l l

l

l l

,

- - - -

.

.

.

..

.

The Light

.

Company n-, use n,m

>> u m noo n - i., ~,,ooi aumsmo

_

November 20, 1987 ST-HL-AE-24 23 File No.:

G2.4

__.

,_IK 10CFR2.201

-

r ii, ! -

-

j

t,

-

NOV 211981

-

U. S. Nuclear Regulatory Commission

'

Attention:

Document Control Desk

--

'

Washington, DC 20555 g

-.. -

South Texas Project Unit 1 Docket No. STN 50-498 Response to Notice of Violation 8750-01 Houston Lighting & Power Company has reviewed Notice of Violation 8750-01 dated October 22, 1987 and submits the attached response pursuant to 10CFR 2.201.

t If you should have any questions on this matter, please contact Mr. S.M. Head at (512) 972-8392.

G. E. Vaughn Vice President

Nuclear Plant Operations i

GEV/SMH/yfw Attachment:

Response to Notice of Violation 8750-01 l

l l

l

~

.

s\\

NL. RESP. NOTICE

',

-

s

{pg O/0 3N l

I h' $ b W

. _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _

+

..

.

. t

.

.

Houston Lighting & Power Co>npany

,

ST-HL-AE-24 23 File No.:

G2.4 Page 2 cc:

Regional Administrator, Region IV Nuclear Regulatory Commission

611 Ryan Plaza Drive, Suite 1000 i

{

Arlington, TX 76011'

N. Prasad Kadambi, Proj ect Manager U. S. Nuclear Regulatory Commission 7920 Norfolk-Avenue i

Bethesda, MD 20814 Dan R. Carpenter Senior Resident Inspector / Operations e/o U. S. Nuclear Regulatory Commission P. O. Box 910

,

Bay City, TX 77414 J. R. Newman, Esquire i

Newman & Holt:inger, P.C.

1615 L Street, N.W.

Washington, DC 20036 R. L. Range /R. P. Verret Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403 M. B. Lee /J. E. Malaski City of Austin P. O. Box 1088 Austin, TX 78767-8814 R. J. Costello/M. T. Hardt City Public Service Board

~

j P. O. Box 1771 i

San Antonio, TX 76296 Rufus S. Scott

'

Associate General Counsel Houston Lighting & Power Company P. O. Box 1700 Houston, TX 77001 Revised 11/17/87

.

n

_ _ _ _ _ -._

_

l

l*e'

l

.

-

..

,

l l

Attachment I

ST-HL-AE-2423 File No.:

G2.4 Page 1 of 1

,

South Texas Proj ect l

Unit 1 Docket No. STN 50-498 Response to Notice of Violation 8750-01 I.

Statement of Vi,clation Failure To Follow The Approved Procedure For Performing Maintenance

,,

i I

l South Texas Project (STP) Technical Specifications (TS), Section 6.0 l

(Administrative Controls), Specification 6.8.1.a requires that written

)

procedures shall be established, implemented, and maintained for the

{

control of maintenance and repair activities.

Plant Procedure OPGP03-ZM-0003 implements the requirements of this TS including a

provision.110 wing emergency repairs without the use of an approved l

Maintenance Work Request (MVR).

j

Contrary to the above, a repair activity was observed on the fuel i

handling system transfer cart shear pin in violation of the procedure.

l An MWR had not been approved and the repair work was improperly commenced on an emergency basis when there was no direct safety hazard to personnel j

'

or equipment which would justify an emergency classification.

i l

II. Reason for Violation j

I The root cause for this violation was a lack of understanding on the part

)

of the shift supervisors of what constitutes an emergency situation and I

when an Emergency MWR could be used.

III. Corrective Action Taken and Results Achieved At the time of discovery of this situation an appropriate MWR war l

initiated to document and correct the problem.

j IV. Corrective Steps Taken to Prevent Recurrence By procedure, only shift supervisors can authorize an Emergency MWR.

j Accordingly, all shift supervisors have been instructed by plant l

management as to intent and proper use of an Emergency MWR.

In addition, i

the MWR procedure has been revised to add a more explicit definition of when an Emergency MWR can be initiated.

.

V.

Date of Full Compliance

STP is in full compliance at this time.

i j

NL. RESP. NOTICE

_ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_

.]