IR 05000498/1987043
| ML20236S794 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 11/12/1987 |
| From: | Caldwell R, Earnest A, Joseph Kelly, Yandell L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20236S784 | List: |
| References | |
| 50-498-87-43, 50-499-87-43, NUDOCS 8711300097 | |
| Download: ML20236S794 (2) | |
Text
_ - _ _ _
_-
'
..
.
l-
-APPENDIX l-U.S. NUCLEAR REGULATORY COMMISSION
!-
-
REGION IV
l
,
NRC Inspection Report:
50-498/87-43 Construction Permits:
CPPR-128 50-499/87-43 CPPR-129 Dockets: '50-498
'50-499
' Licensee:
Houston Lighting & Power Company (HL&P)
P. O. Box 1700 Houston, Texas 77001 Facility Name:
South Texas Project, Units 1 and 2 (STP)
Inspection At:
STP, Matagorda County, Texas Inspection Conducted:
June 22 through August 20, 1987 Inspectors:
RM.
?
I kbdlO Nfl (
{J.A'.F.KelTy,SeniorSecurityInspector
.
Date
Radiological Protection and Safeguards Branch (1
/d)
btY)l0lhl'
.
.
R.* A. 'Caldwell, Secur~ity Inspector Da'te
/
Radiological Protection nd Safeguards Branch W / N / $$)
A. B. Ehined, Security Inspector Date
'
Radiological Protection and Safeguards Branch Other Inspectors:
D. R. Carpenter, Senior Resident Inspector, Project Section D C. E. Johnson, Senior Resident Inspector, Project Section D B. L. Bartlett, Resident Inspector, Project Section A W. B. Jones, Resident Inspector, Project Section C T. Reis, Resident Inspector, Project Section 8 Approved:
L.;
fMC R!)7./87 L. h.'YanBell, Chief, Radiological Protection Date and Safeguards Branch i
g71123
'
ENCLOSURE CONTAINS g
13000 43.
(
UPON SEPARATION THIS PAGE IS DECONTROLLE _ -- _..
l.;'
-.. -
.
.
.
L a
,
\\
-I
!
Inspection Summary Inspection Conducted June 22 through August 20, 1987 (Report 50-498/87-43; 50-499/87-43)
,
Areas Inspected:
Pre-operational, announced inspection of security plans and
procedures, management effectiveness, security organization, audits,. reports i
and-records, testing and maintenance, locking systems, physical barriers for
]
both protected'and vital areas, power supply, lighting, compensatory measures, I
assessment aids, access control for personnel, packages and vehicles, detection aid for both.the vital and protected areas, alarm stations, communications, personnel training and qualifications, safeguards contingency responses, and'
-
the protection of safeguards information.
Results: Within the 23 areas inspected, no violations or deviations were identified.
ENCLOSURE CONTAINS.
UPON SEPARATION THIS PAGE IS DECONTROLLED.
l
.
-
.-___m____