IR 05000498/1987012
| ML20235S403 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 07/14/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20235S405 | List: |
| References | |
| NUDOCS 8707210650 | |
| Download: ML20235S403 (2) | |
Text
-
JUL I 4 1987 In Reply Refer To:
Dockets:
50-498/87-12 50-499/87-12
,
Houston Lighting & Power Company ATTN:
J. H. Goldberg, Group Vice President, Nuclear P. O. Box 1700 Houston, Texas 77001 Gentlemen:
Thank you for your letter of June 12, 1987, in response to our letter dated May 12, 1987. We have reviewed your reply and find it responsive to the concerns raised in our letter. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.
Sincerely, J. P. Jaudon J. E. Gagliardo, Chief Reactor Projects Branch cc:
Houston Lighting & Power Company ATTN:
M. Wisenberg, Manager, Nuclear Licensing P. O. Box 1700 l
Houston, Texas 77001 l
l Houeton Lighting & Power Company ATTN: Gerald E. Vaughn, Vice President Nuclear Operations P. O. Box 1700 Houston, Texas 77001 Texas Radiation Control Program Director l
l bec:
(see next page)
RIV: EPA C:NMEPB }1 C:RPB/C % _ C P I
NMTerc;ap WLFisher p lConstable EGagEiardo 7 //o/87 7 //o/87 7 / <> /87 j/g/87 8707210650 070714 C
[y PDR ADOCK 05000498 Y
G PDR i\\
_--
r],
'<
i Houston Power & Lighting Company-2-
bcc w/ltr dtd 6/12/87 from licensee:
DMB (IE35)
RPB DRSP Resident Inspector-OPS R. D. Martin, RA Resident Inspector-CONST.
Section Chief (RPB/C)
RPSB MIS SYSTEM RIV File D. Weiss, RM/ALF RSTS Operator R. Pirfo, OGC R. G. Taylor, RPB/C RSB Inspector Section Chief L. A. Yandell R. L. Bangart R. E. Hall Project Inspector, RPB P. Kadambi, NRR Project Inspector D. B. Matthews, NRR 1