'd
,-
,
,
.
.
SEP26W
'In Reply Refer To:
Dockets: 50-498/89-30
50-499/89-30
Houston Lighting & Power Company
ATTN:
G. E. Vaughn, Group Vice
l
President, Nuclear
P.O. Box 289
Wadsworth, Texas 77483
Gentlemen:
.
.
This refers to the inspection conducted by Messrs. J. E._ Bess, R. J. Evans,
J. I. Tapia, D. L. Garrison, and D. M. Hunnicutt of this office-during the
period August ~ 1-31, 1989, of activities authorized by NRC Operating
Licenses NPF-76 and NPF-80 for the South Texas Project, Units 1 and 2, and to
the discussion of our findings with Mr. S. L. Rosen and other members of your
staff at the conclusion of the inspection.
l
1
'
Areas examined during the inspection included plant status, onsite followup of
plant events, cnsite followup of written reports of nonroutine events,
preparation f or refueling, refueling activities operational safety
verification, monthly maintenance observations, monthly surveillance
observations, and testing of piping support and restraint systems. < Within
these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel, and observations by the
inspectors. The inspection findings are-documented in the enclosed inspection
report.
Within the scope of the inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is_ identified in
paragraph 4 of the enclosed report.
Should you have ar.f questions concerning this inspection, we will be pleased to
discuss them wit'a you.
Sincerely,
I
0%inalSigned By:
1
Thomas P.Gwynn
!
James L. Milhoan, Director
i
Division of Reactor Projects-
J
Enclosure:
(see next page)
j
- RIV: SRI
- RI
- RI'
- DRP/D
- C:DRP/D
P4
JEBess/lr RJEvans JITapia
DLGarrison DMHunnicutt EJHolle
LMilhoan
/ /89
/ /89
/ /89
/ /89
/ /89
/ /89
/n/89
.
-
- previously Concurred
b
k.-
!
9910030541 890926
'
)
<
!
ADOCK 05000498
O
FDC
_ - _ _ _ _ _ _ _ .
_ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _
.]
l
!
.
Houston Lighting & Power Company
-2-
'
l
.
-Enclosure:
Appendix - NRC Inspection Report
,50-498/89-30
50-499/89-30
cc w/ enclosure:
-Central Power & Light Company
ATTN:
R. L. Range /R. P. Verret
l
P.O. Box 2121
l
Corpus Christi, Texas 78403
City of Austin Electric Utility
ATTN:
R. J. Miner, Chief Operating
Officer (2 copies)
1
721 Barton Springs Road-
'
Newman & Holtzinger, P.C.
ATTN:
J. R. Newman, Esquire
,
1615 L Street, N.W.
Washington, D.C.
20036
City Public Service Board
ATTN:
R. J. Costello/M. T. Hardt
P.O. Box 1771
San Antonio, Texas 78296
Houston Lighting & Power Company
ATTN: Licensing Representative
.'
Suite 610
Threo Metro Center
Bethesda, Maryland 20814
Houston Lighting & Power Company
i
ATTN: Rufus S. Scott, Associate
'
General Counsel
I
P.O. Box 1700
Houston, Texas 77001
INPD
l
Records Center
1100 Circle 75 Parkway
Atlanta, Georgia 30339-3064
j
Dr. Joseph M. Hendrie
50 Bellport Lane
l
Bellport, New York 11713
Texas. Radiation Control Program Director
!
!
i
I
_ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ __
._J
g
__ _ _ _ _ _ _ _ _ _ _ -
.
1
,'
?
.
l
Houston Lighting & Power Company
-4-
i
l
l
l
bec to DMB (IE01)
bec distrib. by RIV:
l
i
- DRP
- RRI
I
'
!
- SectionChief(DRP/D)
- DRS
- MIS System
- RPB-DRSS
Lisa Shea, RM/ALF
- RIV File
R. Bachmann, DGC
- RSIS Operator
- G. Dick, NRR Project Manager (MS:
13-D-18)
- R. D. Martin
- w/766
1
.
l
l
l
t
i
i
.l
I
l
i