IR 05000498/1987025

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Repts 50-498/87-25 & 50-499/87-25 on 870420 & 0427-0501 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Procedures,Security Organization,Audits,Records & Repts
ML20215M145
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/03/1987
From: Earnest A, Joseph Kelly, Yandell L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20215M136 List:
References
50-498-87-25, 50-499-87-25, NUDOCS 8706260291
Download: ML20215M145 (2)


Text

\

.  !

,

l

!

APPENDIX U.S. NUCLEAR REGULATORY COMMISSION REGION IV ,

!

NRC Inspection Report: 50-498/87-25 Construction Permits: CPPR-128 50-499/87-25 CPPR-129 !

Dockets: 50-498 50-499 Licensee: Houston Lighting & Power Company (HL&P)

P. O. Box 1700 i Houston, Texas 77001 Facility Name: South Texas Project, Units 1 and 2 (STP)

Inspection At: South Texas Project, Matagorda County, Texas Inspection Conducted: April 20 and 27 through May 1, 1987

-

Inspector: T ,,,i. .

r hI( er / TLu c $ 7 J. A.j f. Kelly 7 Senior PhysMalsSecurity Date (Specialist, Radiological Protection and Safeguards Branch 1

<

CtDb k AT B. Earnest, Physi cal 01 d/U M Security Specialist d!3/0)

Date RadiologicalProtectpnandSafeguardsBranch Approved: CtAA d/3/22 L. A. Yandell, Chief, Radiological Protection Date and Safeguards Branch Inspection Summary Inspection Conducted April 20 and 27 through May 1, 1987 (Report 50-498/87-25; 50-499/87-25)

Areas Inspected: Routine, announced inspection of security plan and procedures, management effectiveness, security organization, audits, records and reports, testing and maintenance, locking systems, physical barrier - ,

ENCLOSURE CONTAINS

  • .

8706260291 870622 UPON SEPARATION THIS PDR ADDCK 0500049 PDR G - PAGE IS DECONTROLLE ..

. . . , . . . . . . . . .. . . . _ . . . . . . . . . . . . .

. . . . .

. . . . . . . . . . . . . . . . . . _ . . . , . . . . . _ _ _ , . . . . .

protected areas, physical barrier - vital areas, power supply, lighting, compensatory measures, assessment aids, access control personnel, access control packages, access control - vehicles, detection aids protected areas, detection aids - vital areas, alarm stations, communications, personnel training and qualifications, safeguards contingency plan, and the protection of safeguards informatio Results: Within the areas inspected, no violations or deviations were identifie l

!

!

!

.l l

I ENCLOSURE CONTAINS .

UPON SEPARATION THIS )

I PAGE IS DECONTROLLE l i

I

!

1

-

-1 l

{

I