IR 05000498/1987043

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Repts 50-498/87-43 & 50-499/87-43 on 870622-0820 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Plans & Procedures,Mgt Effectiveness,Security Organization & Audits
ML20236S794
Person / Time
Site: South Texas  
Issue date: 11/12/1987
From: Caldwell R, Earnest A, Joseph Kelly, Yandell L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20236S784 List:
References
50-498-87-43, 50-499-87-43, NUDOCS 8711300097
Download: ML20236S794 (2)


Text

_ - _ _ _

_-

'

..

.

l-

-APPENDIX l-U.S. NUCLEAR REGULATORY COMMISSION

!-

-

REGION IV

l

,

NRC Inspection Report:

50-498/87-43 Construction Permits:

CPPR-128 50-499/87-43 CPPR-129 Dockets: '50-498

'50-499

' Licensee:

Houston Lighting & Power Company (HL&P)

P. O. Box 1700 Houston, Texas 77001 Facility Name:

South Texas Project, Units 1 and 2 (STP)

Inspection At:

STP, Matagorda County, Texas Inspection Conducted:

June 22 through August 20, 1987 Inspectors:

RM.

?

I kbdlO Nfl (

{J.A'.F.KelTy,SeniorSecurityInspector

.

Date

Radiological Protection and Safeguards Branch (1

/d)

btY)l0lhl'

.

.

R.* A. 'Caldwell, Secur~ity Inspector Da'te

/

Radiological Protection nd Safeguards Branch W / N / $$)

A. B. Ehined, Security Inspector Date

'

Radiological Protection and Safeguards Branch Other Inspectors:

D. R. Carpenter, Senior Resident Inspector, Project Section D C. E. Johnson, Senior Resident Inspector, Project Section D B. L. Bartlett, Resident Inspector, Project Section A W. B. Jones, Resident Inspector, Project Section C T. Reis, Resident Inspector, Project Section 8 Approved:

L.;

fMC R!)7./87 L. h.'YanBell, Chief, Radiological Protection Date and Safeguards Branch i

g71123

'

ENCLOSURE CONTAINS g

13000 43.

(

UPON SEPARATION THIS PAGE IS DECONTROLLE _ -- _..

l.;'

-.. -

.

.

.

L a

,

\\

-I

!

Inspection Summary Inspection Conducted June 22 through August 20, 1987 (Report 50-498/87-43; 50-499/87-43)

,

Areas Inspected:

Pre-operational, announced inspection of security plans and

procedures, management effectiveness, security organization, audits,. reports i

and-records, testing and maintenance, locking systems, physical barriers for

]

both protected'and vital areas, power supply, lighting, compensatory measures, I

assessment aids, access control for personnel, packages and vehicles, detection aid for both.the vital and protected areas, alarm stations, communications, personnel training and qualifications, safeguards contingency responses, and'

-

the protection of safeguards information.

Results: Within the 23 areas inspected, no violations or deviations were identified.

ENCLOSURE CONTAINS.

UPON SEPARATION THIS PAGE IS DECONTROLLED.

l

.

-

.-___m____